Los Angeles County Public Works
Project Management Division III
As-Built 29
Project Name: Del Mar Avenue Bridge Replacement Over Alhambra Wash
Contractor: Shimmick Construction Company, Inc.
8201 Edgewater Drive, Suite 202
Oakland, CA 94621
Project ID: RDC0012721
Federal Number(s): BRLS-5217 (001)
Original Contract: $5,000,591.90
Awarded: 10/31/2017
Period Ending: 12/23/2020
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
1CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $5,000)1.00LS 1.00 1.000.00$5,000.00$0.00
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500.00/MTH)9.00MTH 21.00 21.000.00$500.00$0.00
3CONSTRUCTION SCHEDULE (AS BUILT) (STIPULATED UNIT PRICE OF $1,000)1.00LS 1.00 1.000.00$1,000.00$0.00
4PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $5,000)1.00LS 1.00 1.000.00$5,000.00$0.00
5IMPLEMENTATION OF THE SWPPP1.00LS 1.00 1.000.00$112,000.00$0.00
6SHORING OF OPEN EXCAVATIONS1.00LS 1.00 1.000.00$5,000.00$0.00
7PREPARATION OF THE SURFACE WATER DIVERSION PLAN (STIPULATED UNIT PRICE OF $5,000)1.00LS 1.00 1.000.00$5,000.00$0.00
8IMPLEMENTATION OF THE SURFACE WATER DIVERSION PLAN6.00MTH 7.00 7.000.00$320.00$0.00
9SURFACE WATER DIVERSION STRUCTURE (STAGE ONE)1.00LS 1.00 1.000.00$100,000.00$0.00
10SURFACE WATER DIVERSION STRUCTURE (STAGE TWO)1.00LS 1.00 1.000.00$65,000.00$0.00
11REMOVE SURFACE WATER DIVERSION STRUCTURE (STAGE ONE)1.00LS 1.00 1.000.00$30,000.00$0.00
12REMOVE SURFACE WATER DIVERSION STRUCTURE (STAGE TWO)1.00LS 1.00 1.000.00$35,000.00$0.00
13PREPARATION OF THE LEAD-CONTAMINATED SMP (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 1.000.00$2,500.00$0.00
14EXCAVATION, TRANSPORTATION, AND DISPOSAL OF LEAD CONTAMINATED SOIL78.00TON 95.00 95.000.00$130.00$0.00
15PREPARATION OF THE LBP/LCP REMOVAL PLAN (STIPULATED UNIT PRICE OF $5,000)1.00LS 1.00 1.000.00$5,000.00$0.00
16REMOVAL AND DISPOSAL OF LBP/LCP1.00LS 1.00 1.000.00$54,000.00$0.00
17PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $5,000)1.00LS 1.00 1.000.00$5,000.00$0.00
18IMPLEMENTATION OF THE SSHSP9.00MTH 21.00 21.000.00$35.00$0.00
19OFFICE FACILITIES9.00MTH 11.00 11.000.00$5,000.00$0.00
20MOBILIZATION1.00LS 1.00 1.000.00$500,000.00$0.00
21CLEARING AND GRUBBING1.00LS 1.00 1.000.00$8,000.00$0.00
22RELOCATE EXISTING BUS SHELTER1.00EA 1.00 1.000.00$6,000.00$0.00
23CONCRETE REMOVAL (NON-REINFORCED)760.00CY 771.00 771.000.00$60.00$0.00
24CONCRETE REMOVAL (REINFORCED)12.00CY 10.15 10.150.00$214.00$0.00
