| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $5,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500.00/MTH) | 9.00 | MTH |
21.00
| 21.00 | 0.00 | $500.00 | $0.00 |
| 3 | CONSTRUCTION SCHEDULE (AS BUILT) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
| 4 | PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $5,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 5 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
1.00
| 1.00 | 0.00 | $112,000.00 | $0.00 |
| 6 | SHORING OF OPEN EXCAVATIONS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 7 | PREPARATION OF THE SURFACE WATER DIVERSION PLAN (STIPULATED UNIT PRICE OF $5,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 8 | IMPLEMENTATION OF THE SURFACE WATER DIVERSION PLAN | 6.00 | MTH |
7.00
| 7.00 | 0.00 | $320.00 | $0.00 |
| 9 | SURFACE WATER DIVERSION STRUCTURE (STAGE ONE) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $100,000.00 | $0.00 |
| 10 | SURFACE WATER DIVERSION STRUCTURE (STAGE TWO) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $65,000.00 | $0.00 |
| 11 | REMOVE SURFACE WATER DIVERSION STRUCTURE (STAGE ONE) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $30,000.00 | $0.00 |
| 12 | REMOVE SURFACE WATER DIVERSION STRUCTURE (STAGE TWO) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $35,000.00 | $0.00 |
| 13 | PREPARATION OF THE LEAD-CONTAMINATED SMP (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 14 | EXCAVATION, TRANSPORTATION, AND DISPOSAL OF LEAD CONTAMINATED SOIL | 78.00 | TON |
95.00
| 95.00 | 0.00 | $130.00 | $0.00 |
| 15 | PREPARATION OF THE LBP/LCP REMOVAL PLAN (STIPULATED UNIT PRICE OF $5,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 16 | REMOVAL AND DISPOSAL OF LBP/LCP | 1.00 | LS |
1.00
| 1.00 | 0.00 | $54,000.00 | $0.00 |
| 17 | PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $5,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 18 | IMPLEMENTATION OF THE SSHSP | 9.00 | MTH |
21.00
| 21.00 | 0.00 | $35.00 | $0.00 |
| 19 | OFFICE FACILITIES | 9.00 | MTH |
11.00
| 11.00 | 0.00 | $5,000.00 | $0.00 |
| 20 | MOBILIZATION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $500,000.00 | $0.00 |
| 21 | CLEARING AND GRUBBING | 1.00 | LS |
1.00
| 1.00 | 0.00 | $8,000.00 | $0.00 |
| 22 | RELOCATE EXISTING BUS SHELTER | 1.00 | EA |
1.00
| 1.00 | 0.00 | $6,000.00 | $0.00 |
| 23 | CONCRETE REMOVAL (NON-REINFORCED) | 760.00 | CY |
771.00
| 771.00 | 0.00 | $60.00 | $0.00 |
| 24 | CONCRETE REMOVAL (REINFORCED) | 12.00 | CY |
10.15
| 10.15 | 0.00 | $214.00 | $0.00 |
| 25 | REINFORCED CONCRETE REMOVAL AT EXISTING PARKING STRUCTURE | 2.00 | CY |
2.00
| 2.00 | 0.00 | $1,800.00 | $0.00 |
| 26 | CMU WALL AND FOUNDATION REMOVAL AT EXISTING PARKING STRUCTURE | 15.00 | LF |
15.00
| 15.00 | 0.00 | $260.00 | $0.00 |
| 27 | METAL RAIL REMOVAL AT EXISTING PARKING STRUCTURE | 25.00 | LF |
25.00
| 25.00 | 0.00 | $18.00 | $0.00 |
| 28 | BRIDGE REMOVAL (STAGE ONE) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $150,000.00 | $0.00 |
| 29 | BRIDGE REMOVAL (STAGE TWO) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $100,000.00 | $0.00 |
