| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
1.00
| 0.95 | 0.05 | $10,000.00 | $500.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
1.00
| 0.95 | 0.05 | $35,000.00 | $1,750.00 |
| 6 | OFFICE FACILITIES | 6.00 | MTH |
6.00
| 5.75 | 0.25 | $3,000.00 | $750.00 |
| 7 | MOBILIZATION | 1.00 | LS |
1.00
| 0.95 | 0.05 | $274,384.00 | $13,719.20 |
| 8 | CLEARING AND GRUBBING | 1.00 | LS |
1.00
| 0.96 | 0.04 | $356,852.00 | $14,274.08 |
| 9 | MAINTENANCE AND PLANT ESTABLISHMENT PERIOD | 1.00 | LS |
1.00
| 0.66 | 0.34 | $6,000.00 | $2,040.00 |
| 10 | TREE ESTABLISHMENT BY TRUCK WATERING | 1.00 | LS |
1.00
| 0.90 | 0.10 | $8,000.00 | $800.00 |
| 16 | UNCLASSIFIED EXCAVATION | 3,962.00 | CY |
2,910.00
| 2,722.00 | 188.00 | $100.00 | $18,800.00 |
| 17 | CRUSHED MISCELLANEOUS BASE | 2,581.00 | CY |
2,110.00
| 1,978.00 | 132.00 | $48.00 | $6,336.00 |
| 19 | AC PAVEMENT | 1,705.00 | TON |
1,705.00
| 1,471.25 | 233.75 | $219.00 | $51,191.25 |
| 20 | AC PAVEMENT(PATCH BACK) | 27.00 | TON |
27.00
| 26.50 | 0.50 | $219.00 | $109.50 |
| 21 | RECONSTRUCT MANHOLE | 11.00 | EA |
10.00
| 9.00 | 1.00 | $2,600.00 | $2,600.00 |
| 37 | COLORED PCC CURB RAMPS, 4" THICK | 9.00 | CY |
7.00
| 6.63 | 0.37 | $1,645.00 | $608.65 |
| 39 | CROSS GUTTER (MOD) | 83.00 | CY |
64.25
| 60.00 | 4.25 | $1,015.00 | $4,313.75 |
| 40 | METAL HAND RAILINGS PER STD PLAN 606 | 24.00 | LF |
24.00
| 1.00 | 23.00 | $300.00 | $6,900.00 |
| 41 | SALVAGE AND RECONSTRUCT EXISTING CONCRETE PAVERS | 1.00 | LS |
1.00
| 0.75 | 0.25 | $6,965.00 | $1,741.25 |
| 42 | CONCRETE UNIT PAVER | 200.00 | SF |
200.00
| 135.00 | 65.00 | $30.00 | $1,950.00 |
| 43 | FILTER FABRIC UNDER CONCRETE UNIT PAVERS | 798.00 | SF |
795.00
| 540.00 | 255.00 | $1.00 | $255.00 |
| 49 | LANDSCAPING | 1.00 | LS |
1.00
| 0.80 | 0.20 | $30,100.00 | $6,020.00 |
| 55 | NO.2 GRAVEL | 10.00 | TON |
10.00
| 8.75 | 1.25 | $130.00 | $162.50 |
| 58 | 2" CONDUIT (SCH 80 PVC) | 500.00 | LF |
500.00
| 475.00 | 25.00 | $88.00 | $2,200.00 |
| 59 | 3" CONDUIT (SCH 80 PVC) | 419.00 | LF |
419.00
| 390.00 | 29.00 | $154.00 | $4,466.00 |
| 61 | WIRE #6 | 185.00 | LF |
185.00
| 0.00 | 185.00 | $6.60 | $1,221.00 |
| 62 | WIRE #10 | 772.00 | LF |
772.00
| 0.00 | 772.00 | $4.50 | $3,474.00 |
| 64 | 3-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) | 633.00 | LF |
633.00
| 0.00 | 633.00 | $5.00 | $3,165.00 |
| 65 | 5-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) | 58.00 | LF |
58.00
| 0.00 | 58.00 | $5.50 | $319.00 |
