| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 13.00 | MTH |
6.00
| 5.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.48
| 0.40 | 0.08 | $2,000.00 | $160.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
0.48
| 0.40 | 0.08 | $20,000.00 | $1,600.00 |
| 6 | RESTORATION OF EXISTING IMPROVEMENTS | 1.00 | LS |
0.24
| 0.08 | 0.16 | $72,300.00 | $11,568.00 |
| 7 | SHORING OF OPEN EXCAVATIONS | 1.00 | LS |
0.48
| 0.40 | 0.08 | $3,110.00 | $248.80 |
| 9 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
0.48
| 0.40 | 0.08 | $5,000.00 | $400.00 |
| 12 | OFFICE FACILITIES | 13.00 | MTH |
6.00
| 5.00 | 1.00 | $2,000.00 | $2,000.00 |
| 14 | CLEARING AND GRUBBING | 1.00 | LS |
0.90
| 0.85 | 0.05 | $34,094.00 | $1,704.70 |
| 19 | UNCLASSIFIED EXCAVATION | 1,490.00 | CY |
675.00
| 405.00 | 270.00 | $45.00 | $12,150.00 |
| 20 | CRUSHED AGGREGATE BASE | 590.00 | CY |
296.00
| 197.00 | 99.00 | $106.00 | $10,494.00 |
| 31 | REMOVE SIGN POST | 3.00 | EA |
3.00
| 2.00 | 1.00 | $110.00 | $110.00 |
| 32 | TRAFFIC CONTROL | 1.00 | LS |
0.55
| 0.47 | 0.08 | $90,300.00 | $7,224.00 |
| 37 | 12" DIAM BLANK STAINLESS STEEL CASING | 1,469.00 | VF |
896.00
| 786.00 | 110.00 | $357.00 | $39,270.00 |
| 39 | GRAVEL PACK 24" DIAM HOLE | 1,595.00 | VF |
951.00
| 793.00 | 158.00 | $161.00 | $25,438.00 |
| 41 | USE OF CONTRACTOR'S DRILL RIG | 190.00 | HR |
16.00
| 15.00 | 1.00 | $170.00 | $170.00 |
| 47 | IMPLEMENTATION OF THE GROUNDWATER MANAGEMENT PLAN | 1.00 | LS |
0.60
| 0.52 | 0.08 | $540,931.00 | $43,274.48 |
| 49 | NOISE CONTROL (ALLOWANCE OF 70,000) | 70,000.00 | AL |
69,999.00
| 58,545.00 | 11,454.00 | $1.00 | $11,454.00 |
| 52 | ABANDON VAULT | 3.00 | EA |
3.00
| 0.00 | 3.00 | $1,500.00 | $4,500.00 |
| 55 | DRILL 24" DIAMETER BOREHOLE | 1,805.00 | VF |
1,017.00
| 852.00 | 165.00 | $316.00 | $52,140.00 |
| 56 | DRILL 30" DIAMETER BOREHOLE | 1,029.00 | VF |
573.00
| 508.00 | 65.00 | $320.00 | $20,800.00 |
| 57 | DRILL 42" DIAMETER BOREHOLE | 385.00 | VF |
385.00
| 245.00 | 140.00 | $670.00 | $93,800.00 |
| 59 | 36" DIAMETER PROTECTIVE STEEL CASING | 385.00 | VF |
385.00
| 245.00 | 140.00 | $285.00 | $39,900.00 |
| 62 | GROUT 30" DIAMETER BOREHOLE | 1,006.00 | VF |
821.00
| 723.00 | 98.00 | $129.00 | $12,642.00 |
| 63 | GROUT 42" DIAMETER BOREHOLE | 385.00 | VF |
371.00
| 231.00 | 140.00 | $200.00 | $28,000.00 |
| 65 | SAND FILTER PACK FOR 30" DIAMETER BOREHOLE | 22.00 | VF |
14.00
| 12.00 | 2.00 | $111.00 | $222.00 |
| 67 | PRECAST INJECTION WELL VAULT | 11.00 | EA |
5.00
| 3.00 | 2.00 | $36,000.00 | $72,000.00 |
| 68 | INJECTION WELL HEAD ASSEMBLY | 11.00 | EA |
3.00
| 2.00 | 1.00 | $16,350.00 | $16,350.00 |
| 70 | WELL BOTTOM CAP (BULL NOSE) | 11.00 | EA |
7.00
| 5.00 | 2.00 | $904.00 | $1,808.00 |
| 71 | 12" DIAMETER STAINLESS STEEL SCREEN CASING | 1,495.00 | VF |
820.00
| 680.00 | 140.00 | $184.00 | $25,760.00 |
| 74 | 3" DIAMETER TREMIE PIPE SCHEDULE 80 PVC | 2,846.00 | VF |
1,576.00
| 1,386.00 | 190.00 | $9.00 | $1,710.00 |
| 76 | 4-INCH DIAMETER STAINLESS STEEL PIPE | 142.00 | LF |
39.00
| 26.00 | 13.00 | $360.00 | $4,680.00 |
| 77 | 6-INCH DIAMETER STAINLESS STEEL PIPE | 341.00 | LF |
114.00
| 76.00 | 38.00 | $446.00 | $16,948.00 |
| 78 | PRIMARY WELL DEVELOPMENT WITH SWABBING AND AIRLIFTING | 550.00 | HR |
150.50
| 111.50 | 39.00 | $542.00 | $21,138.00 |
| 79 | SECONDARY WELL DEVELOPMENT WITH HIGH VELOCITY WATER JETTING AND PUMPING | 800.00 | HR |
10.50
| 6.00 | 4.50 | $542.00 | $2,439.00 |
| 80 | ELECTRICAL WORK | 1.00 | LS |
0.41
| 0.39 | 0.02 | $751,723.00 | $15,034.46 |
| 86 | REMOVE/ABANDON PIPELINE (12" THROUGH 24") | 5.00 | LF |
2.00
| 0.00 | 2.00 | $700.00 | $1,400.00 |
| 88 | PERMEABLE PAVERS | 10,650.00 | SF |
2,740.00
| 1,155.00 | 1,585.00 | $15.00 | $23,775.00 |
| S-2 | INSTALL GREEN SHEETING, REPAIR, AND MAINTENANCE | | T&M |
9,539.00
| 3,816.00 | 5,723.00 | $1.00 | $5,723.00 |
| S-4 | REMOVE INTERFERING THRUST BLOCK | | LS |
1.00
| 0.00 | 1.00 | $1,300.00 | $1,300.00 |
| S-5 | WELL VAULT PCC SLAB MODIFICATION | | LS |
1.00
| 0.00 | 1.00 | $4,800.00 | $4,800.00 |
|