| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 3.00 | MTH |
3.00
| 3.00 | 0.00 | $500.00 | $0.00 |
| 3 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
1.00
| 1.00 | 0.00 | $15,000.00 | $0.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $25,000.00 | $0.00 |
| 6 | SHORING OF OPEN EXCAVATIONS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
| 7 | OFFICE FACILITIES | 4.00 | MTH |
4.00
| 4.00 | 0.00 | $5,000.00 | $0.00 |
| 8 | MOBILIZATION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $220,000.00 | $0.00 |
| 9 | CLEARING AND GRUBBING | 1.00 | LS |
1.00
| 1.00 | 0.00 | $20,000.00 | $0.00 |
| 10 | CONCRETE REMOVAL (NON-REINFORCED) | 100.00 | CY |
99.98
| 99.98 | 0.00 | $450.00 | $0.00 |
| 11 | UNCLASSIFIED EXCAVATION | 549.00 | CY |
551.91
| 551.91 | 0.00 | $180.00 | $0.00 |
| 12 | DRAINAGE GEOTEXTILE | 1.00 | SY |
1.00
| 1.00 | 0.00 | $1,200.00 | $0.00 |
| 13 | CRUSHED MISCELLANEOUS BASE | 319.00 | CY |
360.81
| 360.81 | 0.00 | $160.00 | $0.00 |
| 14 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) | 17.00 | CY |
18.94
| 18.94 | 0.00 | $400.00 | $0.00 |
| 15 | COLD MILL AC PAVEMENT (> 1-1/2 - 3") | 425,462.00 | SF |
425,462.00
| 425,462.00 | 0.00 | $0.77 | $0.00 |
| 16 | COLD MILL AC PAVEMENT (> 3") | 1,240.00 | SF |
1,240.00
| 1,240.00 | 0.00 | $2.87 | $0.00 |
| 17 | AC PAVEMENT | 107.00 | TON |
63.70
| 63.70 | 0.00 | $150.00 | $0.00 |
| 18 | AC PAVEMENT(PATCH BACK) | 34.00 | TON |
37.88
| 37.88 | 0.00 | $300.00 | $0.00 |
| 19 | AC PAVEMENT(LEVELING COURSE) | 1,973.00 | TON |
2,036.00
| 2,036.00 | 0.00 | $150.00 | $0.00 |
| 20 | RECONSTRUCT MANHOLE | 1.00 | EA |
1.00
| 1.00 | 0.00 | $3,500.00 | $0.00 |
| 21 | DOUBLE ADJUST MANHOLE | 5.00 | EA |
1.00
| 1.00 | 0.00 | $1,500.00 | $0.00 |
| 22 | CLEAN AND PAINT EXISTING MANHOLE | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,500.00 | $0.00 |
| 23 | PCC PAVEMENT | 48.00 | CY |
48.00
| 48.00 | 0.00 | $700.00 | $0.00 |
| 24 | ASPHALT RUBBER HOT MIX | 3,454.00 | TON |
3,167.00
| 3,167.00 | 0.00 | $160.00 | $0.00 |
| 25 | ASPHALT RUBBER HOT MIX (TEST STRIP) | 500.00 | TON |
500.00
| 500.00 | 0.00 | $170.00 | $0.00 |
| 26 | DRILL AND BOND DOWEL | 190.00 | LF |
170.00
| 170.00 | 0.00 | $30.00 | $0.00 |
| 27 | CONNECTION TO EXISTING CATCH BASIN | 1.00 | EA |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 28 | REINFORCED CONCRETE RETAINING WALL TYPE 7 | 15.00 | CY |
16.50
| 16.50 | 0.00 | $2,500.00 | $0.00 |