| 66 | 12-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) | 1,218.00 | LF |
1,218.00
| 0.00 | 1,218.00 | $9.00 | $10,962.00 |
| 73 | REMOVE VEHICLE HEAD (COMPLETE) | 81.00 | EA |
37.00
| 0.00 | 37.00 | $110.00 | $4,070.00 |
| 74 | REMOVE PEDESTRIAN HEAD (COMPLETE) | 16.00 | EA |
4.00
| 0.00 | 4.00 | $110.00 | $440.00 |
| 75 | REMOVE PEDESTRIAN PUSH BUTTON | 32.00 | EA |
19.00
| 0.00 | 19.00 | $429.00 | $8,151.00 |
| 79 | 4-CAMERA VIDEO DETECTION SYSTEM (COMPLETE) | 1.00 | EA |
0.25
| 0.00 | 0.25 | $57,527.00 | $14,381.75 |
| 80 | TYPE 2070 CONTROLLER | 1.00 | EA |
0.25
| 0.00 | 0.25 | $10,852.00 | $2,713.00 |
| 96 | 12' LUMINAIRE MAST ARM | 4.00 | EA |
4.00
| 0.00 | 4.00 | $1,006.50 | $4,026.00 |
| 97 | 12' LUMINAIRE MAST ARM (STRAIGHT) | 1.00 | EA |
1.00
| 0.00 | 1.00 | $1,007.00 | $1,007.00 |
| 98 | LED LUMINAIRES (100W HPS EQUIVALENT) | 2.00 | EA |
2.00
| 0.00 | 2.00 | $1,314.50 | $2,629.00 |
| 99 | LED LUMINAIRES (250W HPS EQUIVALENT) | 3.00 | EA |
2.00
| 0.00 | 2.00 | $1,540.00 | $3,080.00 |
| 100 | PEDESTRIAN PUSH BUTTON | 35.00 | EA |
19.00
| 0.00 | 19.00 | $1,128.00 | $21,432.00 |
| 101 | PEDESTRIAN PUSH BUTTON PLATE | 35.00 | EA |
19.00
| 0.00 | 19.00 | $22.00 | $418.00 |
| 107 | LED COUNTDOWN PEDESTRIAN HEAD (COMPLETE) | 23.00 | EA |
7.00
| 0.00 | 7.00 | $1,117.00 | $7,819.00 |
| 108 | 3-12" LED VEHICLE HEAD (COMPLETE) | 81.00 | EA |
37.00
| 0.00 | 37.00 | $1,458.00 | $53,946.00 |
| 112 | REMOVE PAVEMENT MARKINGS (THERMOPLASTIC) | 1,887.00 | SF |
500.00
| 400.00 | 100.00 | $3.00 | $300.00 |
| 126 | 12" STRIPING (THERMOPLASTIC) | 1,101.00 | LF |
950.00
| 0.00 | 950.00 | $5.00 | $4,750.00 |
| 127 | 24" STRIPING (THERMOPLASTIC) | 6,053.00 | LF |
4,500.00
| 0.00 | 4,500.00 | $8.00 | $36,000.00 |
| 131 | PEDESTRIAN DIRECTIONAL SIGN POSTS | 13.00 | EA |
13.00
| 0.00 | 13.00 | $2,750.00 | $35,750.00 |
| 132 | PEDESTRIAN DIRECTIONAL SIGN FOUNDATION | 13.00 | EA |
13.00
| 0.00 | 13.00 | $2,530.00 | $32,890.00 |
| 133 | SIGN PANEL | 109.00 | EA |
12.00
| 0.00 | 12.00 | $215.00 | $2,580.00 |
| 135 | REMOVE SIGN | 51.00 | EA |
24.00
| 0.00 | 24.00 | $72.00 | $1,728.00 |
| 136 | REMOVE SIGN POST | 3.00 | EA |
1.00
| 0.00 | 1.00 | $275.00 | $275.00 |
| 139 | TRAFFIC CONTROL | 1.00 | LS |
1.00
| 0.94 | 0.06 | $419,835.00 | $25,190.10 |
| S-7 | METRO OVERHEAD CROSSING APPLICATION ENGINEERING REVIEW FEES | | LS |
1.00
| 0.00 | 1.00 | $7,024.75 | $7,024.75 |
| S-9 | PEDESTRIAN DIRECTION PANELS - CREDIT | | EA |
11.00
| 0.00 | 11.00 | ($1,200.00) | ($13,200.00) |
|