| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.20
| 0.00 | 0.20 | $10,000.00 | $2,000.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
0.20
| 0.00 | 0.20 | $50,000.00 | $10,000.00 |
| 6 | PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $10000) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $10,000.00 | $10,000.00 |
| 7 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
0.20
| 0.00 | 0.20 | $20,000.00 | $4,000.00 |
| 8 | PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $5000) | 1.00 | LS |
0.50
| 0.00 | 0.50 | $5,000.00 | $2,500.00 |
| 10 | MOBILIZATION | 1.00 | LS |
0.50
| 0.00 | 0.50 | $750,000.00 | $375,000.00 |
| 11 | PREPARATION OF THE SPILL PREVENTION AND CONTROL PLAN (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $2,500.00 | $2,500.00 |
| 12 | DISPOSAL OF LBP/LCP WASTE | 1.00 | LS |
0.20
| 0.00 | 0.20 | $50,000.00 | $10,000.00 |
| 13 | DEWATERING AND BYPASS (WITHIN INLET AND OUTLET WORKS AREA) | 1.00 | LS |
0.10
| 0.00 | 0.10 | $75,000.00 | $7,500.00 |
| 14 | BV STEEL DISK AND BODY REFURBISHMENT - BUTTERFLY VALVE NO. 1 (ABRASIVELY BLAST, CAVITATION FILLING, COATING) | 1.00 | EA |
0.20
| 0.00 | 0.20 | $75,000.00 | $15,000.00 |
| 17 | BV DISC SEAT AND CLAMP RING ASSEMBLY REPLACEMENT - BUTTERFLY VALVE NO. 1 (DISASSEMBLY, FABRICATION, RE-ASSEMBLY) | 1.00 | EA |
0.10
| 0.00 | 0.10 | $520,000.00 | $52,000.00 |
| 18 | BV DISC SEAT AND CLAMP RING ASSEMBLY REPLACEMENT - BUTTERFLY VALVE NO. 2 (DISASSEMBLY, FABRICATION, RE-ASSEMBLY) | 1.00 | EA |
0.10
| 0.00 | 0.10 | $550,000.00 | $55,000.00 |
| 21 | SLUICE GATE REFURBISHMENT (REMOVE, ABRASIVELY BLAST, CAVITATION FILLING, COATING, REINSTALL) | 1.00 | EA |
0.20
| 0.00 | 0.20 | $500,000.00 | $100,000.00 |
| 22 | STEEL LINER REHABILITATION - BUTTERFLY VALVE NO. 1 (ABRASIVELY BLAST, CAVITATION FILLING, COATING) | 1.00 | EA |
0.20
| 0.00 | 0.20 | $125,000.00 | $25,000.00 |
| 23 | STEEL LINER REHABILITATION - BUTTERFLY VALVE NO. 2 (ABRASIVELY BLAST, CAVITATION FILLING, COATING) | 1.00 | EA |
0.05
| 0.00 | 0.05 | $150,000.00 | $7,500.00 |
| 27 | TRASH RACK ABRASIVE BLASTING / RECOATING - OUTLET STRUCTURE 1 | 5,100.00 | SF |
255.00
| 0.00 | 255.00 | $250.00 | $63,750.00 |
| 28 | TRASH RACK ABRASIVE BLASTING / RECOATING - OUTLET STRUCTURE 2 | 1.00 | EA |
0.05
| 0.00 | 0.05 | $150,000.00 | $7,500.00 |
| 33 | HYDRAULIC CYLINDER REFURBISHMENT - BUTTERFLY VALVE NO. 2 (DISASSEMBLY, REFURBISHMENT, RE-ASSEMBLY) | 1.00 | EA |
0.10
| 0.00 | 0.10 | $200,000.00 | $20,000.00 |
| 35 | HYDRAULIC CYLINDER REFURBISHMENT - SLUICE GATE (DISASSEMBLY, REFURBISHMENT, RE-ASSEMBLY) | 1.00 | EA |
0.10
| 0.00 | 0.10 | $200,000.00 | $20,000.00 |
|