Los Angeles County Public Works
Project Management Division III
As-Built 7
Project Name: Ladera Heights - Centinela Avenue et al
Contractor: Access Pacific, Inc.
2835 Sierra Grande Street
Pasadena, CA 91107
Project ID: RDC0012971
Federal Number(s): None
Original Contract: $2,586,110.99
Awarded: 11/8/2023
Period Ending: 1/13/2025
Board Accepted: 3/11/2025
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
1CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 1.000.00$2,500.00$0.00
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)3.00MTH 3.00 3.000.00$500.00$0.00
3CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000)1.00LS 1.00 1.000.00$1,000.00$0.00
4IMPLEMENTATION OF THE LTWHP1.00LS 1.00 1.000.00$15,000.00$0.00
5IMPLEMENTATION OF BMPS1.00LS 1.00 1.000.00$25,000.00$0.00
6SHORING OF OPEN EXCAVATIONS1.00LS 1.00 1.000.00$10,000.00$0.00
7OFFICE FACILITIES4.00MTH 4.00 4.000.00$5,000.00$0.00
8MOBILIZATION1.00LS 1.00 1.000.00$220,000.00$0.00
9CLEARING AND GRUBBING1.00LS 1.00 1.000.00$20,000.00$0.00
10CONCRETE REMOVAL (NON-REINFORCED)100.00CY 99.98 99.980.00$450.00$0.00
11UNCLASSIFIED EXCAVATION549.00CY 551.91 551.910.00$180.00$0.00
12DRAINAGE GEOTEXTILE1.00SY 1.00 1.000.00$1,200.00$0.00
13CRUSHED MISCELLANEOUS BASE319.00CY 360.81 360.810.00$160.00$0.00
14TRENCH BACKFILL SLURRY (CLASS 270-E-500)17.00CY 18.94 18.940.00$400.00$0.00
15COLD MILL AC PAVEMENT (> 1-1/2 - 3")425,462.00SF 425,462.00 425,462.000.00$0.77$0.00
16COLD MILL AC PAVEMENT (> 3")1,240.00SF 1,240.00 1,240.000.00$2.87$0.00
17AC PAVEMENT107.00TON 63.70 63.700.00$150.00$0.00
18AC PAVEMENT(PATCH BACK)34.00TON 37.88 37.880.00$300.00$0.00
19AC PAVEMENT(LEVELING COURSE)1,973.00TON 2,036.00 2,036.000.00$150.00$0.00
20RECONSTRUCT MANHOLE1.00EA 1.00 1.000.00$3,500.00$0.00
21DOUBLE ADJUST MANHOLE5.00EA 1.00 1.000.00$1,500.00$0.00
22CLEAN AND PAINT EXISTING MANHOLE1.00LS 1.00 1.000.00$1,500.00$0.00
23PCC PAVEMENT48.00CY 48.00 48.000.00$700.00$0.00
24ASPHALT RUBBER HOT MIX3,454.00TON 3,167.00 3,167.000.00$160.00$0.00
25ASPHALT RUBBER HOT MIX (TEST STRIP)500.00TON 500.00 500.000.00$170.00$0.00
26DRILL AND BOND DOWEL190.00LF 170.00 170.000.00$30.00$0.00
27CONNECTION TO EXISTING CATCH BASIN1.00EA 1.00 1.000.00$2,500.00$0.00
28REINFORCED CONCRETE RETAINING WALL TYPE 715.00CY 16.50 16.500.00$2,500.00$0.00
29CONCRETE SLOUGH WALL1.00CY 1.00 1.000.00$2,500.00$0.00
30PCC CURB, TYPE A1-826.00LF 26.00 26.000.00$50.00$0.00
31PCC CURB, TYPE A1-VAR138.00LF 101.00 101.000.00$50.00$0.00
32PCC CURB & GUTTER, TYPE A2-615.00LF 15.00 15.000.00$75.00$0.00
33PCC CURB & GUTTER, TYPE A2-846.00LF 124.50 124.500.00$75.00$0.00
34PCC CURB & GUTTER, TYPE A2-VAR204.00LF 331.00 331.000.00$75.00$0.00
35PCC WALK & DRIVEWAYS, 4" THICK2,071.00SF 2,247.00 2,247.000.00$13.00$0.00
36PCC CURB RAMPS30.00CY 25.40 25.400.00$1,400.00$0.00
37DETECTABLE WARNING SURFACE187.00SF 187.00 187.000.00$55.00$0.00
38DETECTABLE WARNING SURFACE (CULVER CITY)15.00SF 15.00 15.000.00$70.00$0.00
39CROSS GUTTER77.00CY 60.80 60.800.00$700.00$0.00
40COMPOSITE TYPE 2 PULL BOX INCL COVER1.00EA 1.00 1.000.00$2,300.00$0.00
41COMPOSITE TYPE 3 PULL BOX INCL COVER8.00EA 2.00 2.000.00$2,300.00$0.00
422" CONDUIT (SCH 80 PVC)115.00LF 50.00 50.000.00$120.00$0.00
433" CONDUIT (SCH 80 PVC)50.00LF 40.00 40.000.00$140.00$0.00