25REINFORCED CONCRETE REMOVAL AT EXISTING PARKING STRUCTURE2.00CY 2.00 2.000.00$1,800.00$0.00
26CMU WALL AND FOUNDATION REMOVAL AT EXISTING PARKING STRUCTURE15.00LF 15.00 15.000.00$260.00$0.00
27METAL RAIL REMOVAL AT EXISTING PARKING STRUCTURE25.00LF 25.00 25.000.00$18.00$0.00
28BRIDGE REMOVAL (STAGE ONE)1.00LS 1.00 1.000.00$150,000.00$0.00
29BRIDGE REMOVAL (STAGE TWO)1.00LS 1.00 1.000.00$100,000.00$0.00
30TEMPORARY VERTICAL SHORING (STAGE ONE)1.00LS 1.00 1.000.00$225,000.00$0.00
31TEMPORARY VERTICAL SHORING (STAGE TWO)1.00LS 1.00 1.000.00$200,000.00$0.00
32TEMPORARY BALLAST (STAGE ONE)1.00LS 1.00 1.000.00$30,000.00$0.00
33TEMPORARY BALLAST (STAGE TWO)1.00LS 1.00 1.000.00$10,000.00$0.00
34TEMPORARY UTILITY SUPPORT (AT&T CONDUITS)1.00LS 1.00 1.000.00$60,000.00$0.00
35UNCLASSIFIED EXCAVATION1,299.00CY 1,623.75 1,623.750.00$35.00$0.00
36STRUCTURE EXCAVATION (BRIDGE)2,170.00CY 2,170.00 2,170.000.00$37.00$0.00
37STRUCTURE BACKFILL (BRIDGE)2,000.00CY 2,000.00 2,000.000.00$50.00$0.00
38FILTER MATERIAL (CEMENT TREATED PERMEABLE BASE)8.00CY 8.00 8.000.00$330.00$0.00
39FILTER FABRIC76.00SY 76.00 76.000.00$23.00$0.00
40GEOCOMPOSITE WALL DRAIN4,860.00SF 4,860.00 4,860.000.00$6.00$0.00
41CRUSHED MISCELLANEOUS BASE898.00CY 1,014.00 1,014.000.00$40.00$0.00
42AC PAVEMENT1,343.00TON 1,481.17 1,481.170.00$106.00$0.00
43AC PAVEMENT(DRIVEWAYS)6.00TON 16.00 16.000.00$450.00$0.00
44RECONSTRUCT MANHOLE3.00EA 1.00 1.000.00$2,400.00$0.00
45ADJUST MANHOLE3.00EA 3.00 3.000.00$960.00$0.00
46PCC PAVEMENT111.00CY 102.00 102.000.00$230.00$0.00
47STRUCTURE CONCRETE (BRIDGE)734.00CY 734.00 734.000.00$895.00$0.00
48STRUCTURE CONCRETE (FOOTING)437.00CY 437.00 437.000.00$300.00$0.00
49MINOR CONCRETE (DRAINAGE PAD)2.00CY 2.00 2.000.00$1,900.00$0.00
50MINOR CONCRETE (BRIDGE CURB RAMP)2.00CY 2.00 2.000.00$3,000.00$0.00
51MINOR CONCRETE (BRIDGE SIDEWALK)2.00CY 2.00 2.000.00$3,000.00$0.00
52CONCRETE BARRIER (TYPE 26 MODIFIED W/ SIDEWALK)150.00LF 150.00 150.000.00$350.00$0.00
53CONCRETE BARRIER (TYPE 26 MODIFIED W/O SIDEWALK)30.00LF 30.00 30.000.00$275.00$0.00
54CONCRETE BARRIER (TYPE 26 MODIFIED W/ CURB RAMP)27.00LF 27.00 27.000.00$285.00$0.00
55CONCRETE BARRIER (TYPE 26 MODIFIED W/ SIDEWALK & STEEL COVER PLATE)31.00LF 31.00 31.000.00$580.00$0.00
56AESTHETIC TREATMENT FOR CONCRETE BARRIER238.00LF 238.00 238.000.00$200.00$0.00
57BAR REINFORCING STEEL (BRIDGE)196,000.00LB 196,000.00 196,000.000.00$1.18$0.00
58JOINT SEAL, TYPE A285.00LF 285.00 285.000.00$83.00$0.00
