| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 3.00 | MTH |
3.00
| 3.00 | 0.00 | $1,500.00 | $0.00 |
| 3 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
1.00
| 1.00 | 0.00 | $15,000.00 | $0.00 |
| 5 | PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $5,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 6 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
1.00
| 1.00 | 0.00 | $25,000.00 | $0.00 |
| 7 | PREPARATION OF THE DIVERSION OF WATER PLAN (STIPULATED UNIT PRICE OF $5,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 8 | IMPLEMENTATION OF THE DIVERSION OF WATER PLAN | 1.00 | LS |
1.00
| 1.00 | 0.00 | $75,000.00 | $0.00 |
| 9 | SHORING OF OPEN EXCAVATIONS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $284,711.00 | $0.00 |
| 10 | OFFICE FACILITIES | 4.00 | MTH |
4.00
| 4.00 | 0.00 | $3,000.00 | $0.00 |
| 11 | MOBILIZATION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $270,000.00 | $0.00 |
| 12 | CLEARING AND GRUBBING | 1.00 | LS |
1.00
| 1.00 | 0.00 | $74,500.00 | $0.00 |
| 13 | TREE REMOVAL (13"-24" DIAMETER) | 1.00 | EA |
1.00
| 1.00 | 0.00 | $4,000.00 | $0.00 |
| 14 | TREE REMOVAL (25"+ DIAMETER) | 1.00 | EA |
2.00
| 2.00 | 0.00 | $8,000.00 | $0.00 |
| 15 | REMOVE EXISTING CHAIN LINK FENCE | 1,730.00 | LF |
1,590.00
| 1,590.00 | 0.00 | $15.00 | $0.00 |
| 16 | REMOVE AND DISPOSE CHAIN LINK GATE | 2.00 | EA |
2.00
| 2.00 | 0.00 | $900.00 | $0.00 |
| 17 | CONCRETE REMOVAL (NON-REINFORCED) | 96.00 | CY |
142.00
| 142.00 | 0.00 | $125.00 | $0.00 |
| 18 | CONCRETE REMOVAL (REINFORCED) | 1.00 | CY |
11.00
| 11.00 | 0.00 | $1,500.00 | $0.00 |
| 19 | REMOVE AND DISPOSE BOLLARD | 1.00 | EA |
1.00
| 1.00 | 0.00 | $250.00 | $0.00 |
| 20 | REMOVE 18 " CSP | 58.00 | LF |
58.00
| 58.00 | 0.00 | $50.00 | $0.00 |
| 21 | UNCLASSIFIED EXCAVATION | 1,881.00 | CY |
1,881.00
| 1,881.00 | 0.00 | $160.00 | $0.00 |
| 22 | STRUCTURE EXCAVATION (RETAINING WALL) | 1,706.00 | CY |
1,706.00
| 1,706.00 | 0.00 | $85.00 | $0.00 |
| 23 | STRUCTURE BACKFILL (RETAINING WALL) | 1,457.00 | CY |
1,457.00
| 1,457.00 | 0.00 | $75.00 | $0.00 |
| 24 | CRUSHED MISCELLANEOUS BASE | 135.00 | CY |
135.00
| 135.00 | 0.00 | $160.00 | $0.00 |
| 25 | COLD MILL AC PAVEMENT (0 - 1-1/2") | 13,133.00 | SF |
13,133.00
| 13,133.00 | 0.00 | $2.00 | $0.00 |
| 26 | AC CURB, TYPE D1-8 | 58.00 | LF |
58.00
| 58.00 | 0.00 | $60.00 | $0.00 |
| 27 | AC CURB, TYPE D1-VAR | 28.00 | LF |
28.00
| 28.00 | 0.00 | $60.00 | $0.00 |
| 28 | AC PAVEMENT | 1,175.00 | TON |
1,265.00
| 1,265.00 | 0.00 | $150.00 | $0.00 |
| 29 | AC PAVEMENT(PATCH BACK) | 69.00 | TON |
69.00
| 69.00 | 0.00 | $350.00 | $0.00 |
| 30 | AC PAVEMENT(DRIVEWAYS) | 24.00 | TON |
24.00
| 24.00 | 0.00 | $400.00 | $0.00 |
| 31 | PCC PAVEMENT | 20.00 | CY |
36.00
| 36.00 | 0.00 | $650.00 | $0.00 |
| 32 | REINFORCED CONCRETE RETAINING WALL TYPE 6 - CALTRANS | 294.00 | CY |
296.00
| 296.00 | 0.00 | $1,450.00 | $0.00 |
| 33 | PCC CURB, TYPE A1-6 | 35.00 | LF |
35.00
| 35.00 | 0.00 | $130.00 | $0.00 |
| 34 | PCC CURB, TYPE A1-8 | 3,076.00 | LF |
3,467.00
| 3,467.00 | 0.00 | $25.00 | $0.00 |
| 35 | PCC CURB, TYPE A1-MOD | 2,247.00 | LF |
2,247.00
| 2,247.00 | 0.00 | $17.00 | $0.00 |
| 36 | PCC WALK, 4" THICK | 919.00 | SF |
919.00
