Los Angeles County Public Works
Project Management Division III
Progress Payment 20
Project Name: Del Mar Avenue Bridge Replacement Over Alhambra Wash
Contractor: Shimmick Construction Company, Inc.
8201 Edgewater Drive, Suite 202
Oakland, CA 94621
Project ID: RDC0012721
Federal Number(s): BRLS-5217 (001)
Original Contract: $5,000,591.90
Awarded: 10/31/2017
Period Ending: 11/20/2019
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
5IMPLEMENTATION OF THE SWPPP1.00LS 1.00 0.960.04$112,000.00$4,480.00
18IMPLEMENTATION OF THE SSHSP9.00MTH 17.00 16.001.00$35.00$35.00
23CONCRETE REMOVAL (NON-REINFORCED)760.00CY 444.00 293.00151.00$60.00$9,060.00
24CONCRETE REMOVAL (REINFORCED)12.00CY 10.15 8.002.15$214.00$460.10
35UNCLASSIFIED EXCAVATION1,299.00CY 1,345.00 1,022.50322.50$35.00$11,287.50
41CRUSHED MISCELLANEOUS BASE898.00CY 934.00 600.50333.50$40.00$13,340.00
42AC PAVEMENT1,343.00TON 979.74 384.29595.45$106.00$63,117.70
794' PICKET RAILING (MODIFIED)238.00LF 238.00 119.00119.00$285.00$33,915.00
80AESTHETIC TREATMENT FOR PICKET RAILING238.00LF 238.00 119.00119.00$222.00$26,418.00
95TRAFFIC CONTROL (STAGE 3, PHASE 2)1.00LS 0.50 0.000.50$3,300.00$1,650.00
96TRAFFIC CONTROL (STAGE 3, PHASE 1)1.00LS 1.00 0.001.00$3,300.00$3,300.00
99FLASHING ARROW SIGN2.00EA 1.98 1.910.07$5,300.00$371.00
100CHANGEABLE MESSAGE SIGN3.00EA 2.07 2.000.07$15,500.00$1,085.00
125TYPE 26 STANDARD1.00EA 1.00 0.001.00$12,800.00$12,800.00
12925' SIGNAL MAST ARM1.00EA 1.00 0.001.00$3,000.00$3,000.00
13040' SIGNAL MAST ARM1.00EA 1.00 0.001.00$3,500.00$3,500.00
13115' LUMINAIRE MAST ARM4.00EA 3.50 3.000.50$1,100.00$550.00
136REMOVE DETAIL 21 (PAINT)3,614.00LF 2,733.00 1,903.00830.00$1.00$830.00
139REMOVE DETAIL 27B (PAINT)5,939.00LF 1,667.00 552.001,115.00$1.00$1,115.00
140REMOVE DETAIL 28 (PAINT)748.00LF 160.00 0.00160.00$1.25$200.00
143REMOVE DETAIL 38A (PAINT)1,053.00LF 480.00 100.00380.00$1.10$418.00
145REMOVE PAVEMENT MARKINGS (PAINT)303.00SF 303.00 288.0015.00$2.00$30.00
146REMOVE 12" STRIPING (PAINT)160.00LF 107.00 77.0030.00$2.50$75.00
148DETAIL 21 (ONE-COAT PAINT)2,470.00LF 2,419.00 2,069.00350.00$0.55$192.50
149DETAIL 24 (ONE-COAT PAINT)1,859.00LF 1,859.00 92.001,767.00$0.35$618.45
150DETAIL 27B (ONE-COAT PAINT)5,418.00LF 3,335.00 2,655.00680.00$0.25$170.00
S-39OFFICE FACILITY MTH 6.50 5.501.00$2,500.00$2,500.00

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $5,075,326.33 $4,880,808.08 $194,518.25
Retained $252,391.31 $242,665.40 $9,725.91
Deducted $0.00 $0.00 $0.00
Due $4,822,935.02 $4,638,142.68 $184,792.34



Contact Office Engineer
Contractor Copy  
P Please consider the environment before printing this report.