| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 4.00 | MTH |
7.00
| 7.00 | 0.00 | $500.00 | $0.00 |
| 3 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
1.00
| 1.00 | 0.00 | $15,000.00 | $0.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $45,000.00 | $0.00 |
| 6 | PREPARATION OF THE NOISE MITIGATION PLAN (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 7 | CONSTRUCTION OF TEMPORARY SOUND BARRIER | 60.00 | LF |
60.00
| 60.00 | 0.00 | $250.00 | $0.00 |
| 8 | MAINTENANCE OF TEMPORARY SOUND BARRIER | 60.00 | LF |
60.00
| 60.00 | 0.00 | $30.00 | $0.00 |
| 9 | REMOVAL OF TEMPORARY SOUND BARRIER | 60.00 | LF |
60.00
| 60.00 | 0.00 | $120.00 | $0.00 |
| 10 | PREPARATION OF THE COFFERDAM DEWATERING PLAN (STIPULATED UNIT PRICE OF $5,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 11 | CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $25,000) | 25,000.00 | AL |
29,283.34
| 29,283.34 | 0.00 | $1.00 | $0.00 |
| 12 | PREPARATION OF THE SPILL PREVENTION AND CONTROL PLAN (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 13 | PREPARATION OF SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $10,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
| 14 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
1.00
| 1.00 | 0.00 | $15,000.00 | $0.00 |
| 15 | PREPARATION OF TWW WORKPLAN (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 16 | TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE | 1.00 | LS |
1.00
| 1.00 | 0.00 | $55,780.00 | $0.00 |
| 17 | PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $3,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $3,000.00 | $0.00 |
| 18 | IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN | 1.00 | LS |
1.00
| 1.00 | 0.00 | $6,000.00 | $0.00 |
| 19 | REMOVAL AND DISPOSAL OF LBP/LCP | 1.00 | LS |
1.00
| 1.00 | 0.00 | $11,000.00 | $0.00 |
| 20 | PREPARATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN (STIPULATED UNIT PRICE OF $3,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $3,000.00 | $0.00 |
| 21 | IMPLEMENTATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,500.00 | $0.00 |
| 22 | REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING MATERIAL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $18,030.00 | $0.00 |
| 23 | SHORING OF OPEN EXCAVATIONS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $20,000.00 | $0.00 |
| 24 | OFFICE FACILITIES | 4.00 | MTH |
6.00
| 6.00 | 0.00 | $3,500.00 | $0.00 |
| 25 | MOBILIZATION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $323,600.00 | $0.00 |
| 26 | FRP GRATING | 1.00 | LS |
1.00
| 1.00 | 0.00 | $3,600.00 | $0.00 |
| 27 | TOILET, WALL MOUNTED CORNER SINK, AND ACCESSORIES | 1.00 | LS |
1.00
| 1.00 | 0.00 | $41,000.00 | $0.00 |
| 28 | UNCLASSIFIED EXCAVATION | 169.00 | CY |
169.00
| 169.00 | 0.00 | $200.00 | $0.00 |
| 29 | UNCLASSIFIED FILL | 169.00 | CY |
169.00
| 169.00 | 0.00 | $75.00 | $0.00 |
| 30 | STRUCTURE EXCAVATION | 54.00 | CY |
54.00
| 54.00 | 0.00 | $265.00 | $0.00 |
| 31 | STRUCTURE BACKFILL | 36.00 | CY |
36.00
| 36.00 | 0.00 | $125.00 | $0.00 |
| 32 | CONSTRUCT AND REMOVE COFFERDAM | 1.00 | EA |
1.00
| 1.00 | 0.00 | $1,639,519.00 | $0.00 |
| 33 | STRUCTURE CONCRETE | 23.00 | CY |
23.00
| 23.00 | 0.00 | $6,722.00 | $0.00 |
| 34 | BAR REINFORCING STEEL (EPOXY-COATED) | 6,210.00 | LB |