442-PAIR DETECTOR LEAD-IN CABLE1,315.00LF 1,315.00 1,315.000.00$5.00$0.00
45INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT2,014.00LF 2,014.00 2,014.000.00$21.00$0.00
46DETAIL 9 (THERMOPLASTIC)13,095.00LF 13,095.00 13,095.000.00$0.85$0.00
47DETAIL 22 (THERMOPLASTIC)2,330.00LF 2,330.00 2,330.000.00$1.80$0.00
48DETAIL 29 (THERMOPLASTIC)1,712.00LF 1,712.00 1,712.000.00$3.15$0.00
49DETAIL 32 (THERMOPLASTIC)1,226.00LF 1,226.00 1,226.000.00$3.00$0.00
50DETAIL 37B (THERMOPLASTIC)1,443.00LF 1,443.00 1,443.000.00$2.15$0.00
51DETAIL 38 (THERMOPLASTIC)2,408.00LF 2,408.00 2,408.000.00$2.15$0.00
52DETAIL 40 (THERMOPLASTIC)656.00LF 656.00 656.000.00$1.40$0.00
53DETAIL 41 (THERMOPLASTIC)126.00LF 126.00 126.000.00$1.40$0.00
54PAVEMENT MARKINGS (THERMOPLASTIC)4,990.00SF 5,495.00 5,495.000.00$7.35$0.00
556" STRIPING (THERMOPLASTIC)3,013.00LF 3,013.00 3,013.000.00$0.85$0.00
5612" STRIPING (THERMOPLASTIC)620.00LF 683.00 683.000.00$4.30$0.00
57REMOVE STRIPING AND MARKINGS (THERMOPLASTIC)381.00SF 407.00 407.000.00$8.90$0.00
58INSTALL FIRE HYDRANT LOCATION RPM11.00EA 11.00 11.000.00$30.00$0.00
59SIGN POST (ROADSIDE SIGN)2.00EA 3.00 3.000.00$400.00$0.00
60SIGN PANEL2.00EA 5.00 5.000.00$130.00$0.00
61TRAFFIC CONTROL1.00LS 1.00 1.000.00$200,000.00$0.00
62FLASHING ARROW SIGN6.00EA 6.00 6.000.00$5,000.00$0.00
63CHANGEABLE MESSAGE SIGN7.00EA 7.00 7.000.00$10,000.00$0.00
64#2 CONCRETE AGGREGATE2.00CY 2.00 2.000.00$300.00$0.00
65TEMPORARY FENCING80.00LF 80.00 80.000.00$20.00$0.00
666" PVC PIPE (SCH 80)8.00LF 8.00 8.000.00$250.00$0.00
676" PVC SCH 80 PERFORATED PIPE40.00LF 40.00 40.000.00$250.00$0.00
68CONSTRUCT AND REMOVE SILT FENCE60.00LF 60.00 60.000.00$30.00$0.00
69CAST IN PLACE CONCRETE TROUGH1.00CY 1.00 1.000.00$3,000.00$0.00
70GABION CHECK DAM WITH COBBLE INFILL12.00LF 12.00 12.000.00$700.00$0.00
71FORMED STEEL TROUGH AND NARROW SLOT TRENCH GRATE WITH FRAME1.00EA 1.00 1.000.00$5,300.00$0.00
72STAINLESS STEEL DEBRIS MESH AND FRAME1.00EA 1.00 1.000.00$3,400.00$0.00
73CLASS D BIOSWALE MIX18.00CY 15.00 15.000.00$275.00$0.00
74FURNISH AND PLANT 5 GALLON SHRUBS6.00EA 6.00 6.000.00$150.00$0.00
75FURNISH AND PLANT 1 GALLON SHRUB42.00EA 46.00 46.000.00$70.00$0.00
7690 DAY PLANT ESTABLISHMENT PERIOD1.00LS 1.00 1.000.00$5,000.00$0.00
S-1MOBILIZATION AND TRAFFIC CONTROL (CO #1) LS 1.00 1.000.00$5,196.60$0.00
S-2RELOCATE TS PB AT ALVERN ST. T&M 29,807.43 29,807.430.00$1.00$0.00
S-3CONTRACT TIME EXTENSION WD 10.00 0.0010.00$0.00$0.00
S-4PAVEMENT FABRIC REMOVAL LS 1.00 1.000.00$10,088.93$0.00
S-5HOMELESS ENCAMPMENT REMOVAL EFFORTS LS 1.00 1.000.00$19,975.27$0.00
S-6RV ENCAMPMENT CLEARING DELAY COST (CO #8) LS 1.00 1.000.00$19,819.62$0.00

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $2,613,857.79 $2,613,857.79 $0.00
Retained $130,692.90 $130,692.90 $0.00
Deducted $0.00 $0.00 $0.00
Due $2,483,164.89 $2,483,164.89 $0.00



*The term "As-Built" used by the Department of Public Works in combination with the Engineer's Monthly Estimate process indicates that the project has been field accepted and that the pay quantities and deductions as detailed above are FINAL. Unless a certified letter is received by this office within 14 calendar days disputing the amounts shown, an acceptance letter will be filed with the Board of Supervisors authorizing the release of retention.