Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $2,500.00 | $2,500.00 |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 8.00 | MTH |
1.00
| 0.00 | 1.00 | $500.00 | $500.00 |
4 | PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $2,500.00 | $2,500.00 |
5 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.10
| 0.00 | 0.10 | $23,000.00 | $2,300.00 |
6 | OFFICE FACILITIES | 9.00 | MTH |
1.00
| 0.00 | 1.00 | $2,600.00 | $2,600.00 |
14 | REMOVE EXISTING TUBULAR STEEL FENCE | 156.00 | LF |
45.00
| 0.00 | 45.00 | $22.00 | $990.00 |
15 | CONCRETE REMOVAL (NON-REINFORCED) | 3,146.00 | CY |
233.34
| 0.00 | 233.34 | $200.00 | $46,668.00 |
17 | UNCLASSIFIED EXCAVATION | 4,651.00 | CY |
354.02
| 0.00 | 354.02 | $135.00 | $47,792.70 |
18 | CRUSHED MISCELLANEOUS BASE | 4,751.00 | CY |
126.00
| 0.00 | 126.00 | $120.00 | $15,120.00 |
27 | PCC PAVEMENT | 310.00 | CY |
4.81
| 0.00 | 4.81 | $600.00 | $2,886.00 |
40 | PCC CURB & GUTTER, TYPE A2-8 | 2,158.00 | LF |
177.40
| 0.00 | 177.40 | $48.00 | $8,515.20 |
41 | PCC CURB & GUTTER, TYPE A2-VAR | 3,744.00 | LF |
188.40
| 0.00 | 188.40 | $49.00 | $9,231.60 |
43 | RECONSTRUCT LOCAL DEPRESSION PER STD PLAN 313-3 CASE E | 3.00 | EA |
1.00
| 0.00 | 1.00 | $3,000.00 | $3,000.00 |
44 | PCC WALK, 4" THICK | 40,585.00 | SF |
1,492.50
| 0.00 | 1,492.50 | $10.00 | $14,925.00 |
45 | PCC CURB RAMPS | 461.00 | CY |
12.63
| 0.00 | 12.63 | $1,200.00 | $15,156.00 |
46 | PCC DRIVEWAYS, 6" THICK | 1,697.00 | SF |
54.00
| 0.00 | 54.00 | $13.00 | $702.00 |
47 | DETECTABLE WARNING SURFACE | 3,742.00 | SF |
108.50
| 0.00 | 108.50 | $40.00 | $4,340.00 |
48 | CROSS GUTTER | 121.00 | CY |
32.20
| 0.00 | 32.20 | $700.00 | $22,540.00 |
93 | TRAFFIC CONTROL | 1.00 | LS |
0.10
| 0.00 | 0.10 | $211,000.00 | $21,100.00 |
94 | FLASHING ARROW SIGN | 2.00 | EA |
1.00
| 0.00 | 1.00 | $6,000.00 | $6,000.00 |
95 | CHANGEABLE MESSAGE SIGN | 2.00 | EA |
1.00
| 0.00 | 1.00 | $9,000.00 | $9,000.00 |
S-2 | PULL BOXES EXPLORATION | | T&M |
14,302.41
| 0.00 | 14,302.41 | $1.00 | $14,302.41 |
S-3 | TRAFFIC SIGNAL COMPONENTS | | T&M |
239,840.28
| 0.00 | 239,840.28 | $1.00 | $239,840.28 |
|