| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
1.00
| 0.93 | 0.07 | $35,000.00 | $2,450.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
0.96
| 0.93 | 0.03 | $35,000.00 | $1,050.00 |
| 8 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
0.96
| 0.93 | 0.03 | $35,000.00 | $1,050.00 |
| 17 | 6" WATERMAIN, .25" THICK STL | 50.00 | LF |
50.00
| 24.00 | 26.00 | $300.00 | $7,800.00 |
| 21 | GATE VALVE, 250 PSI WWP, 6" | 1.00 | EA |
1.00
| 0.00 | 1.00 | $7,500.00 | $7,500.00 |
| 22 | INTERCONNECTION TO EXISTING WATERMAIN | 3.00 | EA |
3.00
| 1.00 | 2.00 | $10,000.00 | $20,000.00 |
| 24 | VIDEO INSPECTION | 1.00 | LS |
1.00
| 0.50 | 0.50 | $2,500.00 | $1,250.00 |
| 26 | 0.5 MG WATER STORAGE TANK AND APPURTENANCES | 1.00 | LS |
0.99
| 0.965 | 0.025 | $2,400,000.00 | $60,000.00 |
| 29 | CATHODIC PROTECTION SYSTEM (TANK) | 1.00 | LS |
1.00
| 0.50 | 0.50 | $30,000.00 | $15,000.00 |
| 30 | CONCRETE PAD (SURGE TANKS) | 17.00 | CY |
8.50
| 4.25 | 4.25 | $2,000.00 | $8,500.00 |
| 35 | PCC HEADER, 6"X12" | 890.00 | LF |
223.00
| 0.00 | 223.00 | $50.00 | $11,150.00 |
| 36 | CONCRETE PAVING (PCC) 4" THICK | 305.00 | SF |
226.50
| 152.50 | 74.00 | $50.00 | $3,700.00 |
| 38 | ELECTRICAL WORK | 1.00 | LS |
0.41
| 0.055 | 0.355 | $550,000.00 | $195,250.00 |
| 39 | TRAFFIC CONTROL | 1.00 | LS |
1.00
| 0.95 | 0.05 | $25,000.00 | $1,250.00 |
| 40 | CONST & REMOVE TEMP CHAIN LINK FENCE | 275.00 | LF |
275.00
| 137.50 | 137.50 | $50.00 | $6,875.00 |
| S-5 | BLOWER UPGRADE | | LS |
0.85
| 0.65 | 0.20 | $37,000.00 | $7,400.00 |
| S-9 | SURGE TANK CONNECTION RE-DESIGN | | LS |
1.00
| 0.00 | 1.00 | $70,000.00 | $70,000.00 |
| S-13 | INSTALL GASKETS | | LS |
1.00
| 0.00 | 1.00 | $695.17 | $695.17 |
|