59JOINT SEAL364.00LF 364.00 364.000.00$28.00$0.00
60CATCH BASIN PER STD PLAN 300, W=181.00EA 0.00 0.000.00$22,000.00$0.00
61CATCH BASIN PER STD PLAN 300, W=41.00EA 0.00 0.000.00$5,100.00$0.00
62CATCH BASIN PER STD PLAN 300, W=72.00EA 1.00 1.000.00$6,600.00$0.00
63REINFORCED CONCRETE BLOCK WALL PER STD PLAN 601, TYPE 1 (H=6')52.00LF 41.00 41.000.00$500.00$0.00
64SHOTCRETE REINFORCED WITH WELDED WIRE FABRIC15.00SF 15.00 15.000.00$665.00$0.00
65ERECT PRESTRESSED GIRDERS17.00EA 17.00 17.000.00$2,000.00$0.00
66FURNISH PRESTRESSED I GIRDERS, 80' LONG17.00EA 17.00 17.000.00$17,600.00$0.00
67PCC CURB, TYPE A1-621.00LF 21.00 21.000.00$80.00$0.00
68PCC CURB, TYPE A1-839.00LF 103.00 103.000.00$80.00$0.00
69PCC CURB, TYPE A1-VAR120.00LF 18.75 18.750.00$80.00$0.00
70PCC CURB & GUTTER, TYPE A2-81,066.00LF 926.50 926.500.00$36.00$0.00
71PCC WALK, 4" THICK6,253.00SF 5,166.00 5,166.000.00$6.50$0.00
72PCC CURB RAMP, 4" THICK22.00SF 538.00 538.000.00$18.00$0.00
73PCC DRIVEWAYS, 6" THICK886.00SF 886.00 886.000.00$9.00$0.00
74DETECTABLE WARNING SURFACE90.00SF 39.00 39.000.00$75.00$0.00
75DETECTABLE WARNING SURFACE (BRIDGE CURB RAMP)33.00SF 33.00 33.000.00$75.00$0.00
76CROSS GUTTER28.00CY 31.00 31.000.00$560.00$0.00
77CONSTRUCT BENCAMP STREET DETOUR RAMP (PLAN RD, SHEET 4)1.00LS 1.00 1.000.00$104,000.00$0.00
78BARRICADE POSTS, STD PLAN W-141.00EA 1.00 1.000.00$930.00$0.00
794' PICKET RAILING (MODIFIED)238.00LF 238.00 238.000.00$285.00$0.00
80AESTHETIC TREATMENT FOR PICKET RAILING238.00LF 238.00 238.000.00$222.00$0.00
8124" RUBBER GASKETED RCP, 1500 D11.00LF 11.00 11.000.00$420.00$0.00
8236" RUBBER GASKETED RCP, 1500 D16.00LF 16.00 16.000.00$365.00$0.00
8324" CONCRETE COLLAR1.00EA 1.00 1.000.00$2,000.00$0.00
8436" CONCRETE COLLAR1.00EA 1.00 1.000.00$2,000.00$0.00
8518" CMP, GAGE 143.00LF 0.00 0.000.00$480.00$0.00
8624" CMP, GAGE 145.00LF 0.00 0.000.00$290.00$0.00
8736" CMP, GAGE 1419.00LF 0.00 0.000.00$220.00$0.00
883" PVC SCH 80 DRAIN PIPE371.00LF 371.00 371.000.00$12.00$0.00
894" PVC SCH 80 DRAIN PIPE64.00LF 64.00 64.000.00$30.00$0.00
90RELOCATE FIRE HYDRANT1.00EA 0.00 0.000.00$5,700.00$0.00
91RELOCATE LIGHT POLE1.00EA 1.00 1.000.00$8,500.00$0.00
92TRAFFIC CONTROL (STAGE 1)1.00LS 1.00 1.000.00$11,000.00$0.00
93TRAFFIC CONTROL (STAGE 2, PHASE 1)1.00LS 1.00 1.000.00$2,100.00$0.00
94TRAFFIC CONTROL (STAGE 2, PHASE 2)1.00LS 1.00 1.000.00$2,400.00$0.00
95TRAFFIC CONTROL (STAGE 3, PHASE 2)1.00LS 1.00 1.000.00$3,300.00$0.00
