Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 11.00 | MTH |
8.00
| 7.00 | 1.00 | $500.00 | $500.00 |
4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.95
| 0.90 | 0.05 | $20,000.00 | $1,000.00 |
7 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.95
| 0.90 | 0.05 | $40,000.00 | $2,000.00 |
9 | OFFICE FACILITIES | 12.00 | MTH |
8.00
| 7.00 | 1.00 | $7,500.00 | $7,500.00 |
14 | UNCLASSIFIED EXCAVATION (ROADWAY) | 2,063.00 | CY |
2,147.00
| 1,924.00 | 223.00 | $170.00 | $37,910.00 |
16 | PULVERIZED BASE MATERIAL, 6" THICK | 51,273.00 | SY |
49,666.89
| 39,767.00 | 9,899.89 | $2.00 | $19,799.78 |
19 | COLD MILL AC PAVEMENT (> 3") | 461,406.00 | SF |
451,610.10
| 375,037.10 | 76,573.00 | $0.60 | $45,943.80 |
20 | AC PAVEMENT | 8,700.00 | TON |
8,932.16
| 7,780.31 | 1,151.85 | $110.00 | $126,703.50 |
28 | ASPHALT RUBBER HOT MIX | 3,887.00 | TON |
3,887.00
| 2,497.87 | 1,389.13 | $140.00 | $194,478.20 |
34 | REMOVE AND REPLACE EXISTING CATCH BASIN GRATE(S) PER DETAIL D ON SHEET 15 | 31.00 | EA |
27.00
| 29.00 | -2.00 | $1,400.00 | ($2,800.00) |
139 | TRAFFIC CONTROL | 1.00 | LS |
0.84
| 0.76 | 0.08 | $360,000.00 | $28,800.00 |
140 | MODIFY EXISTING TREE WELL PER CONSTRUCTION NOTE 13 AND DETAIL C ON SHEET 3 | 6.00 | EA |
6.00
| 0.00 | 6.00 | $1,300.00 | $7,800.00 |
141 | TREE WELL, TYPE 1, CASE 2 (MODIFIED PER CONSTRUCTION NOTE 13 AND DETAIL B ON SHEET 3) | 55.00 | EA |
55.00
| 0.00 | 55.00 | $590.00 | $32,450.00 |
142 | FURNISH AND PLANT 24" BOX TREE | 55.00 | EA |
25.00
| 0.00 | 25.00 | $655.00 | $16,375.00 |
S-2 | COLD MILL/ARHM ALTADENA DR (CITY) | | LS |
1.00
| 0.00 | 1.00 | $55,707.61 | $55,707.61 |
S-5 | FURNISH & INSTALL TREE (15 GAL) | | EA |
31.00
| 0.00 | 31.00 | $477.23 | $14,794.13 |
S-17 | INSTALL TREE IRRIGATION PIPE | | EA |
56.00
| 0.00 | 56.00 | $91.20 | $5,107.20 |
S-20 | MULTIPLE RE-ADJUSTMENTS OF RAMP FORM ON TIERRA ALTA DR | | LS |
1.00
| 0.00 | 1.00 | $2,429.54 | $2,429.54 |
S-24 | ADDITIONAL HIGH EARLY CEMENT PCC | | LS |
1.00
| 0.00 | 1.00 | $2,163.00 | $2,163.00 |
S-25 | TEMPORARY STRIPING ON ALTADENA DR, NORTH OF WASHINGTON BLVD | | LS |
1.00
| 0.00 | 1.00 | $2,410.00 | $2,410.00 |
S-26 | GEOTEXTILE REWORK FOR RUBBER SW | | LS |
1.00
| 0.00 | 1.00 | $11,140.00 | $11,140.00 |
|