| 30 | TEMPORARY VERTICAL SHORING (STAGE ONE) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $225,000.00 | $0.00 |
| 31 | TEMPORARY VERTICAL SHORING (STAGE TWO) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $200,000.00 | $0.00 |
| 32 | TEMPORARY BALLAST (STAGE ONE) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $30,000.00 | $0.00 |
| 33 | TEMPORARY BALLAST (STAGE TWO) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
| 34 | TEMPORARY UTILITY SUPPORT (AT&T CONDUITS) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $60,000.00 | $0.00 |
| 35 | UNCLASSIFIED EXCAVATION | 1,299.00 | CY |
1,623.75
| 1,623.75 | 0.00 | $35.00 | $0.00 |
| 36 | STRUCTURE EXCAVATION (BRIDGE) | 2,170.00 | CY |
2,170.00
| 2,170.00 | 0.00 | $37.00 | $0.00 |
| 37 | STRUCTURE BACKFILL (BRIDGE) | 2,000.00 | CY |
2,000.00
| 2,000.00 | 0.00 | $50.00 | $0.00 |
| 38 | FILTER MATERIAL (CEMENT TREATED PERMEABLE BASE) | 8.00 | CY |
8.00
| 8.00 | 0.00 | $330.00 | $0.00 |
| 39 | FILTER FABRIC | 76.00 | SY |
76.00
| 76.00 | 0.00 | $23.00 | $0.00 |
| 40 | GEOCOMPOSITE WALL DRAIN | 4,860.00 | SF |
4,860.00
| 4,860.00 | 0.00 | $6.00 | $0.00 |
| 41 | CRUSHED MISCELLANEOUS BASE | 898.00 | CY |
1,014.00
| 1,014.00 | 0.00 | $40.00 | $0.00 |
| 42 | AC PAVEMENT | 1,343.00 | TON |
1,481.17
| 1,481.17 | 0.00 | $106.00 | $0.00 |
| 43 | AC PAVEMENT(DRIVEWAYS) | 6.00 | TON |
16.00
| 16.00 | 0.00 | $450.00 | $0.00 |
| 44 | RECONSTRUCT MANHOLE | 3.00 | EA |
1.00
| 1.00 | 0.00 | $2,400.00 | $0.00 |
| 45 | ADJUST MANHOLE | 3.00 | EA |
3.00
| 3.00 | 0.00 | $960.00 | $0.00 |
| 46 | PCC PAVEMENT | 111.00 | CY |
102.00
| 102.00 | 0.00 | $230.00 | $0.00 |
| 47 | STRUCTURE CONCRETE (BRIDGE) | 734.00 | CY |
734.00
| 734.00 | 0.00 | $895.00 | $0.00 |
| 48 | STRUCTURE CONCRETE (FOOTING) | 437.00 | CY |
437.00
| 437.00 | 0.00 | $300.00 | $0.00 |
| 49 | MINOR CONCRETE (DRAINAGE PAD) | 2.00 | CY |
2.00
| 2.00 | 0.00 | $1,900.00 | $0.00 |
| 50 | MINOR CONCRETE (BRIDGE CURB RAMP) | 2.00 | CY |
2.00
| 2.00 | 0.00 | $3,000.00 | $0.00 |
| 51 | MINOR CONCRETE (BRIDGE SIDEWALK) | 2.00 | CY |
2.00
| 2.00 | 0.00 | $3,000.00 | $0.00 |
| 52 | CONCRETE BARRIER (TYPE 26 MODIFIED W/ SIDEWALK) | 150.00 | LF |
150.00
| 150.00 | 0.00 | $350.00 | $0.00 |
| 53 | CONCRETE BARRIER (TYPE 26 MODIFIED W/O SIDEWALK) | 30.00 | LF |
30.00
| 30.00 | 0.00 | $275.00 | $0.00 |
| 54 | CONCRETE BARRIER (TYPE 26 MODIFIED W/ CURB RAMP) | 27.00 | LF |
27.00
| 27.00 | 0.00 | $285.00 | $0.00 |
| 55 | CONCRETE BARRIER (TYPE 26 MODIFIED W/ SIDEWALK & STEEL COVER PLATE) | 31.00 | LF |
31.00
| 31.00 | 0.00 | $580.00 | $0.00 |
| 56 | AESTHETIC TREATMENT FOR CONCRETE BARRIER | 238.00 | LF |
238.00
| 238.00 | 0.00 | $200.00 | $0.00 |
| 57 | BAR REINFORCING STEEL (BRIDGE) | 196,000.00 | LB |
196,000.00
| 196,000.00 | 0.00 | $1.18 | $0.00 |
| 58 | JOINT SEAL, TYPE A | 285.00 | LF |
285.00
| 285.00 | 0.00 | $83.00 | $0.00 |
| 59 | JOINT SEAL | 364.00 | LF |
364.00
| 364.00 | 0.00 | $28.00 | $0.00 |
| 60 | CATCH BASIN PER STD PLAN 300, W=18 | 1.00 | EA |
0.00
| 0.00 | 0.00 | $22,000.00 | $0.00 |
