| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.44
| 0.33 | 0.11 | $6,000.00 | $660.00 |
| 6 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.44
| 0.33 | 0.11 | $32,000.00 | $3,520.00 |
| 7 | OFFICE FACILITIES | 9.00 | MTH |
4.50
| 3.50 | 1.00 | $3,000.00 | $3,000.00 |
| 15 | CONCRETE REMOVAL (NON-REINFORCED) | 574.00 | CY |
475.00
| 323.25 | 151.75 | $300.00 | $45,525.00 |
| 16 | UNCLASSIFIED EXCAVATION | 825.00 | CY |
891.00
| 742.75 | 148.25 | $240.00 | $35,580.00 |
| 18 | CRUSHED MISCELLANEOUS BASE | 874.00 | CY |
704.75
| 573.10 | 131.65 | $200.00 | $26,330.00 |
| 24 | TEMPORARY AC PAVEMENT (PATCH BACK) | 241.00 | TON |
102.42
| 90.59 | 11.83 | $230.00 | $2,720.90 |
| 27 | PCC PAVEMENT | 213.00 | CY |
234.55
| 146.00 | 88.55 | $600.00 | $53,130.00 |
| 36 | LOCAL DEPRESSION PER STD PLAN 313, CASE E | 1.00 | EA |
1.00
| 0.00 | 1.00 | $2,800.00 | $2,800.00 |
| 37 | PCC CURB & GUTTER, TYPE A2-6 | 617.00 | LF |
630.00
| 601.50 | 28.50 | $72.00 | $2,052.00 |
| 38 | PCC CURB & GUTTER, TYPE A2-8 | 25.00 | LF |
25.00
| 0.00 | 25.00 | $72.00 | $1,800.00 |
| 39 | PCC CURB & GUTTER, TYPE A2-VAR | 1,639.00 | LF |
1,369.75
| 1,296.50 | 73.25 | $72.00 | $5,274.00 |
| 41 | PCC WALK & DRIVEWAYS, 4" THICK | 16,152.00 | SF |
12,362.80
| 11,223.35 | 1,139.45 | $15.00 | $17,091.75 |
| 42 | PCC CURB RAMPS | 98.00 | CY |
73.10
| 62.85 | 10.25 | $1,800.00 | $18,450.00 |
| 43 | PCC DRIVEWAYS, 6" THICK | 148.00 | SF |
333.00
| 148.00 | 185.00 | $19.00 | $3,515.00 |
| 44 | DETECTABLE WARNING SURFACE | 1,050.00 | SF |
843.00
| 663.00 | 180.00 | $56.00 | $10,080.00 |
| 45 | CROSS GUTTER | 41.00 | CY |
59.05
| 29.05 | 30.00 | $850.00 | $25,500.00 |
| 49 | TRAFFIC CONTROL | 1.00 | LS |
0.56
| 0.52 | 0.04 | $473,000.00 | $18,920.00 |
|