Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 5.00 | MTH |
3.00
| 2.00 | 1.00 | $500.00 | $500.00 |
5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
0.80
| 0.70 | 0.10 | $23,000.00 | $2,300.00 |
10 | UNCLASSIFIED EXCAVATION | 532.00 | CY |
532.00
| 401.10 | 130.90 | $350.00 | $45,815.00 |
11 | CRUSHED MISCELLANEOUS BASE | 482.00 | CY |
482.00
| 476.72 | 5.28 | $219.00 | $1,156.32 |
12 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) | 23.00 | CY |
23.00
| 13.78 | 9.22 | $200.00 | $1,844.00 |
15 | GRIND PCC WALK | 27.00 | SF |
15.00
| 0.00 | 15.00 | $124.00 | $1,860.00 |
16 | AC PAVEMENT | 140.00 | TON |
140.00
| 120.16 | 19.84 | $380.00 | $7,539.20 |
17 | AC PAVEMENT(PATCH BACK) | 38.00 | TON |
38.00
| 35.64 | 2.36 | $295.00 | $696.20 |
25 | PCC CURB, TYPE A1-VAR | 154.00 | LF |
154.00
| 70.42 | 83.58 | $58.00 | $4,847.64 |
26 | PCC CURB & GUTTER, TYPE A2-6 | 40.00 | LF |
40.00
| 0.00 | 40.00 | $96.00 | $3,840.00 |
28 | PCC CURB & GUTTER, TYPE A2-VAR | 586.00 | LF |
586.00
| 554.83 | 31.17 | $96.00 | $2,992.32 |
29 | PCC WALK, 4" THICK | 2,286.00 | SF |
2,286.00
| 1,650.27 | 635.73 | $15.00 | $9,535.95 |
30 | PCC CURB RAMPS | 38.00 | CY |
38.00
| 20.83 | 17.17 | $1,400.00 | $24,038.00 |
32 | DETECTABLE WARNING SURFACE | 313.00 | SF |
313.00
| 149.00 | 164.00 | $63.00 | $10,332.00 |
34 | REMOVE EXISTING CONCRETE CULVERTS PER PLAN SHEET 3 & 4 | 1.00 | LS |
1.00
| 0.50 | 0.50 | $5,000.00 | $2,500.00 |
35 | RECONSTRUCT CULVERT INLET PER DETAIL ON SHEET 3 | 1.00 | EA |
1.00
| 0.00 | 1.00 | $6,300.00 | $6,300.00 |
37 | FURNISH AND INSTALL CATCH BASIN GRATE PER CALTRANS STD PLAN D77B, TYPE 18-9X GRATE | 5.00 | EA |
4.00
| 0.00 | 4.00 | $1,600.00 | $6,400.00 |
41 | COMPOSITE TYPE 2 PULL BOX INCL COVER | 1.00 | EA |
1.00
| 0.00 | 1.00 | $1,600.00 | $1,600.00 |
42 | COMPOSITE TYPE 3 PULL BOX INCL COVER | 14.00 | EA |
14.00
| 8.00 | 6.00 | $1,500.00 | $9,000.00 |
46 | REMOVE PULL BOX AND RESURFACE SIDEWALK | 16.00 | EA |
16.00
| 0.00 | 16.00 | $300.00 | $4,800.00 |
51 | REMOVE PEDESTRIAN PUSH BUTTON | 1.00 | EA |
1.00
| 0.00 | 1.00 | $120.00 | $120.00 |
67 | PEDESTRIAN PUSH BUTTON | 4.00 | EA |
5.00
| 2.00 | 3.00 | $400.00 | $1,200.00 |
68 | PEDESTRIAN PUSH BUTTON POST | 1.00 | EA |
1.00
| 0.00 | 1.00 | $1,200.00 | $1,200.00 |
69 | PEDESTRIAN PUSH BUTTON POST FOUNDATION | 1.00 | EA |
1.00
| 0.00 | 1.00 | $1,600.00 | $1,600.00 |
96 | TRAFFIC CONTROL | 1.00 | LS |
0.90
| 0.80 | 0.10 | $562,000.00 | $56,200.00 |
|