| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500.00/MTH) | 9.00 | MTH |
12.00
| 11.00 | 1.00 | $500.00 | $500.00 |
| 5 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.78
| 0.72 | 0.06 | $112,000.00 | $6,720.00 |
| 10 | SURFACE WATER DIVERSION STRUCTURE (STAGE TWO) | 1.00 | LS |
0.97
| 0.96 | 0.01 | $65,000.00 | $650.00 |
| 16 | REMOVAL AND DISPOSAL OF LBP/LCP | 1.00 | LS |
1.00
| 0.95 | 0.05 | $54,000.00 | $2,700.00 |
| 18 | IMPLEMENTATION OF THE SSHSP | 9.00 | MTH |
13.00
| 12.00 | 1.00 | $35.00 | $35.00 |
| 33 | TEMPORARY BALLAST (STAGE TWO) | 1.00 | LS |
0.77
| 0.76 | 0.01 | $10,000.00 | $100.00 |
| 36 | STRUCTURE EXCAVATION (BRIDGE) | 2,170.00 | CY |
2,170.00
| 2,069.00 | 101.00 | $37.00 | $3,737.00 |
| 47 | STRUCTURE CONCRETE (BRIDGE) | 734.00 | CY |
583.00
| 303.00 | 280.00 | $895.00 | $250,600.00 |
| 48 | STRUCTURE CONCRETE (FOOTING) | 437.00 | CY |
437.00
| 312.00 | 125.00 | $300.00 | $37,500.00 |
| 57 | BAR REINFORCING STEEL (BRIDGE) | 196,000.00 | LB |
164,201.00
| 112,701.00 | 51,500.00 | $1.18 | $60,770.00 |
| 81 | 24" RUBBER GASKETED RCP, 1500 D | 11.00 | LF |
11.00
| 0.00 | 11.00 | $420.00 | $4,620.00 |
| 89 | 4" PVC SCH 80 DRAIN PIPE | 64.00 | LF |
64.00
| 26.00 | 38.00 | $30.00 | $1,140.00 |
| 94 | TRAFFIC CONTROL (STAGE 2, PHASE 2) | 1.00 | LS |
0.90
| 0.80 | 0.10 | $2,400.00 | $240.00 |
| 97 | TEMPORARY RAILING (TYPE K) | 500.00 | LF |
531.00
| 528.00 | 3.00 | $31.00 | $93.00 |
| 99 | FLASHING ARROW SIGN | 2.00 | EA |
1.70
| 1.63 | 0.07 | $5,300.00 | $371.00 |
| 100 | CHANGEABLE MESSAGE SIGN | 3.00 | EA |
1.84
| 1.77 | 0.07 | $15,500.00 | $1,085.00 |
| S-39 | OFFICE FACILITY | | MTH |
2.50
| 1.50 | 1.00 | $2,500.00 | $2,500.00 |
| S-40 | IMPLEMENTATION OF SURFACE WATER DIVERSION PLAN PHASE 2 | | MTH |
3.00
| 2.00 | 1.00 | $1,342.42 | $1,342.42 |