96TRAFFIC CONTROL (STAGE 3, PHASE 1)1.00LS 1.00 1.000.00$3,300.00$0.00
97TEMPORARY RAILING (TYPE K)500.00LF 540.00 540.000.00$31.00$0.00
98TEMPORARY CRASH CUSHION5.00EA 3.00 3.000.00$290.00$0.00
99FLASHING ARROW SIGN2.00EA 2.00 2.000.00$5,300.00$0.00
100CHANGEABLE MESSAGE SIGN3.00EA 2.00 2.000.00$15,500.00$0.00
101HEIGHT RESTRICTION BARRIER1.00LS 1.00 1.000.00$10,000.00$0.00
102RELOCATE EXISTING SIGN (PLAN TC, SHEET 8)1.00LS 0.00 0.000.00$530.00$0.00
1033" CONDUIT (SCH 80 PVC)80.00LF 80.00 80.000.00$93.00$0.00
1043" CONDUIT (GRC)85.00LF 195.00 195.000.00$140.00$0.00
1054" CONDUIT (SCH 80 PVC)220.00LF 400.00 400.000.00$70.00$0.00
1062-CAMERA VIDEO DETECTION SYSTEM (COMPLETE)1.00EA 1.00 1.000.00$32,500.00$0.00
107REMOVE CONTROLLER1.00EA 1.00 1.000.00$230.00$0.00
108REMOVE TYPE 2 STANDARD (COMPLETE) (EXCL. FOUND.)1.00EA 1.00 1.000.00$600.00$0.00
109REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.)1.00EA 1.00 1.000.00$1,000.00$0.00
110REMOVE TYPE 17 STANDARD (COMPLETE) (EXCL. FOUND.)1.00EA 1.00 1.000.00$1,000.00$0.00
111REMOVE TYPE 26 STANDARD (COMPLETE) (EXCL. FOUND.)1.00EA 1.00 1.000.00$4,500.00$0.00
112REMOVE TYPE 17 FOUNDATION1.00EA 1.00 1.000.00$1,100.00$0.00
113REMOVE TYPE 26 FOUNDATION1.00EA 1.00 1.000.00$2,000.00$0.00
114REMOVE CONTROLLER FOUNDATION1.00EA 1.00 1.000.00$700.00$0.00
115RELOCATE RETRO REFLECTIVE STREET NAME SIGN 4.00EA 4.00 4.000.00$400.00$0.00
116INSTALL TYPE 170 ATC/HC-11 CONTROLLER AND TYPE 332 CABINET (COMPLETE)1.00EA 1.00 1.000.00$3,500.00$0.00
117GPS UTB UNIT AND ANTENNA1.00EA 1.00 1.000.00$2,900.00$0.00
118SWITCH PACK6.00EA 6.00 6.000.00$117.00$0.00
119PED ISOLATION MODULE2.00EA 2.00 2.000.00$140.00$0.00
1202-CHANNEL ILD SENSOR UNIT4.00EA 4.00 4.000.00$160.00$0.00
121TYPE 332 CABINET1.00EA 1.00 1.000.00$15,000.00$0.00
122TYPE 332 CABINET FOUNDATION1.00EA 1.00 1.000.00$1,750.00$0.00
123TYPE 15 STANDARD2.00EA 2.00 2.000.00$5,000.00$0.00
124TYPE 19 STANDARD1.00EA 1.00 1.000.00$11,000.00$0.00
125TYPE 26 STANDARD1.00EA 1.00 1.000.00$12,800.00$0.00
126TYPE 15 STANDARD FOUNDATION2.00EA 2.00 2.000.00$2,900.00$0.00
127TYPE 19 STANDARD FOUNDATION1.00EA 1.00 1.000.00$6,000.00$0.00
128TYPE 26 STANDARD FOUNDATION1.00EA 1.00 1.000.00$7,000.00$0.00
12925' SIGNAL MAST ARM1.00EA 1.00 1.000.00$3,000.00$0.00
13040' SIGNAL MAST ARM1.00EA 1.00 1.000.00$3,500.00$0.00
13115' LUMINAIRE MAST ARM4.00EA 4.00 4.000.00$1,100.00$0.00
132PEDESTRIAN PUSH BUTTON EXTENSION1.00EA 1.00 1.000.00$350.00$0.00
