Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 8.00 | MTH |
6.00
| 5.00 | 1.00 | $500.00 | $500.00 |
5 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.60
| 0.50 | 0.10 | $23,000.00 | $2,300.00 |
6 | OFFICE FACILITIES | 9.00 | MTH |
6.00
| 5.00 | 1.00 | $2,600.00 | $2,600.00 |
15 | CONCRETE REMOVAL (NON-REINFORCED) | 3,146.00 | CY |
1,664.01
| 1,276.98 | 387.03 | $200.00 | $77,406.00 |
17 | UNCLASSIFIED EXCAVATION | 4,651.00 | CY |
2,597.74
| 2,111.73 | 486.01 | $135.00 | $65,611.35 |
18 | CRUSHED MISCELLANEOUS BASE | 4,751.00 | CY |
2,246.89
| 1,840.75 | 406.14 | $120.00 | $48,736.80 |
22 | AC PAVEMENT | 643.00 | TON |
437.51
| 384.00 | 53.51 | $110.00 | $5,886.10 |
23 | AC PAVEMENT(PATCH BACK) | 1,008.00 | TON |
205.80
| 167.52 | 38.28 | $200.00 | $7,656.00 |
34 | CURB DRAIN PER STD PLAN 150, N=1, CASE 3 INLET | 16.00 | EA |
16.00
| 9.00 | 7.00 | $500.00 | $3,500.00 |
39 | PCC CURB & GUTTER, TYPE A2-6 | 469.00 | LF |
20.50
| 0.00 | 20.50 | $47.00 | $963.50 |
40 | PCC CURB & GUTTER, TYPE A2-8 | 2,158.00 | LF |
2,498.00
| 1,898.75 | 599.25 | $48.00 | $28,764.00 |
41 | PCC CURB & GUTTER, TYPE A2-VAR | 3,744.00 | LF |
1,448.57
| 982.75 | 465.82 | $49.00 | $22,825.18 |
43 | RECONSTRUCT LOCAL DEPRESSION PER STD PLAN 313-3 CASE E | 3.00 | EA |
2.00
| 1.00 | 1.00 | $3,000.00 | $3,000.00 |
44 | PCC WALK, 4" THICK | 40,585.00 | SF |
24,365.21
| 18,559.83 | 5,805.38 | $10.00 | $58,053.80 |
45 | PCC CURB RAMPS | 461.00 | CY |
274.35
| 206.78 | 67.57 | $1,200.00 | $81,084.00 |
46 | PCC DRIVEWAYS, 6" THICK | 1,697.00 | SF |
1,647.55
| 1,524.50 | 123.05 | $13.00 | $1,599.65 |
47 | DETECTABLE WARNING SURFACE | 3,742.00 | SF |
1,540.43
| 1,159.50 | 380.93 | $40.00 | $15,237.20 |
49 | CROSS GUTTER (MOD) | 143.00 | CY |
66.57
| 43.49 | 23.08 | $700.00 | $16,156.00 |
55 | ADJUST PULL BOX | 113.00 | EA |
53.00
| 40.00 | 13.00 | $500.00 | $6,500.00 |
93 | TRAFFIC CONTROL | 1.00 | LS |
0.60
| 0.50 | 0.10 | $211,000.00 | $21,100.00 |
S-3 | TRAFFIC SIGNAL COMPONENTS | | T&M |
498,484.14
| 495,380.20 | 3,103.94 | $1.00 | $3,103.94 |
|