| 61 | CATCH BASIN PER STD PLAN 300, W=4 | 1.00 | EA |
0.00
| 0.00 | 0.00 | $5,100.00 | $0.00 |
| 62 | CATCH BASIN PER STD PLAN 300, W=7 | 2.00 | EA |
1.00
| 1.00 | 0.00 | $6,600.00 | $0.00 |
| 63 | REINFORCED CONCRETE BLOCK WALL PER STD PLAN 601, TYPE 1 (H=6') | 52.00 | LF |
41.00
| 41.00 | 0.00 | $500.00 | $0.00 |
| 64 | SHOTCRETE REINFORCED WITH WELDED WIRE FABRIC | 15.00 | SF |
15.00
| 15.00 | 0.00 | $665.00 | $0.00 |
| 65 | ERECT PRESTRESSED GIRDERS | 17.00 | EA |
17.00
| 17.00 | 0.00 | $2,000.00 | $0.00 |
| 66 | FURNISH PRESTRESSED I GIRDERS, 80' LONG | 17.00 | EA |
17.00
| 17.00 | 0.00 | $17,600.00 | $0.00 |
| 67 | PCC CURB, TYPE A1-6 | 21.00 | LF |
21.00
| 21.00 | 0.00 | $80.00 | $0.00 |
| 68 | PCC CURB, TYPE A1-8 | 39.00 | LF |
103.00
| 103.00 | 0.00 | $80.00 | $0.00 |
| 69 | PCC CURB, TYPE A1-VAR | 120.00 | LF |
18.75
| 18.75 | 0.00 | $80.00 | $0.00 |
| 70 | PCC CURB & GUTTER, TYPE A2-8 | 1,066.00 | LF |
926.50
| 926.50 | 0.00 | $36.00 | $0.00 |
| 71 | PCC WALK, 4" THICK | 6,253.00 | SF |
5,166.00
| 5,166.00 | 0.00 | $6.50 | $0.00 |
| 72 | PCC CURB RAMP, 4" THICK | 22.00 | SF |
538.00
| 538.00 | 0.00 | $18.00 | $0.00 |
| 73 | PCC DRIVEWAYS, 6" THICK | 886.00 | SF |
886.00
| 886.00 | 0.00 | $9.00 | $0.00 |
| 74 | DETECTABLE WARNING SURFACE | 90.00 | SF |
39.00
| 39.00 | 0.00 | $75.00 | $0.00 |
| 75 | DETECTABLE WARNING SURFACE (BRIDGE CURB RAMP) | 33.00 | SF |
33.00
| 33.00 | 0.00 | $75.00 | $0.00 |
| 76 | CROSS GUTTER | 28.00 | CY |
31.00
| 31.00 | 0.00 | $560.00 | $0.00 |
| 77 | CONSTRUCT BENCAMP STREET DETOUR RAMP (PLAN RD, SHEET 4) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $104,000.00 | $0.00 |
| 78 | BARRICADE POSTS, STD PLAN W-14 | 1.00 | EA |
1.00
| 1.00 | 0.00 | $930.00 | $0.00 |
| 79 | 4' PICKET RAILING (MODIFIED) | 238.00 | LF |
238.00
| 238.00 | 0.00 | $285.00 | $0.00 |
| 80 | AESTHETIC TREATMENT FOR PICKET RAILING | 238.00 | LF |
238.00
| 238.00 | 0.00 | $222.00 | $0.00 |
| 81 | 24" RUBBER GASKETED RCP, 1500 D | 11.00 | LF |
11.00
| 11.00 | 0.00 | $420.00 | $0.00 |
| 82 | 36" RUBBER GASKETED RCP, 1500 D | 16.00 | LF |
16.00
| 16.00 | 0.00 | $365.00 | $0.00 |
| 83 | 24" CONCRETE COLLAR | 1.00 | EA |
1.00
| 1.00 | 0.00 | $2,000.00 | $0.00 |
| 84 | 36" CONCRETE COLLAR | 1.00 | EA |
1.00
| 1.00 | 0.00 | $2,000.00 | $0.00 |
| 85 | 18" CMP, GAGE 14 | 3.00 | LF |
0.00
| 0.00 | 0.00 | $480.00 | $0.00 |
| 86 | 24" CMP, GAGE 14 | 5.00 | LF |
0.00
| 0.00 | 0.00 | $290.00 | $0.00 |
| 87 | 36" CMP, GAGE 14 | 19.00 | LF |
0.00
| 0.00 | 0.00 | $220.00 | $0.00 |
| 88 | 3" PVC SCH 80 DRAIN PIPE | 371.00 | LF |
371.00
| 371.00 | 0.00 | $12.00 | $0.00 |
| 89 | 4" PVC SCH 80 DRAIN PIPE | 64.00 | LF |
64.00
| 64.00 | 0.00 | $30.00 | $0.00 |
| 90 | RELOCATE FIRE HYDRANT | 1.00 | EA |
0.00
| 0.00 | 0.00 | $5,700.00 | $0.00 |
| 91 | RELOCATE LIGHT POLE | 1.00 | EA |
1.00
| 1.00 | 0.00 | $8,500.00 | $0.00 |
| 92 | TRAFFIC CONTROL (STAGE 1) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $11,000.00 | $0.00 |
| 93 | TRAFFIC CONTROL (STAGE 2, PHASE 1) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,100.00 | $0.00 |
