| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $5,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 3.00 | MTH |
3.00
| 3.00 | 0.00 | $500.00 | $0.00 |
| 3 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
| 4 | IMPLEMENTATION OF BMPS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 5 | OFFICE FACILITIES | 4.00 | MTH |
4.00
| 4.00 | 0.00 | $1,000.00 | $0.00 |
| 6 | MOBILIZATION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $80,000.00 | $0.00 |
| 7 | TRAFFIC CONTROL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $20,000.00 | $0.00 |
| 8 | CLEARING AND GRUBBING | 1.00 | LS |
1.00
| 1.00 | 0.00 | $20,000.00 | $0.00 |
| 9 | TREE REMOVAL (6"-12" DIAMETER) | 4.00 | EA |
4.00
| 4.00 | 0.00 | $400.00 | $0.00 |
| 10 | UNCLASSIFIED EXCAVATION | 78.00 | CY |
78.00
| 78.00 | 0.00 | $200.00 | $0.00 |
| 11 | UNCLASSIFIED EXCAVATION (INVERTED SHOULDERS) | 12.00 | CY |
12.00
| 12.00 | 0.00 | $200.00 | $0.00 |
| 12 | STRUCTURE EXCAVATION (RETAINING WALL) | 167.00 | CY |
167.00
| 167.00 | 0.00 | $250.00 | $0.00 |
| 13 | STRUCTURE BACKFILL (RETAINING WALL) | 34.00 | CY |
34.00
| 34.00 | 0.00 | $300.00 | $0.00 |
| 14 | NO. 3 CONCRETE AGGREGATE | 6.00 | CY |
5.00
| 5.00 | 0.00 | $350.00 | $0.00 |
| 15 | TRENCH BACKFILL SLURRY (CLASS 100-E-100) | 52.00 | CY |
52.00
| 52.00 | 0.00 | $150.00 | $0.00 |
| 16 | AC PAVEMENT | 24.00 | TON |
27.45
| 27.45 | 0.00 | $500.00 | $0.00 |
| 17 | STRUCTURE CONCRETE (RETAINING WALL) | 53.00 | CY |
53.00
| 53.00 | 0.00 | $2,795.00 | $0.00 |
| 18 | BAR REINFORCING STEEL | 8,000.00 | LB |
8,000.00
| 8,000.00 | 0.00 | $5.00 | $0.00 |
| 19 | CABLE RAILING (CALTRANS STD PLAN B11-47) | 96.00 | LF |
96.00
| 96.00 | 0.00 | $75.00 | $0.00 |
| 20 | CONST & REMOVE TEMP CHAIN LINK FENCE | 160.00 | LF |
160.00
| 160.00 | 0.00 | $80.00 | $0.00 |
| 21 | STRUCTURE CONCRETE (CIDH PILES) | 90.00 | CY |
90.00
| 90.00 | 0.00 | $490.00 | $0.00 |
| 22 | INSTALL STEEL PILE | 11.00 | EA |
11.00
| 11.00 | 0.00 | $1,200.00 | $0.00 |
| 23 | DRILL PILE HOLES, 36" DIA | 561.00 | LF |
492.00
| 492.00 | 0.00 | $98.00 | $0.00 |
| 24 | FURNISH STEEL PILES | 137,500.00 | LB |
137,500.00
| 137,500.00 | 0.00 | $1.40 | $0.00 |
| 25 | MISCELLANEOUS METAL (RETAINING WALL) | 180.00 | LB |
180.00
| 180.00 | 0.00 | $69.00 | $0.00 |
| 26 | PREFABRICATED DRAINAGE COMPOSITE | 960.00 | SF |
960.00
| 960.00 | 0.00 | $14.00 | $0.00 |
| 27 | TIMBER LAGGING | 7.00 | MBF |
7.00
| 7.00 | 0.00 | $3,500.00 | $0.00 |
| 28 | CONCRETE SURFACE TEXTURE | 865.00 | SF |
865.00
| 865.00 | 0.00 | $8.00 | $0.00 |
| 29 | NON-WOVEN GEOTEXTILE FABRIC | 65.00 | SY |
60.00
| 60.00 | 0.00 | $58.00 | $0.00 |
| 30 | 6" DIAMETER PVC PIPE, SCH 80 | 125.00 | LF |
125.00
| 125.00 | 0.00 | $78.00 | $0.00 |
| 31 | MIDWEST GUARDRAIL SYSTEM (STEEL POST W/ PLASTIC BLOCK) | 163.00 | LF |
163.00
| 163.00 | 0.00 | $70.00 | $0.00 |
| 32 | IN-LINE TERMINAL SYSTEM (TYPE MSKT-SP-MGS) | 2.00 | EA |
2.00
| 2.00 | 0.00 | $3,500.00 | $0.00 |
| 33 | SHOULDER GRADING | 333.00 | LF |
333.00
| 333.00 | 0.00 | $27.00 | $0.00 |
| 34 | CONCRETE VEGETATION CONTROL (PER CALTRANS STD PLAN A77N5) | 15.00 | EA |
15.00
| 15.00 | 0.00 | $475.00 | $0.00 |
| 35 | HMA DIKE PER CALTRANS STD PLAN A87B | 333.00 | LF |
335.00
| 335.00 | 0.00 | $30.00 | $0.00 |
| 36 | DELINEATOR PER CALTRANS STD PLAN A77N4 | 11.00 | EA |
10.00
| 10.00 | 0.00 | $59.00 | $0.00 |
| S-1 | ADDITIONAL DRILLING COST | | LS |
1.00
| 1.00 | 0.00 | $35,000.00 | $0.00 |