| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 11.00 | MTH |
4.00
| 3.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.32
| 0.24 | 0.08 | $20,000.00 | $1,600.00 |
| 7 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.32
| 0.24 | 0.08 | $40,000.00 | $3,200.00 |
| 9 | OFFICE FACILITIES | 12.00 | MTH |
4.00
| 3.00 | 1.00 | $7,500.00 | $7,500.00 |
| 10 | MOBILIZATION | 1.00 | LS |
1.00
| 0.75 | 0.25 | $554,000.00 | $138,500.00 |
| 14 | UNCLASSIFIED EXCAVATION (ROADWAY) | 2,063.00 | CY |
765.11
| 241.60 | 523.51 | $170.00 | $88,996.70 |
| 16 | PULVERIZED BASE MATERIAL, 6" THICK | 51,273.00 | SY |
16,273.44
| 6,823.22 | 9,450.22 | $2.00 | $18,900.44 |
| 19 | COLD MILL AC PAVEMENT (> 3") | 461,406.00 | SF |
210,072.00
| 61,408.00 | 148,664.00 | $0.60 | $89,198.40 |
| 20 | AC PAVEMENT | 8,700.00 | TON |
3,129.00
| 1,234.13 | 1,894.87 | $110.00 | $208,435.70 |
| 22 | AC PAVEMENT(PATCH BACK) | 10.00 | TON |
10.00
| 0.00 | 10.00 | $400.00 | $4,000.00 |
| 24 | RECONSTRUCT MANHOLE (SEWER) | 19.00 | EA |
3.00
| 0.00 | 3.00 | $2,500.00 | $7,500.00 |
| 25 | RECONSTRUCT MANHOLE (STORM DRAIN) | 13.00 | EA |
3.00
| 0.00 | 3.00 | $7,000.00 | $21,000.00 |
| 26 | DOUBLE ADJUST WATER VALVE FRAME AND COVER PER DETAIL A ON SHEET 3 | 35.00 | EA |
16.00
| 0.00 | 16.00 | $1,150.00 | $18,400.00 |
| 27 | PCC PAVEMENT | 161.00 | CY |
73.00
| 43.00 | 30.00 | $480.00 | $14,400.00 |
| 28 | ASPHALT RUBBER HOT MIX | 3,887.00 | TON |
611.07
| 0.00 | 611.07 | $140.00 | $85,549.80 |
| 29 | ASPHALT RUBBER HOT MIX (TEST STRIP) | 500.00 | TON |
500.00
| 0.00 | 500.00 | $155.00 | $77,500.00 |
| 32 | CONNECTOR PIPE SCREEN (CPS) | 1.00 | EA |
1.00
| 0.00 | 1.00 | $2,300.00 | $2,300.00 |
| 33 | AUTOMATIC RETRACTABLE SCREEN (ARS) | 1.00 | EA |
1.00
| 0.00 | 1.00 | $3,900.00 | $3,900.00 |
| 39 | CURB DRAIN PER STD PLAN 150, N=1, CASE 2 INLET | 4.00 | EA |
4.00
| 3.00 | 1.00 | $2,500.00 | $2,500.00 |
| 47 | PCC WALK & DRIVEWAYS, 4" THICK | 7,714.00 | SF |
7,258.00
| 5,919.00 | 1,339.00 | $11.00 | $14,729.00 |
| 49 | PCC WALK & DRIVEWAYS, 6" THICK | 746.00 | SF |
728.00
| 38.00 | 690.00 | $24.00 | $16,560.00 |
| 51 | DETECTABLE WARNING SURFACE | 529.00 | SF |
361.00
| 99.00 | 262.00 | $60.00 | $15,720.00 |
| 57 | 1-1/2" CONDUIT (SCH 80 PVC) | 15.00 | LF |
15.00
| 0.00 | 15.00 | $65.00 | $975.00 |
| 58 | 2" CONDUIT (SCH 80 PVC) | 255.00 | LF |
255.00
| 135.00 | 120.00 | $85.00 | $10,200.00 |
| 59 | 3" CONDUIT (SCH 80 PVC) | 805.00 | LF |
805.00
| 792.00 | 13.00 | $85.00 | $1,105.00 |
| 60 | 12-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) | 1,720.00 | LF |
1,720.00
| 894.00 | 826.00 | $9.00 | $7,434.00 |
| 61 | 3-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) | 1,435.00 | LF |
1,435.00
| 634.00 | 801.00 | $4.30 | $3,444.30 |
| 63 | NO. 5 PULL BOX INCL PCC COVER | 1.00 | EA |