| 94 | TRAFFIC CONTROL (STAGE 2, PHASE 2) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,400.00 | $0.00 |
| 95 | TRAFFIC CONTROL (STAGE 3, PHASE 2) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $3,300.00 | $0.00 |
| 96 | TRAFFIC CONTROL (STAGE 3, PHASE 1) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $3,300.00 | $0.00 |
| 97 | TEMPORARY RAILING (TYPE K) | 500.00 | LF |
540.00
| 540.00 | 0.00 | $31.00 | $0.00 |
| 98 | TEMPORARY CRASH CUSHION | 5.00 | EA |
3.00
| 3.00 | 0.00 | $290.00 | $0.00 |
| 99 | FLASHING ARROW SIGN | 2.00 | EA |
2.00
| 2.00 | 0.00 | $5,300.00 | $0.00 |
| 100 | CHANGEABLE MESSAGE SIGN | 3.00 | EA |
2.00
| 2.00 | 0.00 | $15,500.00 | $0.00 |
| 101 | HEIGHT RESTRICTION BARRIER | 1.00 | LS |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
| 102 | RELOCATE EXISTING SIGN (PLAN TC, SHEET 8) | 1.00 | LS |
0.00
| 0.00 | 0.00 | $530.00 | $0.00 |
| 103 | 3" CONDUIT (SCH 80 PVC) | 80.00 | LF |
80.00
| 80.00 | 0.00 | $93.00 | $0.00 |
| 104 | 3" CONDUIT (GRC) | 85.00 | LF |
195.00
| 195.00 | 0.00 | $140.00 | $0.00 |
| 105 | 4" CONDUIT (SCH 80 PVC) | 220.00 | LF |
400.00
| 400.00 | 0.00 | $70.00 | $0.00 |
| 106 | 2-CAMERA VIDEO DETECTION SYSTEM (COMPLETE) | 1.00 | EA |
1.00
| 1.00 | 0.00 | $32,500.00 | $0.00 |
| 107 | REMOVE CONTROLLER | 1.00 | EA |
1.00
| 1.00 | 0.00 | $230.00 | $0.00 |
| 108 | REMOVE TYPE 2 STANDARD (COMPLETE) (EXCL. FOUND.) | 1.00 | EA |
1.00
| 1.00 | 0.00 | $600.00 | $0.00 |
| 109 | REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.) | 1.00 | EA |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
| 110 | REMOVE TYPE 17 STANDARD (COMPLETE) (EXCL. FOUND.) | 1.00 | EA |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
| 111 | REMOVE TYPE 26 STANDARD (COMPLETE) (EXCL. FOUND.) | 1.00 | EA |
1.00
| 1.00 | 0.00 | $4,500.00 | $0.00 |
| 112 | REMOVE TYPE 17 FOUNDATION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $1,100.00 | $0.00 |
| 113 | REMOVE TYPE 26 FOUNDATION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $2,000.00 | $0.00 |
| 114 | REMOVE CONTROLLER FOUNDATION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $700.00 | $0.00 |
| 115 | RELOCATE RETRO REFLECTIVE STREET NAME SIGN | 4.00 | EA |
4.00
| 4.00 | 0.00 | $400.00 | $0.00 |
| 116 | INSTALL TYPE 170 ATC/HC-11 CONTROLLER AND TYPE 332 CABINET (COMPLETE) | 1.00 | EA |
1.00
| 1.00 | 0.00 | $3,500.00 | $0.00 |
| 117 | GPS UTB UNIT AND ANTENNA | 1.00 | EA |
1.00
| 1.00 | 0.00 | $2,900.00 | $0.00 |
| 118 | SWITCH PACK | 6.00 | EA |
6.00
| 6.00 | 0.00 | $117.00 | $0.00 |
| 119 | PED ISOLATION MODULE | 2.00 | EA |
2.00
| 2.00 | 0.00 | $140.00 | $0.00 |
| 120 | 2-CHANNEL ILD SENSOR UNIT | 4.00 | EA |
4.00
| 4.00 | 0.00 | $160.00 | $0.00 |
| 121 | TYPE 332 CABINET | 1.00 | EA |
1.00
| 1.00 | 0.00 | $15,000.00 | $0.00 |
| 122 | TYPE 332 CABINET FOUNDATION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $1,750.00 | $0.00 |
| 123 | TYPE 15 STANDARD | 2.00 | EA |
2.00
| 2.00 | 0.00 | $5,000.00 | $0.00 |
| 124 | TYPE 19 STANDARD | 1.00 | EA |
1.00
| 1.00 | 0.00 | $11,000.00 | $0.00 |
| 125 | TYPE 26 STANDARD | 1.00 | EA |
1.00
