| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,000.00 | $0.00 |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 9.00 | MTH |
17.00
| 17.00 | 0.00 | $500.00 | $0.00 |
| 3 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $1,000.00 | $1,000.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
1.00
| 1.00 | 0.00 | $25,000.00 | $0.00 |
| 5 | PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $5,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 6 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
1.00
| 1.00 | 0.00 | $35,000.00 | $0.00 |
| 7 | PREPARATION OF THE CONTAMINATED SOIL MANAGEMENT PLAN (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 8 | PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 9 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
1.00
| 1.00 | 0.00 | $25,000.00 | $0.00 |
| 10 | DISPOSAL OF CONTAMINATED SOIL, CLASS I LANDFILL | 45.00 | TON |
51.00
| 51.00 | 0.00 | $150.00 | $0.00 |
| 11 | EXCLUSIONARY FENCING | 50.00 | LF |
50.00
| 50.00 | 0.00 | $200.00 | $0.00 |
| 12 | SILT FENCE (SLOPE PROTECTION) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $20,000.00 | $0.00 |
| 13 | OFFICE FACILITIES | 9.00 | MTH |
17.00
| 17.00 | 0.00 | $2,500.00 | $0.00 |
| 14 | MOBILIZATION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $300,000.00 | $0.00 |
| 15 | CITY OF SIERRA MADRE PERMIT FEES (ALLOWANCE OF $10,000) | 10,000.00 | AL |
4,352.66
| 4,352.66 | 0.00 | $1.00 | $0.00 |
| 16 | ELECTRICAL WORK | 1.00 | LS |
1.00
| 1.00 | 0.00 | $50,000.00 | $0.00 |
| 17 | MECHANICAL WORK | 1.00 | LS |
1.00
| 1.00 | 0.00 | $100,000.00 | $0.00 |
| 18 | CLEARING AND GRUBBING | 1.00 | LS |
1.00
| 1.00 | 0.00 | $250,000.00 | $0.00 |
| 19 | ROOT PRUNE TREE (INCL ROOT CONTROL BARRIER) | 7.00 | EA |
7.00
| 7.00 | 0.00 | $250.00 | $0.00 |
| 20 | CROWN REDUCTION, TREE (13" - 24" DIAMETER) | 3.00 | EA |
3.00
| 3.00 | 0.00 | $100.00 | $0.00 |
| 21 | REMOVE EXISTING CHAIN LINK FENCE | 374.00 | LF |
314.00
| 314.00 | 0.00 | $10.00 | $0.00 |
| 22 | REMOVE EXISTING RAIL & TIMBER FENCE | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 23 | REMOVE EXISTING PIPE GATE | 1.00 | EA |
1.00
| 1.00 | 0.00 | $400.00 | $0.00 |
| 24 | REMOVE EXISTING SECURITY GATE ASSEMBLY | 1.00 | EA |
1.00
| 1.00 | 0.00 | $500.00 | $0.00 |
| 25 | REMOVE EXISTING 4" PVC PIPE AND CATCH BASIN | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
| 26 | REMOVE EXISTING METAL PIPE | 304.00 | LF |
304.00
| 304.00 | 0.00 | $10.00 | $0.00 |
| 27 | REMOVE TELECOMMUNICATIONS POLE | 1.00 | EA |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
| 28 | REMOVE GROUTED RIPRAP | 4.00 | CY |
4.00
| 4.00 | 0.00 | $50.00 | $0.00 |
| 29 | CONCRETE REMOVAL (NON-REINFORCED) | 20.00 | CY |
21.00
| 20.00 | 1.00 | $50.00 | $50.00 |
