Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
5 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.92
| 0.90 | 0.02 | $23,000.00 | $460.00 |
15 | CONCRETE REMOVAL (NON-REINFORCED) | 3,146.00 | CY |
2,518.00
| 2,407.78 | 110.22 | $200.00 | $22,044.00 |
16 | CONCRETE REMOVAL (REINFORCED) | 8.00 | CY |
8.00
| 0.00 | 8.00 | $400.00 | $3,200.00 |
17 | UNCLASSIFIED EXCAVATION | 4,651.00 | CY |
4,260.30
| 4,093.58 | 166.72 | $135.00 | $22,507.20 |
18 | CRUSHED MISCELLANEOUS BASE | 4,751.00 | CY |
3,981.00
| 3,887.49 | 93.51 | $120.00 | $11,221.20 |
23 | AC PAVEMENT(PATCH BACK) | 1,008.00 | TON |
462.89
| 444.18 | 18.71 | $200.00 | $3,742.00 |
27 | PCC PAVEMENT | 310.00 | CY |
310.00
| 242.48 | 67.52 | $600.00 | $40,512.00 |
28 | PCC CROSSWALK PER DETAIL G, SHEET 11 | 8.00 | CY |
8.00
| 4.00 | 4.00 | $1,200.00 | $4,800.00 |
32 | 7/8" NOMINAL BEDDING SAND | 56.00 | SF |
56.00
| 0.00 | 56.00 | $5.00 | $280.00 |
33 | 4" CONCRETE BASE UNDER PAVERS | 60.00 | SF |
60.00
| 0.00 | 60.00 | $14.00 | $840.00 |
37 | PCC CURB, TYPE A1-8 | 437.00 | LF |
437.00
| 0.00 | 437.00 | $36.00 | $15,732.00 |
39 | PCC CURB & GUTTER, TYPE A2-6 | 469.00 | LF |
469.00
| 96.90 | 372.10 | $47.00 | $17,488.70 |
41 | PCC CURB & GUTTER, TYPE A2-VAR | 3,744.00 | LF |
3,744.00
| 3,214.99 | 529.01 | $49.00 | $25,921.49 |
44 | PCC WALK, 4" THICK | 40,585.00 | SF |
40,481.60
| 39,898.00 | 583.60 | $10.00 | $5,836.00 |
45 | PCC CURB RAMPS | 461.00 | CY |
458.63
| 451.95 | 6.68 | $1,200.00 | $8,016.00 |
47 | DETECTABLE WARNING SURFACE | 3,742.00 | SF |
2,784.96
| 2,754.96 | 30.00 | $40.00 | $1,200.00 |
93 | TRAFFIC CONTROL | 1.00 | LS |
0.92
| 0.90 | 0.02 | $211,000.00 | $4,220.00 |
|