| 1.00 | 0.00 | $12,800.00 | $0.00 |
| 126 | TYPE 15 STANDARD FOUNDATION | 2.00 | EA |
2.00
| 2.00 | 0.00 | $2,900.00 | $0.00 |
| 127 | TYPE 19 STANDARD FOUNDATION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $6,000.00 | $0.00 |
| 128 | TYPE 26 STANDARD FOUNDATION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $7,000.00 | $0.00 |
| 129 | 25' SIGNAL MAST ARM | 1.00 | EA |
1.00
| 1.00 | 0.00 | $3,000.00 | $0.00 |
| 130 | 40' SIGNAL MAST ARM | 1.00 | EA |
1.00
| 1.00 | 0.00 | $3,500.00 | $0.00 |
| 131 | 15' LUMINAIRE MAST ARM | 4.00 | EA |
4.00
| 4.00 | 0.00 | $1,100.00 | $0.00 |
| 132 | PEDESTRIAN PUSH BUTTON EXTENSION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $350.00 | $0.00 |
| 133 | SOUTHERN CALIF EDISON SERVICE FEE (ALLOWANCE) | 8,000.00 | AL |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
| 134 | TEMPORARY TRAFFIC SIGNAL SYSTEM AT BENCAMP STREET | 1.00 | LS |
1.00
| 1.00 | 0.00 | $150,000.00 | $0.00 |
| 135 | REMOVE DETAIL 8 (PAINT) | 1,259.00 | LF |
100.00
| 100.00 | 0.00 | $1.10 | $0.00 |
| 136 | REMOVE DETAIL 21 (PAINT) | 3,614.00 | LF |
2,733.00
| 2,733.00 | 0.00 | $1.00 | $0.00 |
| 137 | REMOVE DETAIL 22 (PAINT) | 77.00 | LF |
0.00
| 0.00 | 0.00 | $3.60 | $0.00 |
| 138 | REMOVE DETAIL 24 (PAINT) | 1,859.00 | LF |
120.00
| 120.00 | 0.00 | $1.00 | $0.00 |
| 139 | REMOVE DETAIL 27B (PAINT) | 5,939.00 | LF |
2,017.00
| 2,017.00 | 0.00 | $1.00 | $0.00 |
| 140 | REMOVE DETAIL 28 (PAINT) | 748.00 | LF |
320.00
| 320.00 | 0.00 | $1.25 | $0.00 |
| 141 | REMOVE DETAIL 37B (PAINT) | 465.00 | LF |
0.00
| 0.00 | 0.00 | $1.25 | $0.00 |
| 142 | REMOVE DETAIL 38 (PAINT) | 112.00 | LF |
80.00
| 80.00 | 0.00 | $2.50 | $0.00 |
| 143 | REMOVE DETAIL 38A (PAINT) | 1,053.00 | LF |
535.00
| 535.00 | 0.00 | $1.10 | $0.00 |
| 144 | REMOVE DETAIL 40 (PAINT) | 65.00 | LF |
0.00
| 0.00 | 0.00 | $4.00 | $0.00 |
| 145 | REMOVE PAVEMENT MARKINGS (PAINT) | 303.00 | SF |
555.00
| 555.00 | 0.00 | $2.00 | $0.00 |
| 146 | REMOVE 12" STRIPING (PAINT) | 160.00 | LF |
397.00
| 397.00 | 0.00 | $2.50 | $0.00 |
| 147 | DETAIL 8 (ONE-COAT PAINT) | 155.00 | LF |
0.00
| 0.00 | 0.00 | $1.50 | $0.00 |
| 148 | DETAIL 21 (ONE-COAT PAINT) | 2,470.00 | LF |
2,419.00
| 2,419.00 | 0.00 | $0.55 | $0.00 |
| 149 | DETAIL 24 (ONE-COAT PAINT) | 1,859.00 | LF |
2,117.00
| 2,117.00 | 0.00 | $0.35 | $0.00 |
| 150 | DETAIL 27B (ONE-COAT PAINT) | 5,418.00 | LF |
3,335.00
| 3,335.00 | 0.00 | $0.25 | $0.00 |
| 151 | DETAIL 28 (ONE-COAT PAINT) | 851.00 | LF |
293.00
| 293.00 | 0.00 | $1.10 | $0.00 |
| 152 | DETAIL 37B (ONE-COAT PAINT) | 155.00 | LF |
0.00
| 0.00 | 0.00 | $1.60 | $0.00 |
| 153 | DETAIL 38A (ONE-COAT PAINT) | 712.00 | LF |
326.00
| 326.00 | 0.00 | $0.75 | $0.00 |
| 154 | DETAIL 40 (ONE-COAT PAINT) | 60.00 | LF |
0.00
| 0.00 | 0.00 | $3.55 | $0.00 |
| 155 | DETAIL 22 (TWO-COAT PAINT) | 77.00 | LF |
80.00
| 80.00 | 0.00 | $5.00 | $0.00 |
| 156 | DETAIL 38 (TWO-COAT PAINT) | 77.00 | LF |
80.00
| 80.00 | 0.00 | $5.00 | $0.00 |
| 157 | DETAIL 9 (THERMOPLASTIC) | 1,530.00 | LF |
2,050.00
| 2,050.00 | 0.00 | $0.90 | $0.00 |
| 158 | DETAIL 22 (THERMOPLASTIC) | 500.00 | LF |
