Los Angeles County Public Works
Project Management Division III
Progress Payment 1
Project Name: Cogswell Dam Inlet - Outlet Works Rehabilitation Project Phase 2
Contractor: Kiewit Infrastructure West Company
10704 Shoemaker Avenue
Santa Fe Springs, CA 90670-4024
Project ID: FCC0001313
Federal Number(s): None
Original Contract: $7,493,500.00
Awarded: 5/7/2024
Period Ending: 8/5/2024
Board Accepted: 8/19/2025
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
4IMPLEMENTATION OF THE LTWHP1.00LS 0.20 0.000.20$10,000.00$2,000.00
5IMPLEMENTATION OF BMPS1.00LS 0.20 0.000.20$50,000.00$10,000.00
6PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $10000)1.00LS 1.00 0.001.00$10,000.00$10,000.00
7IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN 1.00LS 0.20 0.000.20$20,000.00$4,000.00
8PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $5000)1.00LS 0.50 0.000.50$5,000.00$2,500.00
10MOBILIZATION1.00LS 0.50 0.000.50$750,000.00$375,000.00
11PREPARATION OF THE SPILL PREVENTION AND CONTROL PLAN (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 0.001.00$2,500.00$2,500.00
12DISPOSAL OF LBP/LCP WASTE1.00LS 0.20 0.000.20$50,000.00$10,000.00
13DEWATERING AND BYPASS (WITHIN INLET AND OUTLET WORKS AREA)1.00LS 0.10 0.000.10$75,000.00$7,500.00
14BV STEEL DISK AND BODY REFURBISHMENT - BUTTERFLY VALVE NO. 1 (ABRASIVELY BLAST, CAVITATION FILLING, COATING)1.00EA 0.20 0.000.20$75,000.00$15,000.00
17BV DISC SEAT AND CLAMP RING ASSEMBLY REPLACEMENT - BUTTERFLY VALVE NO. 1 (DISASSEMBLY, FABRICATION, RE-ASSEMBLY)1.00EA 0.10 0.000.10$520,000.00$52,000.00
18BV DISC SEAT AND CLAMP RING ASSEMBLY REPLACEMENT - BUTTERFLY VALVE NO. 2 (DISASSEMBLY, FABRICATION, RE-ASSEMBLY)1.00EA 0.10 0.000.10$550,000.00$55,000.00
21SLUICE GATE REFURBISHMENT (REMOVE, ABRASIVELY BLAST, CAVITATION FILLING, COATING, REINSTALL)1.00EA 0.20 0.000.20$500,000.00$100,000.00
22STEEL LINER REHABILITATION - BUTTERFLY VALVE NO. 1 (ABRASIVELY BLAST, CAVITATION FILLING, COATING)1.00EA 0.20 0.000.20$125,000.00$25,000.00
23STEEL LINER REHABILITATION - BUTTERFLY VALVE NO. 2 (ABRASIVELY BLAST, CAVITATION FILLING, COATING)1.00EA 0.05 0.000.05$150,000.00$7,500.00
27TRASH RACK ABRASIVE BLASTING / RECOATING - OUTLET STRUCTURE 15,100.00SF 255.00 0.00255.00$250.00$63,750.00
28TRASH RACK ABRASIVE BLASTING / RECOATING - OUTLET STRUCTURE 21.00EA 0.05 0.000.05$150,000.00$7,500.00
33HYDRAULIC CYLINDER REFURBISHMENT - BUTTERFLY VALVE NO. 2 (DISASSEMBLY, REFURBISHMENT, RE-ASSEMBLY)1.00EA 0.10 0.000.10$200,000.00$20,000.00
35HYDRAULIC CYLINDER REFURBISHMENT - SLUICE GATE (DISASSEMBLY, REFURBISHMENT, RE-ASSEMBLY)1.00EA 0.10 0.000.10$200,000.00$20,000.00

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $789,250.00 $0.00 $789,250.00
Retained $39,462.50 $0.00 $39,462.50
Deducted $0.00 $0.00 $0.00
Due $749,787.50 $0.00 $749,787.50