| 30 | UNCLASSIFIED EXCAVATION | 481.00 | CY |
522.50
| 501.00 | 21.50 | $50.00 | $1,075.00 |
| 31 | STRUCTURE EXCAVATION (BRIDGE) | 257.00 | CY |
257.00
| 257.00 | 0.00 | $100.00 | $0.00 |
| 32 | STRUCTURE EXCAVATION (ROCKFALL PROTECTION) | 8.00 | CY |
10.00
| 10.00 | 0.00 | $1,300.00 | $0.00 |
| 33 | STRUCTURE BACKFILL (BRIDGE) | 150.00 | CY |
150.00
| 150.00 | 0.00 | $50.00 | $0.00 |
| 34 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) | 127.00 | CY |
158.75
| 158.75 | 0.00 | $200.00 | $0.00 |
| 35 | AC PAVEMENT(PATCH BACK) | 2.00 | TON |
2.00
| 2.00 | 0.00 | $2,500.00 | $0.00 |
| 36 | PCC PAVEMENT | 480.00 | CY |
501.50
| 501.50 | 0.00 | $1,000.00 | $0.00 |
| 37 | RESIDENTIAL STREET REPAIR (ALLOWANCE OF $100,000) | 100,000.00 | AL |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
| 38 | STRUCTURE CONCRETE (BRIDGE) | 452.00 | CY |
452.00
| 452.00 | 0.00 | $1,250.00 | $0.00 |
| 39 | STRUCTURE CONCRETE (ROCKFALL PROTECTION) | 18.00 | CY |
15.25
| 15.25 | 0.00 | $2,000.00 | $0.00 |
| 40 | TEMPORARY FALSEWORK | 1.00 | LS |
1.00
| 1.00 | 0.00 | $35,000.00 | $0.00 |
| 41 | PREPARE CONCRETE DECK SURFACE | 6,400.00 | SF |
0.00
| 0.00 | 0.00 | $5.00 | $0.00 |
| 42 | BRIDGE DECK TREATMENT MATERIAL | 80.00 | GAL |
0.00
| 0.00 | 0.00 | $150.00 | $0.00 |
| 43 | TREAT BRIDGE DECK | 6,400.00 | SF |
0.00
| 0.00 | 0.00 | $5.00 | $0.00 |
| 44 | ELASTOMERIC BEARING PAD | 202.00 | EA |
202.00
| 202.00 | 0.00 | $200.00 | $0.00 |
| 45 | BAR REINFORCING STEEL (BRIDGE) | 139,000.00 | LB |
139,000.00
| 139,000.00 | 0.00 | $1.25 | $0.00 |
| 46 | BAR REINFORCING STEEL (ROCKFALL PROTECTION) | 4,806.00 | LB |
3,351.00
| 3,351.00 | 0.00 | $3.50 | $0.00 |
| 47 | JOINT SEAL, TYPE B | 64.00 | LF |
64.00
| 64.00 | 0.00 | $150.00 | $0.00 |
| 48 | CATCH BASIN PER STD PLAN 304, 2 GRATES | 1.00 | EA |
0.00
| 0.00 | 0.00 | $5,000.00 | $0.00 |
| 49 | WEEP DRAIN | 129.00 | EA |
38.00
| 38.00 | 0.00 | $1,850.00 | $0.00 |
| 50 | REINFORCED CONCRETE STAIRWAY PER STD PLAN 640 | 3.00 | CY |
3.50
| 3.50 | 0.00 | $1,500.00 | $0.00 |
| 51 | PCC FOOTING FOR REINFORCED CONCRETE STAIRWAY | 3.00 | CY |
3.00
| 3.00 | 0.00 | $1,500.00 | $0.00 |
| 52 | REINFORCED CONCRETE WALL FOR STAIRWAY, 8" THICK | 48.00 | SF |
48.00
| 48.00 | 0.00 | $100.00 | $0.00 |
| 53 | REINFORCED CONCRETE CUTOFF WALL, 8" THICK | 19.00 | LF |
19.00
| 19.00 | 0.00 | $250.00 | $0.00 |
| 54 | AIR-PLACED CONCRETE, 3" | 28.00 | SY |
125.00
| 125.00 | 0.00 | $625.00 | $0.00 |
| 55 | AIR-PLACED CONCRETE, 6" | 261.00 | SY |
218.20
| 218.20 | 0.00 | $625.00 | $0.00 |
| 56 | 4 X 4 X W2.0 X W2.0 WELDED WIRE MESH | 261.00 | SY |
218.20
| 218.20 | 0.00 | $180.00 | $0.00 |
| 57 | PCC CURB, TYPE A1-VAR | 12.00 | LF |
17.00
| 12.00 | 5.00 | $50.00 | $250.00 |
