Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 11.00 | MTH |
5.00
| 4.00 | 1.00 | $500.00 | $500.00 |
4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.40
| 0.32 | 0.08 | $20,000.00 | $1,600.00 |
7 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.40
| 0.32 | 0.08 | $40,000.00 | $3,200.00 |
9 | OFFICE FACILITIES | 12.00 | MTH |
5.00
| 4.00 | 1.00 | $7,500.00 | $7,500.00 |
14 | UNCLASSIFIED EXCAVATION (ROADWAY) | 2,063.00 | CY |
1,309.81
| 765.11 | 544.70 | $170.00 | $92,599.00 |
16 | PULVERIZED BASE MATERIAL, 6" THICK | 51,273.00 | SY |
23,920.57
| 16,273.44 | 7,647.13 | $2.00 | $15,294.26 |
19 | COLD MILL AC PAVEMENT (> 3") | 461,406.00 | SF |
278,896.10
| 210,072.00 | 68,824.10 | $0.60 | $41,294.46 |
20 | AC PAVEMENT | 8,700.00 | TON |
5,516.52
| 3,129.00 | 2,387.52 | $110.00 | $262,627.20 |
67 | 4-CAMERA VIDEO DETECTION SYSTEM (COMPLETE) | 2.00 | EA |
1.50
| 1.00 | 0.50 | $60,000.00 | $30,000.00 |
68 | REMOVE TYPE 337 CABINET | 1.00 | EA |
1.00
| 0.00 | 1.00 | $1,100.00 | $1,100.00 |
69 | REMOVE CONTROLLER | 1.00 | EA |
1.00
| 0.00 | 1.00 | $215.00 | $215.00 |
86 | REMOVE ILD SENSOR UNIT | 6.00 | EA |
6.00
| 0.00 | 6.00 | $110.00 | $660.00 |
90 | SWITCH PACK | 9.00 | EA |
1.00
| 0.00 | 1.00 | $50.00 | $50.00 |
91 | PED ISOLATION MODULE | 2.00 | EA |
2.00
| 0.00 | 2.00 | $120.00 | $240.00 |
92 | TYPE 332 CABINET | 1.00 | EA |
1.00
| 0.50 | 0.50 | $25,000.00 | $12,500.00 |
139 | TRAFFIC CONTROL | 1.00 | LS |
0.45
| 0.37 | 0.08 | $360,000.00 | $28,800.00 |
S-14 | BUS SHELTER CONDUIT | | LS |
1.00
| 0.00 | 1.00 | $2,356.00 | $2,356.00 |
S-16 | RE-WORK NW CURB RAMP AT ALTADENA DR AND WASHINGTON BLVD | | LS |
1.00
| 0.00 | 1.00 | $11,392.00 | $11,392.00 |
|