133SOUTHERN CALIF EDISON SERVICE FEE (ALLOWANCE)8,000.00AL 0.00 0.000.00$1.00$0.00
134TEMPORARY TRAFFIC SIGNAL SYSTEM AT BENCAMP STREET1.00LS 1.00 1.000.00$150,000.00$0.00
135REMOVE DETAIL 8 (PAINT)1,259.00LF 100.00 100.000.00$1.10$0.00
136REMOVE DETAIL 21 (PAINT)3,614.00LF 2,733.00 2,733.000.00$1.00$0.00
137REMOVE DETAIL 22 (PAINT)77.00LF 0.00 0.000.00$3.60$0.00
138REMOVE DETAIL 24 (PAINT)1,859.00LF 120.00 120.000.00$1.00$0.00
139REMOVE DETAIL 27B (PAINT)5,939.00LF 2,017.00 2,017.000.00$1.00$0.00
140REMOVE DETAIL 28 (PAINT)748.00LF 320.00 320.000.00$1.25$0.00
141REMOVE DETAIL 37B (PAINT)465.00LF 0.00 0.000.00$1.25$0.00
142REMOVE DETAIL 38 (PAINT)112.00LF 80.00 80.000.00$2.50$0.00
143REMOVE DETAIL 38A (PAINT)1,053.00LF 535.00 535.000.00$1.10$0.00
144REMOVE DETAIL 40 (PAINT)65.00LF 0.00 0.000.00$4.00$0.00
145REMOVE PAVEMENT MARKINGS (PAINT)303.00SF 555.00 555.000.00$2.00$0.00
146REMOVE 12" STRIPING (PAINT)160.00LF 397.00 397.000.00$2.50$0.00
147DETAIL 8 (ONE-COAT PAINT)155.00LF 0.00 0.000.00$1.50$0.00
148DETAIL 21 (ONE-COAT PAINT)2,470.00LF 2,419.00 2,419.000.00$0.55$0.00
149DETAIL 24 (ONE-COAT PAINT)1,859.00LF 2,117.00 2,117.000.00$0.35$0.00
150DETAIL 27B (ONE-COAT PAINT)5,418.00LF 3,335.00 3,335.000.00$0.25$0.00
151DETAIL 28 (ONE-COAT PAINT)851.00LF 293.00 293.000.00$1.10$0.00
152DETAIL 37B (ONE-COAT PAINT)155.00LF 0.00 0.000.00$1.60$0.00
153DETAIL 38A (ONE-COAT PAINT)712.00LF 326.00 326.000.00$0.75$0.00
154DETAIL 40 (ONE-COAT PAINT)60.00LF 0.00 0.000.00$3.55$0.00
155DETAIL 22 (TWO-COAT PAINT)77.00LF 80.00 80.000.00$5.00$0.00
156DETAIL 38 (TWO-COAT PAINT)77.00LF 80.00 80.000.00$5.00$0.00
157DETAIL 9 (THERMOPLASTIC)1,530.00LF 2,050.00 2,050.000.00$0.90$0.00
158DETAIL 22 (THERMOPLASTIC)500.00LF 535.00 535.000.00$1.50$0.00
159DETAIL 29 (THERMOPLASTIC)470.00LF 375.00 375.000.00$2.50$0.00
160DETAIL 32 (THERMOPLASTIC)155.00LF 160.00 160.000.00$3.50$0.00
161DETAIL 38 (THERMOPLASTIC)80.00LF 125.00 125.000.00$4.50$0.00
162PAVEMENT MARKINGS (ONE-COAT PAINT)178.00SF 326.00 326.000.00$4.00$0.00
163PAVEMENT MARKINGS (TWO-COAT PAINT)30.00SF 177.00 177.000.00$10.00$0.00
164PAVEMENT MARKINGS (THERMOPLASTIC)215.00SF 162.00 162.000.00$7.00$0.00
1654" STRIPING (ONE-COAT PAINT)116.00LF 0.00 0.000.00$2.00$0.00
1668" STRIPING (ONE-COAT PAINT)60.00LF 0.00 0.000.00$3.50$0.00
16712" STRIPING (ONE-COAT PAINT)355.00LF 388.00 388.000.00$3.00$0.00
16812" STRIPING (THERMOPLASTIC)455.00LF 400.00 400.000.00$4.00$0.00