| 58 | PCC CURB & GUTTER, TYPE A2-1 | 26.00 | LF |
28.00
| 26.00 | 2.00 | $50.00 | $100.00 |
| 59 | METAL HAND RAILINGS PER STD PLAN 606 | 37.00 | LF |
50.00
| 50.00 | 0.00 | $122.00 | $0.00 |
| 60 | CABLE RAILING (CALTRANS STD PLAN B11-47) (MODIFIED) | 400.00 | LF |
400.00
| 400.00 | 0.00 | $63.80 | $0.00 |
| 61 | CHAIN LINK FENCE, 4' HIGH | 45.00 | LF |
48.00
| 48.00 | 0.00 | $62.00 | $0.00 |
| 62 | CHAIN LINK FENCE, 8' HIGH | 30.00 | LF |
30.00
| 30.00 | 0.00 | $88.50 | $0.00 |
| 63 | GALVANIZED STEEL PICKET FENCE, 8' HIGH | 225.00 | LF |
225.00
| 225.00 | 0.00 | $254.80 | $0.00 |
| 64 | GALVANIZED STEEL PICKET WALK GATE, 8' HIGH | 5.00 | LF |
5.00
| 5.00 | 0.00 | $953.00 | $0.00 |
| 65 | GALVANIZED STEEL PICKET DOUBLE SWING GATE, 8' HIGH | 35.00 | LF |
35.00
| 35.00 | 0.00 | $501.40 | $0.00 |
| 66 | PIPE GATE PER STD PLAN 602, W=16' | 1.00 | EA |
1.00
| 1.00 | 0.00 | $10,340.00 | $0.00 |
| 67 | 24" DIA CIDH PILES | 108.00 | LF |
98.00
| 98.00 | 0.00 | $300.00 | $0.00 |
| 68 | 36" DIA CIDH PILES | 422.00 | LF |
422.00
| 422.00 | 0.00 | $450.00 | $0.00 |
| 69 | 12" RCP, 2000 D | 18.00 | LF |
18.00
| 18.00 | 0.00 | $500.00 | $0.00 |
| 70 | 2" COPPER PIPE, TYPE K | 250.00 | LF |
250.00
| 250.00 | 0.00 | $75.00 | $0.00 |
| 71 | IMPORTED TRENCH BACKFILL | 7.00 | CY |
7.00
| 7.00 | 0.00 | $100.00 | $0.00 |
| 72 | ROCK DOWEL (INCL NON-SHRINK GROUT) | 222.00 | EA |
125.00
| 125.00 | 0.00 | $625.00 | $0.00 |
| 73 | ROCK BLOCK REMOVAL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $40,000.00 | $0.00 |
| 74 | ROCKFALL PROTECTION BARRIER SYSTEM | 1.00 | LS |
1.00
| 1.00 | 0.00 | $235,000.00 | $0.00 |
| 75 | ANCHOR INSTALLATION | 1,305.00 | LF |
1,379.00
| 1,379.00 | 0.00 | $100.00 | $0.00 |
| 76 | ANCHOR RE-DRILL & RE-TEST (WATER TIGHTNESS) | 1,050.00 | LF |
1,312.50
| 1,312.50 | 0.00 | $51.00 | $0.00 |
| 77 | GROUT FOR ANCHOR RE-TESTING (WATER TIGHTNESS) | 4.00 | CY |
5.00
| 5.00 | 0.00 | $4,400.00 | $0.00 |
| 78 | ANCHOR TESTING | 30.00 | EA |
30.00
| 30.00 | 0.00 | $1,000.00 | $0.00 |
| 79 | 750-GALLON SEWAGE HOLDING TANK AND APPURTENANCES | 1.00 | LS |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
| 80 | TOILET AND ACCESSORIES | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 81 | WALL MOUNTED SINK AND ACCESSORIES | 1.00 | LS |
1.00
| 1.00 | 0.00 | $25,000.00 | $0.00 |
| S-1 | MODIFY THICKNESS OF CAP BEAM | | LS |
1.00
| 1.00 | 0.00 | $3,000.00 | $0.00 |
| S-2 | NONWORKING DAYS | | WD |
0.00
| 0.00 | 0.00 | $0.00 | $0.00 |
| S-3 | THIS CHANGE ORDER SERVES AS A SUPPLEMENT TO CIWR #3 FOR ADDITIONAL QUANTITIES REQUIRED TO RE-GROUT HOLES FOR EACH ROCK ANCHOR | | CY |
20.80
| 20.80 | 0.00 | $2,200.00 | $0.00 |
| S-4 | REVISE CB 304 TO 1 GRATE | | LS |
7,500.00
| 7,500.00 | 0.00 | $1.00 | $0.00 |