535.00
| 535.00 | 0.00 | $1.50 | $0.00 |
| 159 | DETAIL 29 (THERMOPLASTIC) | 470.00 | LF |
375.00
| 375.00 | 0.00 | $2.50 | $0.00 |
| 160 | DETAIL 32 (THERMOPLASTIC) | 155.00 | LF |
160.00
| 160.00 | 0.00 | $3.50 | $0.00 |
| 161 | DETAIL 38 (THERMOPLASTIC) | 80.00 | LF |
125.00
| 125.00 | 0.00 | $4.50 | $0.00 |
| 162 | PAVEMENT MARKINGS (ONE-COAT PAINT) | 178.00 | SF |
326.00
| 326.00 | 0.00 | $4.00 | $0.00 |
| 163 | PAVEMENT MARKINGS (TWO-COAT PAINT) | 30.00 | SF |
177.00
| 177.00 | 0.00 | $10.00 | $0.00 |
| 164 | PAVEMENT MARKINGS (THERMOPLASTIC) | 215.00 | SF |
162.00
| 162.00 | 0.00 | $7.00 | $0.00 |
| 165 | 4" STRIPING (ONE-COAT PAINT) | 116.00 | LF |
0.00
| 0.00 | 0.00 | $2.00 | $0.00 |
| 166 | 8" STRIPING (ONE-COAT PAINT) | 60.00 | LF |
0.00
| 0.00 | 0.00 | $3.50 | $0.00 |
| 167 | 12" STRIPING (ONE-COAT PAINT) | 355.00 | LF |
388.00
| 388.00 | 0.00 | $3.00 | $0.00 |
| 168 | 12" STRIPING (THERMOPLASTIC) | 455.00 | LF |
400.00
| 400.00 | 0.00 | $4.00 | $0.00 |
| 169 | CURB MARKINGS (ONE-COAT PAINT) | 10.00 | LF |
12.50
| 12.50 | 0.00 | $30.00 | $0.00 |
| 170 | 1-1/2" STREET LIGHT CONDUIT | 40.00 | LF |
85.00
| 85.00 | 0.00 | $58.00 | $0.00 |
| 171 | 3" STREET LIGHT CONDUIT | 748.00 | LF |
748.00
| 748.00 | 0.00 | $40.00 | $0.00 |
| 172 | WIRE #10 (STREET LIGHT) | 3,550.00 | LF |
990.00
| 990.00 | 0.00 | $1.10 | $0.00 |
| 173 | NO. 5 PULL BOX INCL PCC COVER (STREET LIGHT) | 10.00 | EA |
10.00
| 10.00 | 0.00 | $500.00 | $0.00 |
| 174 | FURNISH AND INSTALL UNDERGROUND ELECTRICAL SERVICE CONDUITS AND PULLBOX | 1.00 | LS |
1.00
| 1.00 | 0.00 | $17,000.00 | $0.00 |
| 175 | SERVICE PEDESTAL WITH FOUNDATION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $1,100.00 | $0.00 |
| 176 | TYPE 15 STANDARD WITH 15' MAST ARM AND 150 W HPS LUMINAIRE (COMPLETE) | 1.00 | EA |
1.00
| 1.00 | 0.00 | $7,000.00 | $0.00 |
| 177 | CONCRETE STREET LIGHT STANDARD WITH 100 W HPS LUMINAIRE (COMPLETE) | 1.00 | EA |
1.00
| 1.00 | 0.00 | $19,000.00 | $0.00 |
| 178 | CONCRETE STREET LIGHT STANDARD WITH 150 W HPS AND 50 W HPS LUMINAIRES (COMPLETE) | 4.00 | EA |
4.00
| 4.00 | 0.00 | $22,000.00 | $0.00 |
| 179 | CONCRETE PEDESTRIAN LIGHT STANDARD WITH 50 W HPS LUMINAIRE (COMPLETE) | 2.00 | EA |
2.00
| 2.00 | 0.00 | $10,000.00 | $0.00 |
| 180 | CONCRETE STREET LIGHT FOUNDATION PER STD PLAN 431 | 5.00 | EA |
5.00
| 5.00 | 0.00 | $1,700.00 | $0.00 |
| 181 | CONCRETE STREET LIGHT FOUNDATION PER STD PLAN 433 | 2.00 | EA |
2.00
| 2.00 | 0.00 | $1,700.00 | $0.00 |
| 182 | REMOVE BENCAMP STREET DETOUR RAMP | 1.00 | LS |
1.00
| 1.00 | 0.00 | $9,000.00 | $0.00 |
| S-1 | CMU BLOCK WALL & CONCRETE REMOVAL AT COMMERCAIL CENTER | | T&M |
5,338.68
| 5,338.68 | 0.00 | $1.00 | $0.00 |
| S-2 | REPLACE 33"X54" SEWER MANHOLE COVER AT COMMERCAIL CENTER | | T&M |
3,975.78
| 3,975.78 | 0.00 | $1.00 | $0.00 |
| S-3 | ADDITIONAL CONSTRUCTION SIGNS ON DEL MAR AVE | | T&M |
9,470.83
| 9,470.83 | 0.00 | $1.00 | $0.00 |
| S-4 | RECONSTRUCT SEWER MANHOLE SOUTHWEST CORNER COMMERCAIL CENTER & DEL MAR AVE | | T&M |
6,998.31
| 6,998.31 | 0.00 | $1.00 | $0.00 |
