Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 8.00 | MTH |
3.00
| 1.00 | 2.00 | $500.00 | $1,000.00 |
5 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.30
| 0.20 | 0.10 | $23,000.00 | $2,300.00 |
6 | OFFICE FACILITIES | 9.00 | MTH |
3.00
| 2.00 | 1.00 | $2,600.00 | $2,600.00 |
8 | MOBILIZATION | 1.00 | LS |
0.75
| 0.50 | 0.25 | $945,000.00 | $236,250.00 |
14 | REMOVE EXISTING TUBULAR STEEL FENCE | 156.00 | LF |
90.00
| 45.00 | 45.00 | $22.00 | $990.00 |
15 | CONCRETE REMOVAL (NON-REINFORCED) | 3,146.00 | CY |
887.57
| 585.02 | 302.55 | $200.00 | $60,510.00 |
17 | UNCLASSIFIED EXCAVATION | 4,651.00 | CY |
1,312.64
| 1,092.84 | 219.80 | $135.00 | $29,673.00 |
18 | CRUSHED MISCELLANEOUS BASE | 4,751.00 | CY |
1,132.87
| 424.74 | 708.13 | $120.00 | $84,975.60 |
22 | AC PAVEMENT | 643.00 | TON |
264.00
| 94.00 | 170.00 | $110.00 | $18,700.00 |
23 | AC PAVEMENT(PATCH BACK) | 1,008.00 | TON |
84.12
| 27.56 | 56.56 | $200.00 | $11,312.00 |
27 | PCC PAVEMENT | 310.00 | CY |
130.10
| 27.00 | 103.10 | $600.00 | $61,860.00 |
28 | PCC CROSSWALK PER DETAIL G, SHEET 11 | 8.00 | CY |
4.00
| 0.00 | 4.00 | $1,200.00 | $4,800.00 |
34 | CURB DRAIN PER STD PLAN 150, N=1, CASE 3 INLET | 16.00 | EA |
5.00
| 0.00 | 5.00 | $500.00 | $2,500.00 |
35 | CURB DRAIN PER STD PLAN 150, N=2, CASE 3 INLET | 2.00 | EA |
1.00
| 0.00 | 1.00 | $600.00 | $600.00 |
38 | PCC CURB, TYPE A1-VAR | 516.00 | LF |
363.86
| 41.00 | 322.86 | $36.00 | $11,622.96 |
40 | PCC CURB & GUTTER, TYPE A2-8 | 2,158.00 | LF |
1,077.30
| 716.30 | 361.00 | $48.00 | $17,328.00 |
41 | PCC CURB & GUTTER, TYPE A2-VAR | 3,744.00 | LF |
652.23
| 378.73 | 273.50 | $49.00 | $13,401.50 |
44 | PCC WALK, 4" THICK | 40,585.00 | SF |
14,295.54
| 5,630.57 | 8,664.97 | $10.00 | $86,649.70 |
45 | PCC CURB RAMPS | 461.00 | CY |
123.09
| 67.30 | 55.79 | $1,200.00 | $66,948.00 |
46 | PCC DRIVEWAYS, 6" THICK | 1,697.00 | SF |
978.00
| 348.00 | 630.00 | $13.00 | $8,190.00 |
47 | DETECTABLE WARNING SURFACE | 3,742.00 | SF |
715.50
| 442.00 | 273.50 | $40.00 | $10,940.00 |
48 | CROSS GUTTER | 121.00 | CY |
120.00
| 94.00 | 26.00 | $700.00 | $18,200.00 |
49 | CROSS GUTTER (MOD) | 143.00 | CY |
30.17
| 0.00 | 30.17 | $700.00 | $21,119.00 |
55 | ADJUST PULL BOX | 113.00 | EA |
26.00
| 5.00 | 21.00 | $500.00 | $10,500.00 |
93 | TRAFFIC CONTROL | 1.00 | LS |
0.30
| 0.20 | 0.10 | $211,000.00 | $21,100.00 |
95 | CHANGEABLE MESSAGE SIGN | 2.00 | EA |
2.00
| 1.00 | 1.00 | $9,000.00 | $9,000.00 |
S-3 | TRAFFIC SIGNAL COMPONENTS | | T&M |
470,142.42
| 387,170.59 | 82,971.83 | $1.00 | $82,971.83 |
S-4 | WHEELCHAIR RAMPS | | NEG |
0.20
| 0.00 | 0.20 | $38,332.75 | $7,666.55 |
|