169CURB MARKINGS (ONE-COAT PAINT)10.00LF 12.50 12.500.00$30.00$0.00
1701-1/2" STREET LIGHT CONDUIT40.00LF 85.00 85.000.00$58.00$0.00
1713" STREET LIGHT CONDUIT748.00LF 748.00 748.000.00$40.00$0.00
172WIRE #10 (STREET LIGHT)3,550.00LF 990.00 990.000.00$1.10$0.00
173NO. 5 PULL BOX INCL PCC COVER (STREET LIGHT)10.00EA 10.00 10.000.00$500.00$0.00
174FURNISH AND INSTALL UNDERGROUND ELECTRICAL SERVICE CONDUITS AND PULLBOX1.00LS 1.00 1.000.00$17,000.00$0.00
175SERVICE PEDESTAL WITH FOUNDATION1.00EA 1.00 1.000.00$1,100.00$0.00
176TYPE 15 STANDARD WITH 15' MAST ARM AND 150 W HPS LUMINAIRE (COMPLETE)1.00EA 1.00 1.000.00$7,000.00$0.00
177CONCRETE STREET LIGHT STANDARD WITH 100 W HPS LUMINAIRE (COMPLETE)1.00EA 1.00 1.000.00$19,000.00$0.00
178CONCRETE STREET LIGHT STANDARD WITH 150 W HPS AND 50 W HPS LUMINAIRES (COMPLETE)4.00EA 4.00 4.000.00$22,000.00$0.00
179CONCRETE PEDESTRIAN LIGHT STANDARD WITH 50 W HPS LUMINAIRE (COMPLETE)2.00EA 2.00 2.000.00$10,000.00$0.00
180CONCRETE STREET LIGHT FOUNDATION PER STD PLAN 4315.00EA 5.00 5.000.00$1,700.00$0.00
181CONCRETE STREET LIGHT FOUNDATION PER STD PLAN 4332.00EA 2.00 2.000.00$1,700.00$0.00
182REMOVE BENCAMP STREET DETOUR RAMP1.00LS 1.00 1.000.00$9,000.00$0.00
S-1CMU BLOCK WALL & CONCRETE REMOVAL AT COMMERCAIL CENTER T&M 5,338.68 5,338.680.00$1.00$0.00
S-2REPLACE 33"X54" SEWER MANHOLE COVER AT COMMERCAIL CENTER T&M 3,975.78 3,975.780.00$1.00$0.00
S-3ADDITIONAL CONSTRUCTION SIGNS ON DEL MAR AVE T&M 9,470.83 9,470.830.00$1.00$0.00
S-4RECONSTRUCT SEWER MANHOLE SOUTHWEST CORNER COMMERCAIL CENTER & DEL MAR AVE T&M 6,998.31 6,998.310.00$1.00$0.00
S-5REPLACE UNSUITABLE MATERIAL WITH CMB W/S DEL MAR AVE 9+80 TO 12+40 T&M 0.00 0.000.00$1.00$0.00
S-6RELOCATE FIRE HYDRANT ON ABBOT AVE BY SGCWD T&M 8,328.27 8,328.270.00$1.00$0.00
S-7STAGE 1 SIGNAL AT COMMERCIAL CENTER LS 1.00 1.000.00$20,780.00$0.00
S-8MODIFY CATCH BASIN DEL MAR AVE STA 10+30 LS 1.00 1.000.00$40,000.00$0.00
S-10EXTENSION OF CONTRACT TIME STAGE 1 DAYS 0.00 0.000.00$0.00$0.00
S-11NORWOOD PLACE CLOSURE AT DEL MAR AVE LS 1.00 1.000.00$10,000.00$0.00
S-13INTERCEPT 2" ELECTRICAL PVC CONDUIT T&M 739.56 739.560.00$1.00$0.00
S-143-12" LED VEHICLE HEAD EA 9.00 9.000.00$840.00$0.00
S-15LED COUNTDOWN PEDESTRIAN HEAD EA 4.00 4.000.00$787.50$0.00
S-16PEDESTRIAN PUSH BUTTON EA 4.00 4.000.00$388.50$0.00
S-17PEDESTRIAN PUSH BUTTON PLATE EA 4.00 4.000.00$42.00$0.00
S-18LED LUMINAIRES (200W HPS EQUIVALENT) EA 4.00 4.000.00$1,260.00$0.00