1.00
| 0.00 | 1.00 | $1,200.00 | $1,200.00 |
| 65 | COMPOSITE TYPE 3 PULL BOX INCL COVER | 15.00 | EA |
15.00
| 7.00 | 8.00 | $1,600.00 | $12,800.00 |
| 66 | NO. 6 PULL BOX INCL PCC COVER | 5.00 | EA |
5.00
| 0.00 | 5.00 | $1,450.00 | $7,250.00 |
| 67 | 4-CAMERA VIDEO DETECTION SYSTEM (COMPLETE) | 2.00 | EA |
1.00
| 0.00 | 1.00 | $60,000.00 | $60,000.00 |
| 70 | REMOVE PULL BOX AND RESURFACE SIDEWALK | 15.00 | EA |
15.00
| 0.00 | 15.00 | $1,300.00 | $19,500.00 |
| 71 | REMOVE PEDESTRIAN PUSH BUTTON POST AND FOUNDATION | 1.00 | EA |
1.00
| 0.00 | 1.00 | $1,100.00 | $1,100.00 |
| 72 | REMOVE TYPE 1 STANDARD (COMPLETE) (EXCL. FOUND.) | 2.00 | EA |
2.00
| 0.00 | 2.00 | $645.00 | $1,290.00 |
| 73 | REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.) | 4.00 | EA |
4.00
| 0.00 | 4.00 | $1,930.00 | $7,720.00 |
| 74 | REMOVE TYPE 17 STANDARD (COMPLETE) (EXCL. FOUND.) | 6.00 | EA |
6.00
| 0.00 | 6.00 | $1,930.00 | $11,580.00 |
| 75 | REMOVE SIGNAL 20' MAST ARM | 6.00 | EA |
6.00
| 0.00 | 6.00 | $430.00 | $2,580.00 |
| 76 | REMOVE 12' LUMINAIRE MAST ARM | 4.00 | EA |
4.00
| 0.00 | 4.00 | $430.00 | $1,720.00 |
| 77 | REMOVE 8' LUMINAIRE MAST ARM | 6.00 | EA |
6.00
| 0.00 | 6.00 | $430.00 | $2,580.00 |
| 78 | REMOVE VEHICLE HEAD (COMPLETE) | 20.00 | EA |
20.00
| 0.00 | 20.00 | $161.00 | $3,220.00 |
| 79 | REMOVE PEDESTRIAN HEAD (COMPLETE) | 12.00 | EA |
12.00
| 0.00 | 12.00 | $161.00 | $1,932.00 |
| 80 | REMOVE PEDESTRIAN PUSH BUTTON | 10.00 | EA |
10.00
| 0.00 | 10.00 | $161.00 | $1,610.00 |
| 81 | REMOVE RETROREFLECTIVE STREET NAME SIGN | 6.00 | EA |
6.00
| 0.00 | 6.00 | $215.00 | $1,290.00 |
| 82 | REMOVE TYPE 1 FOUNDATION | 2.00 | EA |
2.00
| 0.00 | 2.00 | $3,800.00 | $7,600.00 |
| 83 | REMOVE TYPE 15 FOUNDATION | 4.00 | EA |
4.00
| 0.00 | 4.00 | $5,200.00 | $20,800.00 |
| 89 | TYPE 2070 CONTROLLER | 2.00 | EA |
1.00
| 0.00 | 1.00 | $13,200.00 | $13,200.00 |
| 92 | TYPE 332 CABINET | 1.00 | EA |
0.50
| 0.00 | 0.50 | $25,000.00 | $12,500.00 |
| 114 | PEDESTRIAN PUSH BUTTON | 12.00 | EA |
11.00
| 6.00 | 5.00 | $400.00 | $2,000.00 |
| 118 | DETAIL 22 (THERMOPLASTIC) | 7,562.00 | LF |
2,331.00
| 0.00 | 2,331.00 | $1.65 | $3,846.15 |
| 121 | DETAIL 38 (THERMOPLASTIC) | 782.00 | LF |
100.00
| 0.00 | 100.00 | $3.75 | $375.00 |
| 125 | DETAIL 9 (THERMOPLASTIC) | 12,384.00 | LF |
2,824.00
| 0.00 | 2,824.00 | $1.00 | $2,824.00 |
| 128 | PAVEMENT MARKINGS (THERMOPLASTIC) | 4,996.00 | SF |
844.00
| 0.00 | 844.00 | $8.30 | $7,005.20 |
| 139 | TRAFFIC CONTROL | 1.00 | LS |
0.37
| 0.29 | 0.08 | $360,000.00 | $28,800.00 |
| S-13 | DRIVEWAY RECONSTRUCTION 1996 WASHINGTON BLVD | | LS |
1.00
| 0.00 | 1.00 | $19,582.00 | $19,582.00 |
| S-15 | RE-WORK NE RAMP ROOSEVELT AVE AND WASHINGTON BLVD | | T&M |
6,892.51
| 0.00 | 6,892.51 | $1.00 | $6,892.51 |
|