| S-5 | REVISED PCC STAIRWAY | | T&M |
10,959.54
| 10,959.54 | 0.00 | $1.00 | $0.00 |
| S-6 | ANCHOR RE-DRILL & RE-TEST (WATER TIGHTNESS) | | LF |
2,229.50
| 2,229.50 | 0.00 | $44.54 | $0.00 |
| S-7 | ADDITIONAL STRUCTURE EXCAVATION-ROCKFALL PROTECTION | | CY |
15.00
| 15.00 | 0.00 | $1,226.50 | $0.00 |
| S-8 | GROSS WEIGHT RESTRICTIONS ON WOODLAND DR. IN THE CITY OF SIERRA MADRE | | LS |
1.00
| 1.00 | 0.00 | $22,500.00 | $0.00 |
| S-9 | PCC V DITCH | | T&M |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
| S-10 | REPAIR AC PAVEMENT | | T&M |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
| S-11 | PCC V DITCH | | LS |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
| S-12 | REPAIR AC PAVEMENT | | LS |
1.00
| 1.00 | 0.00 | $6,500.00 | $0.00 |
| S-13 | TOILET AND ACCESSORIES | | LS |
0.00
| 0.00 | 0.00 | $0.00 | $0.00 |
| S-14 | REPLACEMENT OF 2 INCH WATER LINE | | LS |
1.00
| 1.00 | 0.00 | $4,900.00 | $0.00 |
| S-15 | EXCESS SCALING DISPOSAL | | LS |
0.00
| 0.00 | 0.00 | $46,000.00 | $0.00 |
| S-15A | EXCESS SCALING DISPOSAL | | LS |
1.00
| 1.00 | 0.00 | $43,500.00 | $0.00 |
| S-16 | CONTRACT TIME EXTENSION | | WD |
0.00
| 0.00 | 0.00 | $0.00 | $0.00 |
| S-17 | 2" GATE VALVE REPLACEMENT | | LS |
1.00
| 1.00 | 0.00 | $1,200.00 | $0.00 |
| S-18 | ADDITIONAL TIMBER RAILING REMOVAL | | LS |
1.00
| 1.00 | 0.00 | $11,000.00 | $0.00 |
| S-19 | ADDITIONAL PICKET FENCE | | LS |
1.00
| 1.00 | 0.00 | $75,000.00 | $0.00 |
| S-20 | TWW DISPOSAL | | T&M |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
| S-21 | TWW DISPOSAL | | LS |
1.00
| 1.00 | 0.00 | $6,500.00 | $0.00 |
| S-22 | INSTALL SILT FENCE AND OTHER WORK | | LS |
1.00
| 1.00 | 0.00 | $9,700.00 | $0.00 |
| S-23 | COMPENSABLE DELAY COSTS | | WD |
29.00
| 29.00 | 0.00 | $1,500.00 | $0.00 |
| S-24 | ADDITIONAL BACKFILL SLURRY | | T&M |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
| S-25 | ADDITIONAL BACKFILL SLURRY | | LS |
1.00
| 1.00 | 0.00 | $22,500.00 | $0.00 |
| S-26 | UNCLASSIFIED EXCAVATION UNDER BRIDGE | | LS |
1.00
| 1.00 | 0.00 | $20,000.00 | $0.00 |
| S-27 | FURNISH BRIDGE DECK TREATMENT MATERIALS | | LS |
1.00
| 1.00 | 0.00 | $9,000.00 | $0.00 |
| S-28 | CLEAN CONCRETE DECK SURFACE | | LS |
1.00
| 1.00 | 0.00 | $32,000.00 | $0.00 |
| S-29 | ADDITIONAL IMPLEMENTATION OF LTWHP AND SWPPP | | LS |
1.00
| 0.00 | 1.00 | $5,500.00 | $5,500.00 |
| S-30 | ELIMINATION OF GRINDING AND GROOVING | | LS |
1.00
| 0.00 | 1.00 | ($14,875.00) | ($14,875.00) |
| S-31 | ADDITIONAL NON WORKING DAYS | | WD |
10.00
| 0.00 | 10.00 | $0.00 | $0.00 |
| S-32 | INCREASE SHOTCRETE REPAIR LOCATIONS | | LS |
1.00
| 0.00 | 1.00 | $18,000.00 | $18,000.00 |
| S-33 | MODIFICATIONS TO AIR PLACED CONCRETE | | LS |
1.00
| 0.00 | 1.00 | $50,000.00 | $50,000.00 |