S-19HIGH EARLY STRENGTH CONCRETE T&M 1,443.55 1,443.550.00$1.00$0.00
S-20HANDICAP RAMPS AT PARK & RIDE T&M 12,073.69 12,073.690.00$1.00$0.00
S-21TIME EXTENSION STAGE 1 DAYS 0.00 0.000.00$0.00$0.00
S-22ANCHOR BOLTS (TYPE 15TS BM) LS 1.00 1.000.00$662.00$0.00
S-23REMOVAL OF EXISTING WINGWALL T&M 11,898.17 11,898.170.00$1.00$0.00
S-24REMOVE & REPLACE DAMAGED RESTRICTION BARRIER T&M 0.00 0.000.00$1.00$0.00
S-24AREPLACE EXISTING RESTRICTION BARRIER AT BENCAMP LS 1.00 1.000.00$13,500.00$0.00
S-25CONCRETE REMOVAL FOR SHORING STAGE 2 PHASE 1 T&M 10,214.00 10,214.000.00$1.00$0.00
S-26CONCRETE REMOVAL ON EXISTING ABUTMENT 2 WALL T&M 454.16 454.160.00$1.00$0.00
S-27REPLACE DAMAGED CRASH CUSHION T&M 3,734.35 3,734.350.00$1.00$0.00
S-28MODIFY AT&T UTILITY OPENINGS T&M 0.00 0.000.00$1.00$0.00
S-29MODIFY CATCH BASIN V=9.5 AT 7+65 T&M 28,838.76 28,838.760.00$1.00$0.00
S-30SEAL GAP BETWEEN ABUTMENT STAGE 1 & 2 T&M 6,876.96 6,876.960.00$1.00$0.00
S-31MODIFY AT&T UTILITY OPENING LS 1.00 1.000.00$5,000.00$0.00
S-32ADDITIONAL CONSTRUCTION PHASE BETWEEN PHASE 1 & PAHSE 2 ON STAGE 2 T&M 20,126.43 20,126.430.00$1.00$0.00
S-33MODIFY WINGWALL NO. 4 OVER 24" RCP T&M 1,867.47 1,867.470.00$1.00$0.00
S-35TIME EXTENSION STAGE 2 PHASE 1 DAYS 0.00 0.000.00$0.00$0.00
S-36MISSING TRAFFIC SIGNAL ITEMS LS 1.00 1.000.00$16,132.78$0.00
S-37CONDUIT MODIFICATION (COUPLING, GRC, J-BOXES LS 1.00 1.000.00$6,000.00$0.00
S-38REPLACEMENT OF UNEVEN PAVEMENT S/B DEL MAR AVE T&M 24,493.82 24,493.820.00$1.00$0.00
S-39OFFICE FACILITY MTH 9.00 9.000.00$2,500.00$0.00
S-40IMPLEMENTATION OF SURFACE WATER DIVERSION PLAN PHASE 2 MTH 5.00 5.000.00$1,342.42$0.00
S-41TRAFFIC CONTROL STAGE 2, 3, 4 T&M 6,087.68 6,087.680.00$1.00$0.00
S-42EARLY START ON STAGE 2 PHASE 2 WD 0.00 0.000.00$0.00$0.00
S-43CONCRETE REMOVAL STAGE 2 PHASE 2 T&M 66,875.08 66,875.080.00$1.00$0.00
S-44REMOVAL OF RIVER ROCK, BOULDERS & BURIED CONCRETE T&M 27,922.42 27,922.420.00$1.00$0.00
S-45COMBINE STAGE 2, PHASE 2 AND STAGE 3, PHASE 1 LS 0.00 0.000.00$0.00$0.00
S-46INSTALLATION OF #8 CONDUCTOR WIRE T&M 2,570.40 2,570.400.00$1.00$0.00
S-47REPLACE EXISTING 36" CMP WITH RCP AT SE CORNER OF ABUTMENT 2 T&M 25,747.89 25,747.890.00$1.00$0.00
S-48INSTALLATION OF REGULATORY SIGNS T&M 3,132.24 3,132.240.00$1.00$0.00
S-49TS ANCHOR BOLTS AT BARRIER ELECTROLIER T&M 1,570.32 1,570.320.00$1.00$0.00
S-50RELOCATE PULL BOX S/W CORNER DEL MAR AV & COMMERCIAL DR T&M 4,573.85 4,573.850.00$1.00$0.00
