| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 13.00 | MTH |
10.00
| 9.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.80
| 0.72 | 0.08 | $2,000.00 | $160.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
0.80
| 0.72 | 0.08 | $20,000.00 | $1,600.00 |
| 6 | RESTORATION OF EXISTING IMPROVEMENTS | 1.00 | LS |
0.72
| 0.64 | 0.08 | $72,300.00 | $5,784.00 |
| 7 | SHORING OF OPEN EXCAVATIONS | 1.00 | LS |
0.80
| 0.72 | 0.08 | $3,110.00 | $248.80 |
| 9 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
0.80
| 0.72 | 0.08 | $5,000.00 | $400.00 |
| 12 | OFFICE FACILITIES | 13.00 | MTH |
10.00
| 9.00 | 1.00 | $2,000.00 | $2,000.00 |
| 14 | CLEARING AND GRUBBING | 1.00 | LS |
1.00
| 0.95 | 0.05 | $34,094.00 | $1,704.70 |
| 19 | UNCLASSIFIED EXCAVATION | 1,490.00 | CY |
1,490.00
| 1,215.00 | 275.00 | $45.00 | $12,375.00 |
| 20 | CRUSHED AGGREGATE BASE | 590.00 | CY |
590.00
| 494.00 | 96.00 | $106.00 | $10,176.00 |
| 32 | TRAFFIC CONTROL | 1.00 | LS |
0.87
| 0.79 | 0.08 | $90,300.00 | $7,224.00 |
| 35 | LANDSCAPING | 1.00 | LS |
0.75
| 0.50 | 0.25 | $81,355.00 | $20,338.75 |
| 36 | IRRIGATION SYSTEM | 1.00 | LS |
0.75
| 0.50 | 0.25 | $8,100.00 | $2,025.00 |
| 37 | 12" DIAM BLANK STAINLESS STEEL CASING | 1,469.00 | VF |
1,410.00
| 1,152.00 | 258.00 | $357.00 | $92,106.00 |
| 39 | GRAVEL PACK 24" DIAM HOLE | 1,595.00 | VF |
1,595.00
| 1,262.00 | 333.00 | $161.00 | $53,613.00 |
| 41 | USE OF CONTRACTOR'S DRILL RIG | 190.00 | HR |
23.00
| 21.00 | 2.00 | $170.00 | $340.00 |
| 42 | 4" DIAM PVC CONDUCTOR PIPE | 1,143.00 | VF |
480.00
| 240.00 | 240.00 | $17.00 | $4,080.00 |
| 47 | IMPLEMENTATION OF THE GROUNDWATER MANAGEMENT PLAN | 1.00 | LS |
0.92
| 0.84 | 0.08 | $540,931.00 | $43,274.48 |
| 49 | NOISE CONTROL (ALLOWANCE OF 70,000) | 70,000.00 | AL |
109,623.00
| 98,169.00 | 11,454.00 | $1.00 | $11,454.00 |
| 52 | ABANDON VAULT | 3.00 | EA |
2.00
| 0.00 | 2.00 | $1,500.00 | $3,000.00 |
| 55 | DRILL 24" DIAMETER BOREHOLE | 1,805.00 | VF |
1,797.00
| 1,572.00 | 225.00 | $316.00 | $71,100.00 |
| 56 | DRILL 30" DIAMETER BOREHOLE | 1,029.00 | VF |
918.00
| 824.00 | 94.00 | $320.00 | $30,080.00 |
| 58 | 18" DIAMETER PROTECTIVE STEEL CASING | 35.00 | VF |
35.00
| 0.00 | 35.00 | $161.00 | $5,635.00 |
| 61 | GROUT 24" DIAMETER BOREHOLE | 35.00 | VF |
28.00
| 0.00 | 28.00 | $75.00 | $2,100.00 |
| 65 | SAND FILTER PACK FOR 30" DIAMETER BOREHOLE | 22.00 | VF |
22.00
| 18.00 | 4.00 | $111.00 | $444.00 |
| 67 | PRECAST INJECTION WELL VAULT | 11.00 | EA |
8.00
| 7.00 | 1.00 | $36,000.00 | $36,000.00 |
| 68 | INJECTION WELL HEAD ASSEMBLY | 11.00 | EA |
8.00
| 7.00 | 1.00 | $16,350.00 | $16,350.00 |
| 70 | WELL BOTTOM CAP (BULL NOSE) | 11.00 | EA |
11.00
| 9.00 | 2.00 | $904.00 | $1,808.00 |
| 71 | 12" DIAMETER STAINLESS STEEL SCREEN CASING | 1,495.00 | VF |
1,465.00
| 1,095.00 | 370.00 | $184.00 | $68,080.00 |
| 74 | 3" DIAMETER TREMIE PIPE SCHEDULE 80 PVC | 2,846.00 | VF |
2,506.00
| 2,028.00 | 478.00 | $9.00 | $4,302.00 |
| 75 | 1" DIAMETER SCHEDULE 80 PVC TUBE | 2,075.00 | VF |
440.00
| 210.00 | 230.00 | $4.00 | $920.00 |
| 76 | 4-INCH DIAMETER STAINLESS STEEL PIPE | 142.00 | LF |
124.00
| 111.00 | 13.00 | $360.00 | $4,680.00 |
| 77 | 6-INCH DIAMETER STAINLESS STEEL PIPE | 341.00 | LF |
297.00
| 266.00 | 31.00 | $446.00 | $13,826.00 |
| 78 | PRIMARY WELL DEVELOPMENT WITH SWABBING AND AIRLIFTING | 550.00 | HR |
271.00
| 215.00 | 56.00 | $542.00 | $30,352.00 |
| 79 | SECONDARY WELL DEVELOPMENT WITH HIGH VELOCITY WATER JETTING AND PUMPING | 800.00 | HR |
25.00
| 21.00 | 4.00 | $542.00 | $2,168.00 |
| 80 | ELECTRICAL WORK | 1.00 | LS |
0.76
| 0.56 | 0.20 | $751,723.00 | $150,344.60 |
| 86 | REMOVE/ABANDON PIPELINE (12" THROUGH 24") | 5.00 | LF |
3.00
| 2.00 | 1.00 | $700.00 | $700.00 |
| 87 | PCC EDGING | 1,474.00 | LF |
1,318.00
| 874.00 | 444.00 | $54.00 | $23,976.00 |
| 88 | PERMEABLE PAVERS | 10,650.00 | SF |
8,102.00
| 5,577.00 | 2,525.00 | $15.00 | $37,875.00 |
| 90 | REMOVABLE, LOCKABLE BOLLARDS | 21.00 | EA |
15.00
| 9.00 | 6.00 | $1,500.00 | $9,000.00 |
| 92 | INTERPRETIVE KIOSK | 1.00 | EA |
1.00
| 0.00 | 1.00 | $20,000.00 | $20,000.00 |
|