| 919.00 | 0.00 | $9.00 | $0.00 |
| 37 | PCC CURB RAMPS | 7.00 | CY |
7.00
| 7.00 | 0.00 | $2,200.00 | $0.00 |
| 38 | CASE CM CURB RAMP | 1.00 | EA |
1.00
| 1.00 | 0.00 | $5,500.00 | $0.00 |
| 39 | DETECTABLE WARNING SURFACE | 140.00 | SF |
140.00
| 140.00 | 0.00 | $40.00 | $0.00 |
| 40 | METAL HAND RAILINGS PER STD PLAN 606 | 169.00 | LF |
170.00
| 170.00 | 0.00 | $175.00 | $0.00 |
| 41 | CHAIN LINK FENCE, 5' HIGH | 1,284.00 | LF |
1,284.00
| 1,284.00 | 0.00 | $50.00 | $0.00 |
| 42 | CHAIN LINK FENCE, 5' HIGH ON TOP OF WALL | 456.00 | LF |
556.00
| 556.00 | 0.00 | $50.00 | $0.00 |
| 43 | ROLLING CHAIN LINK GATE | 2.00 | EA |
2.00
| 2.00 | 0.00 | $10,000.00 | $0.00 |
| 44 | TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE | 9,370.00 | LB |
9,370.00
| 9,370.00 | 0.00 | $1.00 | $0.00 |
| 45 | 18" RCP, 2500 D | 65.00 | LF |
65.00
| 65.00 | 0.00 | $300.00 | $0.00 |
| 46 | FILTRATION TRENCH | 1,856.00 | LF |
2,247.00
| 2,247.00 | 0.00 | $78.00 | $0.00 |
| 47 | INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT | 1,239.00 | LF |
1,239.00
| 1,239.00 | 0.00 | $15.00 | $0.00 |
| 48 | DETAIL 1 (MODIFIED) (THERMOPLASTIC) | 3,180.00 | LF |
3,197.00
| 3,197.00 | 0.00 | $1.00 | $0.00 |
| 49 | DETAIL 9 (THERMOPLASTIC) | 880.00 | LF |
496.00
| 496.00 | 0.00 | $0.80 | $0.00 |
| 50 | DETAIL 27 (THERMOPLASTIC) | 645.00 | LF |
655.00
| 655.00 | 0.00 | $1.50 | $0.00 |
| 51 | DETAIL 27B (THERMOPLASTIC) | 7,100.00 | LF |
10,127.00
| 10,127.00 | 0.00 | $1.00 | $0.00 |
| 52 | DETAIL 38 (THERMOPLASTIC) | 350.00 | LF |
354.00
| 354.00 | 0.00 | $1.30 | $0.00 |
| 53 | PAVEMENT MARKINGS (THERMOPLASTIC) | 177.00 | SF |
45.00
| 45.00 | 0.00 | $9.00 | $0.00 |
| 54 | 4" STRIPING (THERMOPLASTIC) | 105.00 | LF |
0.00
| 0.00 | 0.00 | $0.60 | $0.00 |
| 55 | 8" STRIPING (THERMOPLASTIC) | 635.00 | LF |
622.00
| 622.00 | 0.00 | $1.20 | $0.00 |
| 56 | 12" STRIPING (THERMOPLASTIC) | 200.00 | LF |
192.00
| 192.00 | 0.00 | $4.00 | $0.00 |
| 57 | 24" STRIPING (THERMOPLASTIC) | 1,320.00 | LF |
1,205.00
| 1,205.00 | 0.00 | $8.00 | $0.00 |
| 58 | CURB MARKINGS (ONE-COAT PAINT) | 130.00 | LF |
140.00
| 140.00 | 0.00 | $4.50 | $0.00 |
| 59 | REMOVE PAVEMENT MARKINGS (THERMOPLASTIC) | 45.00 | SF |
45.00
| 45.00 | 0.00 | $2.20 | $0.00 |
| 60 | REMOVE STRIPING (THERMOPLASTIC) | 4,401.00 | LF |
2,156.00
| 2,156.00 | 0.00 | $1.50 | $0.00 |
| 61 | SIGN PANEL | 23.00 | EA |
28.00
| 28.00 | 0.00 | $120.00 | $0.00 |
| 62 | RELOCATE SIGN | 10.00 | EA |
9.00
| 9.00 | 0.00 | $100.00 | $0.00 |
| 63 | REMOVE SIGN | 4.00 | EA |
2.00
| 2.00 | 0.00 | $60.00 | $0.00 |
| 64 | RELOCATE SIGN POST | 9.00 | EA |
9.00
| 9.00 | 0.00 | $220.00 | $0.00 |
| 65 | SIGN POST (ROADSIDE SIGN) | 9.00 | EA |
9.00
| 9.00 | 0.00 | $350.00 | $0.00 |
| 66 | TRAFFIC CONTROL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $75,000.00 | $0.00 |
| 67 | NON-SLIP MATERIAL ON METAL VAULT COVER | 3.00 | EA |
3.00
| 3.00 | 0.00 | $3,500.00 | $0.00 |
| S-1 | EXTENSION OF TIME, PART 1 NTP | | DAYS |
15.00
| 15.00 | 0.00 | $0.00 | $0.00 |
| S-2 | ADD ADDITIONAL REBARS | | LS |
1.00
| 1.00 | 0.00 | $4,000.00 | $0.00 |
| S-4 | CURB MODIFICATIONS | | LS |
1.00
| 1.00 | 0.00 | $31,635.00 | $0.00 |
| S-5 | CABLE RAILING AND BOLLARDS | | LS |
1.00
| 1.00 | 0.00 | $28,700.00 | $0.00 |
|