| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 4.00 | MTH |
4.00
| 3.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.87
| 0.75 | 0.12 | $15,000.00 | $1,800.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
0.87
| 0.75 | 0.12 | $45,000.00 | $5,400.00 |
| 8 | MAINTENANCE OF TEMPORARY SOUND BARRIER | 60.00 | LF |
60.00
| 45.00 | 15.00 | $30.00 | $450.00 |
| 11 | CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $25,000) | 25,000.00 | AL |
29,283.34
| 0.00 | 29,283.34 | $1.00 | $29,283.34 |
| 14 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
0.87
| 0.75 | 0.12 | $15,000.00 | $1,800.00 |
| 18 | IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN | 1.00 | LS |
0.87
| 0.75 | 0.12 | $6,000.00 | $720.00 |
| 21 | IMPLEMENTATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN | 1.00 | LS |
0.87
| 0.75 | 0.12 | $5,500.00 | $660.00 |
| 24 | OFFICE FACILITIES | 4.00 | MTH |
4.00
| 3.00 | 1.00 | $3,500.00 | $3,500.00 |
| 30 | STRUCTURE EXCAVATION | 54.00 | CY |
54.00
| 42.93 | 11.07 | $265.00 | $2,933.55 |
| 35 | DRILL AND BOND DOWEL (EPOXY CARTRIDGE) | 88.00 | LF |
53.33
| 41.65 | 11.68 | $150.00 | $1,752.00 |
| 36 | MASONRY GROUT | 1.00 | LS |
1.00
| 0.00 | 1.00 | $500.00 | $500.00 |
| 37 | STRUCTURAL STEEL | 13,588.00 | LB |
12,500.00
| 2,718.00 | 9,782.00 | $16.50 | $161,403.00 |
| 41 | DOORS, WINDOWS AND LOUVERS | 1.00 | LS |
0.86
| 0.00 | 0.86 | $114,955.00 | $98,861.30 |
| 47 | TEMPORARY BOATYARD | 1.00 | LS |
0.62
| 0.55 | 0.07 | $67,580.00 | $4,730.60 |
| 50 | STEEL PILES | 36,360.00 | LB |
36,360.00
| 0.00 | 36,360.00 | $4.50 | $163,620.00 |
| 51 | HDPE PIPES | 1.00 | LS |
0.37
| 0.28 | 0.09 | $248,271.00 | $22,344.39 |
| 57 | REFURBISH EXISTING LOUVERS AND ENCLOSURES | 1.00 | LS |
1.00
| 0.25 | 0.75 | $25,000.00 | $18,750.00 |
| 61 | PUMP STATION REMOVAL (PORTION) | 1.00 | LS |
1.00
| 0.75 | 0.25 | $43,000.00 | $10,750.00 |
| 62 | PUMP STATION FLOOR REMOVAL (PORTION) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $4,500.00 | $4,500.00 |
| 63 | ELECTRICAL WORK | 1.00 | LS |
0.32
| 0.13 | 0.19 | $527,783.00 | $100,278.77 |
| 64 | TRAFFIC CONTROL | 1.00 | LS |
0.75
| 0.50 | 0.25 | $196,500.00 | $49,125.00 |
| S-1 | POWDER-COATED FINISH FOR ROLL-UP DOORS | | LS |
1.00
| 0.00 | 1.00 | $3,616.59 | $3,616.59 |
| S-6 | LIFEGUARD TOWER FOUNDATION REPAIR | | LS |
1.00
| 0.00 | 1.00 | $4,000.00 | $4,000.00 |
| S-8 | COLUMN 8B CONCRETE BLOCK | | LS |
1.00
| 0.00 | 1.00 | $1,300.00 | $1,300.00 |
| S-9 | STORAGE ROOM MODIFICATIONS | | LS |
1.00
| 0.00 | 1.00 | $12,000.00 | $12,000.00 |
|