| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 34.00 | MTH |
15.00
| 14.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.45
| 0.42 | 0.03 | $115,000.00 | $3,450.00 |
| 6 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.45
| 0.42 | 0.03 | $300,000.00 | $9,000.00 |
| 12 | IMPLEMENTATION OF THE FUGITIVE DUST CONTROL PLAN | 34.00 | MTH |
15.00
| 14.00 | 1.00 | $8,000.00 | $8,000.00 |
| 15 | VEHICLES AND EQUIPMENT EMISSIONS REPORTING | 34.00 | MTH |
15.00
| 14.00 | 1.00 | $8,000.00 | $8,000.00 |
| 18 | NOISE MONITORING AND REPORTING | 34.00 | MTH |
15.00
| 14.00 | 1.00 | $6,000.00 | $6,000.00 |
| 20 | IMPLEMENTATION OF THE QUALITY CONTROL PROGRAM FOR MOISTURE CONTENT | 682.00 | DAY |
269.00
| 252.00 | 17.00 | $1,000.00 | $17,000.00 |
| 22 | OFFICE FACILITIES | 34.00 | MTH |
15.00
| 14.00 | 1.00 | $5,000.00 | $5,000.00 |
| 25 | MAINTENANCE OF TIRE WASHES | 90.00 | MTH |
30.00
| 28.00 | 2.00 | $3,500.00 | $7,000.00 |
| 26 | WATER TRUCKS | 682.00 | DAY |
297.00
| 277.00 | 20.00 | $1,500.00 | $30,000.00 |
| 27 | STREET SWEEPING | 682.00 | DAYS |
288.00
| 269.00 | 19.00 | $1,500.00 | $28,500.00 |
| 29 | CONSTRUCTION OF TEMPORARY SOUND BARRIER | 5,800.00 | LF |
5,742.81
| 5,718.81 | 24.00 | $210.00 | $5,040.00 |
| 30 | MAINTENANCE OF TEMPORARY SOUND BARRIER | 5,800.00 | LF |
2,565.00
| 2,394.00 | 171.00 | $23.00 | $3,933.00 |
| 44 | UNCLASSIFIED EXCAVATION | 13,881.00 | CY |
11,149.80
| 5,341.00 | 5,808.80 | $9.00 | $52,279.20 |
| 45 | BASIN EXCAVATION | 2,085,952.00 | CY |
589,080.00
| 515,801.00 | 73,279.00 | $2.30 | $168,541.70 |
| 49 | EXCAVATION, TRANSPORTATION AND DISPOSAL OF EXCESS BASIN MATERIAL | 1,343,403.00 | CY |
671,127.06
| 626,577.18 | 44,549.88 | $15.00 | $668,248.20 |
| 57 | STRUCTURE EXCAVATION (OUTFALL STRUCTURE FOR EAST SETTLING BASIN) | 61.00 | CY |
61.00
| 0.00 | 61.00 | $160.00 | $9,760.00 |
| 58 | STRUCTURE EXCAVATION (OUTFALL STRUCTURE FOR WEST SETTLING BASIN) | 42.00 | CY |
42.00
| 0.00 | 42.00 | $235.00 | $9,870.00 |
| 71 | AC PAVEMENT (TEMPORARY ACCESS ROAD AND RAMP) | 1,500.00 | TON |
1,500.00
| 1,487.48 | 12.52 | $115.00 | $1,439.80 |
| 72 | AC PAVEMENT (TEMPORARY ACCESS ROAD MAINTENANCE) | 1,500.00 | TON |
675.00
| 630.00 | 45.00 | $25.00 | $1,125.00 |
| 76 | REINFORCED CONCRETE ACCESS RAMP | 160.00 | CY |
160.00
| 148.50 | 11.50 | $1,600.00 | $18,400.00 |
| 105 | EXPANDED METAL CAGE ENCLOSURE FOR LOW FLOW AND CONCRETE LINED BASINS | 3.00 | EA |
1.50
| 0.00 | 1.50 | $30,000.00 | $45,000.00 |
| 109 | 8' - 6" W X 3' - 0" H DBL RCB | 128.00 | LF |
45.00
| 0.00 | 45.00 | $2,100.00 | $94,500.00 |
| 138 | TRAFFIC CONTROL | 1.00 | LS |
0.39
| 0.36 | 0.03 | $100,000.00 | $3,000.00 |
| S-2 | CONCRETE REMOVAL (MESH REINFORCED) | | LS |
0.95
| 0.80 | 0.15 | $251,144.00 | $37,671.60 |
| S-5A | SHORING AT EAST SIDE OF INTAKE CHANNEL | | LS |
1.00
| 0.75 | 0.25 | $193,059.30 | $48,264.83 |
|