| 29 | CONCRETE SLOUGH WALL | 1.00 | CY |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 30 | PCC CURB, TYPE A1-8 | 26.00 | LF |
26.00
| 26.00 | 0.00 | $50.00 | $0.00 |
| 31 | PCC CURB, TYPE A1-VAR | 138.00 | LF |
101.00
| 101.00 | 0.00 | $50.00 | $0.00 |
| 32 | PCC CURB & GUTTER, TYPE A2-6 | 15.00 | LF |
15.00
| 15.00 | 0.00 | $75.00 | $0.00 |
| 33 | PCC CURB & GUTTER, TYPE A2-8 | 46.00 | LF |
124.50
| 124.50 | 0.00 | $75.00 | $0.00 |
| 34 | PCC CURB & GUTTER, TYPE A2-VAR | 204.00 | LF |
331.00
| 331.00 | 0.00 | $75.00 | $0.00 |
| 35 | PCC WALK & DRIVEWAYS, 4" THICK | 2,071.00 | SF |
2,247.00
| 2,247.00 | 0.00 | $13.00 | $0.00 |
| 36 | PCC CURB RAMPS | 30.00 | CY |
25.40
| 25.40 | 0.00 | $1,400.00 | $0.00 |
| 37 | DETECTABLE WARNING SURFACE | 187.00 | SF |
187.00
| 187.00 | 0.00 | $55.00 | $0.00 |
| 38 | DETECTABLE WARNING SURFACE (CULVER CITY) | 15.00 | SF |
15.00
| 15.00 | 0.00 | $70.00 | $0.00 |
| 39 | CROSS GUTTER | 77.00 | CY |
60.80
| 60.80 | 0.00 | $700.00 | $0.00 |
| 40 | COMPOSITE TYPE 2 PULL BOX INCL COVER | 1.00 | EA |
1.00
| 1.00 | 0.00 | $2,300.00 | $0.00 |
| 41 | COMPOSITE TYPE 3 PULL BOX INCL COVER | 8.00 | EA |
2.00
| 2.00 | 0.00 | $2,300.00 | $0.00 |
| 42 | 2" CONDUIT (SCH 80 PVC) | 115.00 | LF |
50.00
| 50.00 | 0.00 | $120.00 | $0.00 |
| 43 | 3" CONDUIT (SCH 80 PVC) | 50.00 | LF |
40.00
| 40.00 | 0.00 | $140.00 | $0.00 |
| 44 | 2-PAIR DETECTOR LEAD-IN CABLE | 1,315.00 | LF |
1,315.00
| 1,315.00 | 0.00 | $5.00 | $0.00 |
| 45 | INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT | 2,014.00 | LF |
2,014.00
| 2,014.00 | 0.00 | $21.00 | $0.00 |
| 46 | DETAIL 9 (THERMOPLASTIC) | 13,095.00 | LF |
13,095.00
| 13,095.00 | 0.00 | $0.85 | $0.00 |
| 47 | DETAIL 22 (THERMOPLASTIC) | 2,330.00 | LF |
2,330.00
| 2,330.00 | 0.00 | $1.80 | $0.00 |
| 48 | DETAIL 29 (THERMOPLASTIC) | 1,712.00 | LF |
1,712.00
| 1,712.00 | 0.00 | $3.15 | $0.00 |
| 49 | DETAIL 32 (THERMOPLASTIC) | 1,226.00 | LF |
1,226.00
| 1,226.00 | 0.00 | $3.00 | $0.00 |
| 50 | DETAIL 37B (THERMOPLASTIC) | 1,443.00 | LF |
1,443.00
| 1,443.00 | 0.00 | $2.15 | $0.00 |
| 51 | DETAIL 38 (THERMOPLASTIC) | 2,408.00 | LF |
2,408.00
| 2,408.00 | 0.00 | $2.15 | $0.00 |
| 52 | DETAIL 40 (THERMOPLASTIC) | 656.00 | LF |
656.00
| 656.00 | 0.00 | $1.40 | $0.00 |
| 53 | DETAIL 41 (THERMOPLASTIC) | 126.00 | LF |
126.00
| 126.00 | 0.00 | $1.40 | $0.00 |
| 54 | PAVEMENT MARKINGS (THERMOPLASTIC) | 4,990.00 | SF |
5,495.00
| 5,495.00 | 0.00 | $7.35 | $0.00 |
| 55 | 6" STRIPING (THERMOPLASTIC) | 3,013.00 | LF |
3,013.00
| 3,013.00 | 0.00 | $0.85 | $0.00 |