S-51REPLACE EXISTING 36" CMP WITH RCP NORTH SIDE T&M 39,459.82 39,459.820.00$1.00$0.00
S-52REPLACE 11" ANCHOR BOLTS T&M 1,883.28 1,883.280.00$1.00$0.00
S-53RECONSTRUCT CURB & GUTTER AT STA 7+05 LS 1.00 1.000.00$2,500.00$0.00
S-54CURB RAMP MODIFICATIONS T&M 29,911.20 29,911.200.00$1.00$0.00
S-55TIME EXTENSIONS SCE DELAY DAYS 0.00 0.000.00$0.00$0.00
S-56RECONSTRUCT PORTION OF BENCAMP STREET LS 1.00 1.000.00$27,016.00$0.00
S-57MODIFY RETAINING WALL AT BENCAMP LS 1.00 1.000.00$5,000.00$0.00
S-58FENCE AT COMMERCIAL CENTER LS 1.00 1.000.00$35,000.00$0.00
S-59CURB MARKINGS ONE COAT PAINT (QTY OVER 25%) LF 362.50 362.500.00$5.25$0.00
S-60CONSTRUCT MOD CB AND RECONSTRUCT, ROADWAY 10+00 - 11+50 LS 0.00 0.000.00$206,000.00$0.00
S-60ACONSTRUCT MOD CB AND RECONSTRUCT ROADWAY 10+00 - 11+50 LS 1.00 1.000.00$204,025.90$0.00
S-61CONTRACT TIME EXTENSION DAYS 0.00 0.000.00$0.00$0.00
S-62SCE DELAY  LS 1.00 1.000.00$37,642.00$0.00
S-63MITIGATE CAVE IN LS 0.00 0.000.00$44,000.00$0.00
S-63AMITIGATE CAVE IN LS 1.00 1.000.00$29,839.63$0.00
S-64RECONSTRUCT DRIVEWAY LS 17,349.64 17,349.640.00$1.00$0.00
S-65RELOCATE 4" SL CONDUIT LS 0.375 0.3750.00$5,000.00$0.00
S-66FIELD OVERHEAD EXPENSES LS 0.00 0.000.00$42,000.00$0.00
S-66AFIELD OVERHEAD EXPENSES LS 1.00 1.000.00$40,000.00$0.00
S-67STAGE 4 NW DAYS DAYS 0.00 0.000.00$0.00$0.00

DEDUCTION DETAIL

DescriptionUnitTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
OVERTIME INSPECTIONHOUR 0.00 0.000.00$100.00 $0.00
LIQUIDATED DAMAGESDAY 0.00 0.000.00$1,500.00 $0.00
LABOR COMPLIANCEVIOLATION 0.00 0.000.00$25.00 $0.00
AFFIRMATIVE ACTIONVIOLATION 0.00 0.000.00$200.00 $0.00
BEST MANAGEMENT PRACTICEVIOLATION 0.00 0.000.00$1,000.00 $0.00
SCHEDULE UPDATEMONTHLY 0.00 0.000.00$250.00 $0.00

FINANCIAL SUMMARY

  Total Previous Current
Earned $5,910,791.97 $5,910,791.97 $0.00
Retained $148,707.29 $148,707.29 $0.00
Deducted $0.00 $0.00 $0.00
Due $5,762,084.68 $5,762,084.68 $0.00



*The term "As-Built" used by the Department of Public Works in combination with the Engineer's Monthly Estimate process indicates that the project has been field accepted and that the pay quantities and deductions as detailed above are FINAL. Unless a certified letter is received by this office within 14 calendar days disputing the amounts shown, an acceptance letter will be filed with the Board of Supervisors authorizing the release of retention.

Contact Office Engineer
Contractor Copy  
P Please consider the environment before printing this report.