| S-5 | REPLACE UNSUITABLE MATERIAL WITH CMB W/S DEL MAR AVE 9+80 TO 12+40 | | T&M |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
| S-6 | RELOCATE FIRE HYDRANT ON ABBOT AVE BY SGCWD | | T&M |
8,328.27
| 8,328.27 | 0.00 | $1.00 | $0.00 |
| S-7 | STAGE 1 SIGNAL AT COMMERCIAL CENTER | | LS |
1.00
| 1.00 | 0.00 | $20,780.00 | $0.00 |
| S-8 | MODIFY CATCH BASIN DEL MAR AVE STA 10+30 | | LS |
1.00
| 1.00 | 0.00 | $40,000.00 | $0.00 |
| S-10 | EXTENSION OF CONTRACT TIME STAGE 1 | | DAYS |
0.00
| 0.00 | 0.00 | $0.00 | $0.00 |
| S-11 | NORWOOD PLACE CLOSURE AT DEL MAR AVE | | LS |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
| S-13 | INTERCEPT 2" ELECTRICAL PVC CONDUIT | | T&M |
739.56
| 739.56 | 0.00 | $1.00 | $0.00 |
| S-14 | 3-12" LED VEHICLE HEAD | | EA |
9.00
| 9.00 | 0.00 | $840.00 | $0.00 |
| S-15 | LED COUNTDOWN PEDESTRIAN HEAD | | EA |
4.00
| 4.00 | 0.00 | $787.50 | $0.00 |
| S-16 | PEDESTRIAN PUSH BUTTON | | EA |
4.00
| 4.00 | 0.00 | $388.50 | $0.00 |
| S-17 | PEDESTRIAN PUSH BUTTON PLATE | | EA |
4.00
| 4.00 | 0.00 | $42.00 | $0.00 |
| S-18 | LED LUMINAIRES (200W HPS EQUIVALENT) | | EA |
4.00
| 4.00 | 0.00 | $1,260.00 | $0.00 |
| S-19 | HIGH EARLY STRENGTH CONCRETE | | T&M |
1,443.55
| 1,443.55 | 0.00 | $1.00 | $0.00 |
| S-20 | HANDICAP RAMPS AT PARK & RIDE | | T&M |
12,073.69
| 12,073.69 | 0.00 | $1.00 | $0.00 |
| S-21 | TIME EXTENSION STAGE 1 | | DAYS |
0.00
| 0.00 | 0.00 | $0.00 | $0.00 |
| S-22 | ANCHOR BOLTS (TYPE 15TS BM) | | LS |
1.00
| 1.00 | 0.00 | $662.00 | $0.00 |
| S-23 | REMOVAL OF EXISTING WINGWALL | | T&M |
11,898.17
| 11,898.17 | 0.00 | $1.00 | $0.00 |
| S-24 | REMOVE & REPLACE DAMAGED RESTRICTION BARRIER | | T&M |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
| S-24A | REPLACE EXISTING RESTRICTION BARRIER AT BENCAMP | | LS |
1.00
| 1.00 | 0.00 | $13,500.00 | $0.00 |
| S-25 | CONCRETE REMOVAL FOR SHORING STAGE 2 PHASE 1 | | T&M |
10,214.00
| 10,214.00 | 0.00 | $1.00 | $0.00 |
| S-26 | CONCRETE REMOVAL ON EXISTING ABUTMENT 2 WALL | | T&M |
454.16
| 454.16 | 0.00 | $1.00 | $0.00 |
| S-27 | REPLACE DAMAGED CRASH CUSHION | | T&M |
3,734.35
| 3,734.35 | 0.00 | $1.00 | $0.00 |
| S-28 | MODIFY AT&T UTILITY OPENINGS | | T&M |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
| S-29 | MODIFY CATCH BASIN V=9.5 AT 7+65 | | T&M |
28,838.76
| 28,838.76 | 0.00 | $1.00 | $0.00 |
| S-30 | SEAL GAP BETWEEN ABUTMENT STAGE 1 & 2 | | T&M |
6,876.96
| 6,876.96 | 0.00 | $1.00 | $0.00 |
| S-31 | MODIFY AT&T UTILITY OPENING | | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| S-32 | ADDITIONAL CONSTRUCTION PHASE BETWEEN PHASE 1 & PAHSE 2 ON STAGE 2 | | T&M |
20,126.43
| 20,126.43 | 0.00 | $1.00 | $0.00 |
| S-33 | MODIFY WINGWALL NO. 4 OVER 24" RCP | | T&M |
1,867.47
| 1,867.47 | 0.00 | $1.00 | $0.00 |
| S-35 | TIME EXTENSION STAGE 2 PHASE 1 | | DAYS |
0.00
| 0.00 | 0.00 | $0.00 | $0.00 |
| S-36 | MISSING TRAFFIC SIGNAL ITEMS | | LS |
1.00
| 1.00 | 0.00 | $16,132.78 | $0.00 |
| S-37 | CONDUIT MODIFICATION (COUPLING, GRC, J-BOXES | | LS |
1.00
| 1.00 | 0.00 | $6,000.00 | $0.00 |
| S-38 | REPLACEMENT OF UNEVEN PAVEMENT S/B DEL MAR AVE | | T&M |