| 56 | 12" STRIPING (THERMOPLASTIC) | 620.00 | LF |
683.00
| 683.00 | 0.00 | $4.30 | $0.00 |
| 57 | REMOVE STRIPING AND MARKINGS (THERMOPLASTIC) | 381.00 | SF |
407.00
| 407.00 | 0.00 | $8.90 | $0.00 |
| 58 | INSTALL FIRE HYDRANT LOCATION RPM | 11.00 | EA |
11.00
| 11.00 | 0.00 | $30.00 | $0.00 |
| 59 | SIGN POST (ROADSIDE SIGN) | 2.00 | EA |
3.00
| 3.00 | 0.00 | $400.00 | $0.00 |
| 60 | SIGN PANEL | 2.00 | EA |
5.00
| 5.00 | 0.00 | $130.00 | $0.00 |
| 61 | TRAFFIC CONTROL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $200,000.00 | $0.00 |
| 62 | FLASHING ARROW SIGN | 6.00 | EA |
6.00
| 6.00 | 0.00 | $5,000.00 | $0.00 |
| 63 | CHANGEABLE MESSAGE SIGN | 7.00 | EA |
7.00
| 7.00 | 0.00 | $10,000.00 | $0.00 |
| 64 | #2 CONCRETE AGGREGATE | 2.00 | CY |
2.00
| 2.00 | 0.00 | $300.00 | $0.00 |
| 65 | TEMPORARY FENCING | 80.00 | LF |
80.00
| 80.00 | 0.00 | $20.00 | $0.00 |
| 66 | 6" PVC PIPE (SCH 80) | 8.00 | LF |
8.00
| 8.00 | 0.00 | $250.00 | $0.00 |
| 67 | 6" PVC SCH 80 PERFORATED PIPE | 40.00 | LF |
40.00
| 40.00 | 0.00 | $250.00 | $0.00 |
| 68 | CONSTRUCT AND REMOVE SILT FENCE | 60.00 | LF |
60.00
| 60.00 | 0.00 | $30.00 | $0.00 |
| 69 | CAST IN PLACE CONCRETE TROUGH | 1.00 | CY |
1.00
| 1.00 | 0.00 | $3,000.00 | $0.00 |
| 70 | GABION CHECK DAM WITH COBBLE INFILL | 12.00 | LF |
12.00
| 12.00 | 0.00 | $700.00 | $0.00 |
| 71 | FORMED STEEL TROUGH AND NARROW SLOT TRENCH GRATE WITH FRAME | 1.00 | EA |
1.00
| 1.00 | 0.00 | $5,300.00 | $0.00 |
| 72 | STAINLESS STEEL DEBRIS MESH AND FRAME | 1.00 | EA |
1.00
| 1.00 | 0.00 | $3,400.00 | $0.00 |
| 73 | CLASS D BIOSWALE MIX | 18.00 | CY |
15.00
| 15.00 | 0.00 | $275.00 | $0.00 |
| 74 | FURNISH AND PLANT 5 GALLON SHRUBS | 6.00 | EA |
6.00
| 6.00 | 0.00 | $150.00 | $0.00 |
| 75 | FURNISH AND PLANT 1 GALLON SHRUB | 42.00 | EA |
46.00
| 46.00 | 0.00 | $70.00 | $0.00 |
| 76 | 90 DAY PLANT ESTABLISHMENT PERIOD | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| S-1 | MOBILIZATION AND TRAFFIC CONTROL (CO #1) | | LS |
1.00
| 1.00 | 0.00 | $5,196.60 | $0.00 |
| S-2 | RELOCATE TS PB AT ALVERN ST. | | T&M |
29,807.43
| 29,807.43 | 0.00 | $1.00 | $0.00 |
| S-3 | CONTRACT TIME EXTENSION | | WD |
10.00
| 0.00 | 10.00 | $0.00 | $0.00 |
| S-4 | PAVEMENT FABRIC REMOVAL | | LS |
1.00
| 1.00 | 0.00 | $10,088.93 | $0.00 |
| S-5 | HOMELESS ENCAMPMENT REMOVAL EFFORTS | | LS |
1.00
| 1.00 | 0.00 | $19,975.27 | $0.00 |
| S-6 | RV ENCAMPMENT CLEARING DELAY COST (CO #8) | | LS |
1.00
| 1.00 | 0.00 | $19,819.62 | $0.00 |
|