| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500.00/MTH) | 9.00 | MTH |
15.00
| 14.00 | 1.00 | $500.00 | $500.00 |
| 5 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.96
| 0.90 | 0.06 | $112,000.00 | $6,720.00 |
| 10 | SURFACE WATER DIVERSION STRUCTURE (STAGE TWO) | 1.00 | LS |
1.00
| 0.99 | 0.01 | $65,000.00 | $650.00 |
| 12 | REMOVE SURFACE WATER DIVERSION STRUCTURE (STAGE TWO) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $35,000.00 | $35,000.00 |
| 18 | IMPLEMENTATION OF THE SSHSP | 9.00 | MTH |
16.00
| 15.00 | 1.00 | $35.00 | $35.00 |
| 33 | TEMPORARY BALLAST (STAGE TWO) | 1.00 | LS |
1.00
| 0.79 | 0.21 | $10,000.00 | $2,100.00 |
| 50 | MINOR CONCRETE (BRIDGE CURB RAMP) | 2.00 | CY |
2.00
| 1.00 | 1.00 | $3,000.00 | $3,000.00 |
| 52 | CONCRETE BARRIER (TYPE 26 MODIFIED W/ SIDEWALK) | 150.00 | LF |
150.00
| 123.00 | 27.00 | $350.00 | $9,450.00 |
| 53 | CONCRETE BARRIER (TYPE 26 MODIFIED W/O SIDEWALK) | 30.00 | LF |
30.00
| 16.00 | 14.00 | $275.00 | $3,850.00 |
| 56 | AESTHETIC TREATMENT FOR CONCRETE BARRIER | 238.00 | LF |
238.00
| 186.00 | 52.00 | $200.00 | $10,400.00 |
| 59 | JOINT SEAL | 364.00 | LF |
364.00
| 145.60 | 218.40 | $28.00 | $6,115.20 |
| 70 | PCC CURB & GUTTER, TYPE A2-8 | 1,066.00 | LF |
887.50
| 269.50 | 618.00 | $36.00 | $22,248.00 |
| 71 | PCC WALK, 4" THICK | 6,253.00 | SF |
5,096.00
| 1,766.00 | 3,330.00 | $6.50 | $21,645.00 |
| 72 | PCC CURB RAMP, 4" THICK | 22.00 | SF |
518.00
| 328.00 | 190.00 | $18.00 | $3,420.00 |
| 73 | PCC DRIVEWAYS, 6" THICK | 886.00 | SF |
886.00
| 78.00 | 808.00 | $9.00 | $7,272.00 |
| 74 | DETECTABLE WARNING SURFACE | 90.00 | SF |
39.00
| 24.00 | 15.00 | $75.00 | $1,125.00 |
| 97 | TEMPORARY RAILING (TYPE K) | 500.00 | LF |
540.00
| 537.00 | 3.00 | $31.00 | $93.00 |
| 99 | FLASHING ARROW SIGN | 2.00 | EA |
1.91
| 1.84 | 0.07 | $5,300.00 | $371.00 |
| 100 | CHANGEABLE MESSAGE SIGN | 3.00 | EA |
2.00
| 1.98 | 0.02 | $15,500.00 | $310.00 |
| 107 | REMOVE CONTROLLER | 1.00 | EA |
1.00
| 0.00 | 1.00 | $230.00 | $230.00 |
| 108 | REMOVE TYPE 2 STANDARD (COMPLETE) (EXCL. FOUND.) | 1.00 | EA |
1.00
| 0.00 | 1.00 | $600.00 | $600.00 |
| 109 | REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.) | 1.00 | EA |
1.00
| 0.00 | 1.00 | $1,000.00 | $1,000.00 |
| 110 | REMOVE TYPE 17 STANDARD (COMPLETE) (EXCL. FOUND.) | 1.00 | EA |
1.00
| 0.00 | 1.00 | $1,000.00 | $1,000.00 |
| 111 | REMOVE TYPE 26 STANDARD (COMPLETE) (EXCL. FOUND.) | 1.00 | EA |
1.00
| 0.00 | 1.00 | $4,500.00 | $4,500.00 |
| 112 | REMOVE TYPE 17 FOUNDATION | 1.00 | EA |
1.00
| 0.00 | 1.00 | $1,100.00 | $1,100.00 |
| 113 | REMOVE TYPE 26 FOUNDATION | 1.00 | EA |
1.00
| 0.00 | 1.00 | $2,000.00 | $2,000.00 |
| 123 | TYPE 15 STANDARD | 2.00 | EA |
2.00
| 1.00 | 1.00 | $5,000.00 | $5,000.00 |
| 126 | TYPE 15 STANDARD FOUNDATION | 2.00 | EA |
2.00
| 0.00 | 2.00 | $2,900.00 | $5,800.00 |
| 128 | TYPE 26 STANDARD FOUNDATION | 1.00 | EA |
1.00
| 0.00 | 1.00 | $7,000.00 | $7,000.00 |
| 131 | 15' LUMINAIRE MAST ARM | 4.00 | EA |
3.00
| 2.00 | 1.00 | $1,100.00 | $1,100.00 |
| 171 | 3" STREET LIGHT CONDUIT | 748.00 | LF |
744.00
| 444.00 | 300.00 | $40.00 | $12,000.00 |
| 173 | NO. 5 PULL BOX INCL PCC COVER (STREET LIGHT) | 10.00 | EA |
10.00
| 6.00 | 4.00 | $500.00 | $2,000.00 |
| 178 | CONCRETE STREET LIGHT STANDARD WITH 150 W HPS AND 50 W HPS LUMINAIRES (COMPLETE) | 4.00 | EA |
4.00
| 2.00 | 2.00 | $22,000.00 | $44,000.00 |
| 179 | CONCRETE PEDESTRIAN LIGHT STANDARD WITH 50 W HPS LUMINAIRE (COMPLETE) | 2.00 | EA |
2.00
| 1.00 | 1.00 | $10,000.00 | $10,000.00 |
| 180 | CONCRETE STREET LIGHT FOUNDATION PER STD PLAN 431 | 5.00 | EA |
5.00
| 3.00 | 2.00 | $1,700.00 | $3,400.00 |
| 181 | CONCRETE STREET LIGHT FOUNDATION PER STD PLAN 433 | 2.00 | EA |
2.00
| 1.00 | 1.00 | $1,700.00 | $1,700.00 |
| S-39 | OFFICE FACILITY | | MTH |
5.50
| 4.50 | 1.00 | $2,500.00 | $2,500.00 |
|