24,493.82
| 24,493.82 | 0.00 | $1.00 | $0.00 |
| S-39 | OFFICE FACILITY | | MTH |
9.00
| 9.00 | 0.00 | $2,500.00 | $0.00 |
| S-40 | IMPLEMENTATION OF SURFACE WATER DIVERSION PLAN PHASE 2 | | MTH |
5.00
| 5.00 | 0.00 | $1,342.42 | $0.00 |
| S-41 | TRAFFIC CONTROL STAGE 2, 3, 4 | | T&M |
6,087.68
| 6,087.68 | 0.00 | $1.00 | $0.00 |
| S-42 | EARLY START ON STAGE 2 PHASE 2 | | WD |
0.00
| 0.00 | 0.00 | $0.00 | $0.00 |
| S-43 | CONCRETE REMOVAL STAGE 2 PHASE 2 | | T&M |
66,875.08
| 66,875.08 | 0.00 | $1.00 | $0.00 |
| S-44 | REMOVAL OF RIVER ROCK, BOULDERS & BURIED CONCRETE | | T&M |
27,922.42
| 27,922.42 | 0.00 | $1.00 | $0.00 |
| S-45 | COMBINE STAGE 2, PHASE 2 AND STAGE 3, PHASE 1 | | LS |
0.00
| 0.00 | 0.00 | $0.00 | $0.00 |
| S-46 | INSTALLATION OF #8 CONDUCTOR WIRE | | T&M |
2,570.40
| 2,570.40 | 0.00 | $1.00 | $0.00 |
| S-47 | REPLACE EXISTING 36" CMP WITH RCP AT SE CORNER OF ABUTMENT 2 | | T&M |
25,747.89
| 25,747.89 | 0.00 | $1.00 | $0.00 |
| S-48 | INSTALLATION OF REGULATORY SIGNS | | T&M |
3,132.24
| 3,132.24 | 0.00 | $1.00 | $0.00 |
| S-49 | TS ANCHOR BOLTS AT BARRIER ELECTROLIER | | T&M |
1,570.32
| 1,570.32 | 0.00 | $1.00 | $0.00 |
| S-50 | RELOCATE PULL BOX S/W CORNER DEL MAR AV & COMMERCIAL DR | | T&M |
4,573.85
| 4,573.85 | 0.00 | $1.00 | $0.00 |
| S-51 | REPLACE EXISTING 36" CMP WITH RCP NORTH SIDE | | T&M |
39,459.82
| 39,459.82 | 0.00 | $1.00 | $0.00 |
| S-52 | REPLACE 11" ANCHOR BOLTS | | T&M |
1,883.28
| 1,883.28 | 0.00 | $1.00 | $0.00 |
| S-53 | RECONSTRUCT CURB & GUTTER AT STA 7+05 | | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| S-54 | CURB RAMP MODIFICATIONS | | T&M |
29,911.20
| 29,911.20 | 0.00 | $1.00 | $0.00 |
| S-55 | TIME EXTENSIONS SCE DELAY | | DAYS |
0.00
| 0.00 | 0.00 | $0.00 | $0.00 |
| S-56 | RECONSTRUCT PORTION OF BENCAMP STREET | | LS |
1.00
| 1.00 | 0.00 | $27,016.00 | $0.00 |
| S-57 | MODIFY RETAINING WALL AT BENCAMP | | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| S-58 | FENCE AT COMMERCIAL CENTER | | LS |
1.00
| 1.00 | 0.00 | $35,000.00 | $0.00 |
| S-59 | CURB MARKINGS ONE COAT PAINT (QTY OVER 25%) | | LF |
362.50
| 362.50 | 0.00 | $5.25 | $0.00 |
| S-60 | CONSTRUCT MOD CB AND RECONSTRUCT, ROADWAY 10+00 - 11+50 | | LS |
0.00
| 0.00 | 0.00 | $206,000.00 | $0.00 |
| S-60A | CONSTRUCT MOD CB AND RECONSTRUCT ROADWAY 10+00 - 11+50 | | LS |
1.00
| 1.00 | 0.00 | $204,025.90 | $0.00 |
| S-61 | CONTRACT TIME EXTENSION | | DAYS |
0.00
| 0.00 | 0.00 | $0.00 | $0.00 |
| S-62 | SCE DELAY | | LS |
1.00
| 1.00 | 0.00 | $37,642.00 | $0.00 |
| S-63 | MITIGATE CAVE IN | | LS |
0.00
| 0.00 | 0.00 | $44,000.00 | $0.00 |
| S-63A | MITIGATE CAVE IN | | LS |
1.00
| 1.00 | 0.00 | $29,839.63 | $0.00 |
| S-64 | RECONSTRUCT DRIVEWAY | | LS |
17,349.64
| 17,349.64 | 0.00 | $1.00 | $0.00 |
| S-65 | RELOCATE 4" SL CONDUIT | | LS |
0.375
| 0.375 | 0.00 | $5,000.00 | $0.00 |
| S-66 | FIELD OVERHEAD EXPENSES | | LS |
0.00
| 0.00 | 0.00 | $42,000.00 | $0.00 |
| S-66A | FIELD OVERHEAD EXPENSES | | LS |
1.00
| 1.00 | 0.00 | $40,000.00 | $0.00 |
| S-67 | STAGE 4 NW DAYS | | DAYS |
0.00
| 0.00 | 0.00 | $0.00 | $0.00 |