6,210.00
| 6,210.00 | 0.00 | $8.50 | $0.00 |
| 35 | DRILL AND BOND DOWEL (EPOXY CARTRIDGE) | 88.00 | LF |
79.57
| 79.57 | 0.00 | $150.00 | $0.00 |
| 36 | MASONRY GROUT | 1.00 | LS |
1.00
| 1.00 | 0.00 | $500.00 | $0.00 |
| 37 | STRUCTURAL STEEL | 13,588.00 | LB |
13,588.00
| 13,588.00 | 0.00 | $16.50 | $0.00 |
| 38 | EXHAUST PIPE SUPPORT | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,800.00 | $0.00 |
| 39 | MISCELLANEOUS METAL | 136.00 | LB |
136.00
| 136.00 | 0.00 | $272.00 | $0.00 |
| 40 | WARNING SIGN MOUNTING FRAME | 4.00 | EA |
4.00
| 4.00 | 0.00 | $3,100.00 | $0.00 |
| 41 | DOORS, WINDOWS AND LOUVERS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $114,955.00 | $0.00 |
| 42 | CEILING MOUNTED BRIDGE CRANE | 1.00 | LS |
1.00
| 1.00 | 0.00 | $74,344.00 | $0.00 |
| 43 | EQUIPMENT ROOF HATCH | 3.00 | EA |
3.00
| 3.00 | 0.00 | $15,000.00 | $0.00 |
| 44 | STEEL ROOF DECK | 1.00 | LS |
1.00
| 1.00 | 0.00 | $85,781.00 | $0.00 |
| 45 | STEEL ROOF PANEL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $107,549.00 | $0.00 |
| 46 | NON-STRUCTURAL FINISHING | 1.00 | LS |
1.00
| 1.00 | 0.00 | $30,360.00 | $0.00 |
| 47 | TEMPORARY BOATYARD | 1.00 | LS |
1.00
| 1.00 | 0.00 | $67,580.00 | $0.00 |
| 48 | METAL BAR GRATING | 1.00 | LS |
1.00
| 1.00 | 0.00 | $10,240.00 | $0.00 |
| 49 | ROOF EXHAUST FAN | 1.00 | LS |
1.00
| 1.00 | 0.00 | $35,200.00 | $0.00 |
| 50 | STEEL PILES | 36,360.00 | LB |
36,360.00
| 36,360.00 | 0.00 | $4.50 | $0.00 |
| 51 | HDPE PIPES | 1.00 | LS |
1.00
| 1.00 | 0.00 | $248,271.00 | $0.00 |
| 52 | STEEL PIPE MANIFOLD | 1.00 | LS |
1.00
| 1.00 | 0.00 | $134,000.00 | $0.00 |
| 53 | RUBBER FLAPPER SWING CHECK VALVES | 1.00 | LS |
1.00
| 1.00 | 0.00 | $316,000.00 | $0.00 |
| 54 | RESTRAINED FLANGE COUPLING ADAPTERS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $56,400.00 | $0.00 |
| 55 | 6-INCH DIAMETER KNIFE GATE VALVE | 1.00 | LS |
1.00
| 1.00 | 0.00 | $8,163.00 | $0.00 |
| 56 | OUTLET STRUCTURE WARNING SIGN LIGHTING | 1.00 | LS |
1.00
| 1.00 | 0.00 | $154,055.00 | $0.00 |
| 57 | REFURBISH EXISTING LOUVERS AND ENCLOSURES | 1.00 | LS |
1.00
| 1.00 | 0.00 | $25,000.00 | $0.00 |
| 58 | PAINT PUMP STATION EXTERIOR WALL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $15,120.00 | $0.00 |
| 59 | DISCHARGE STRUCTURE REMOVAL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $36,360.00 | $0.00 |
| 60 | STEEL PIPES REMOVAL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $39,850.00 | $0.00 |
| 61 | PUMP STATION REMOVAL (PORTION) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $43,000.00 | $0.00 |
| 62 | PUMP STATION FLOOR REMOVAL (PORTION) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $4,500.00 | $0.00 |
| 63 | ELECTRICAL WORK | 1.00 | LS |
1.00
| 1.00 | 0.00 | $527,783.00 | $0.00 |
| 64 | TRAFFIC CONTROL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $196,500.00 | $0.00 |
| S-1 | POWDER-COATED FINISH FOR ROLL-UP DOORS | | LS |
1.00
| 1.00 | 0.00 | $3,616.59 | $0.00 |
| S-2 | OVERHEAD CRANE CHANGES | | LS |
1.00
| 1.00 | 0.00 | $12,202.00 | $0.00 |
| S-3 | PREAST REINFORCED SLAB CHANGES | | LS |
1.00
| 1.00 | 0.00 | $3,315.00 | $0.00 |
| S-4 | EXTENSION OF TIME, PART 1 NTP | | WD |
35.00
| 35.00 | 0.00 | $0.00 | $0.00 |
| S-5 | CHECK VALVE CONCRETE PAD CHANGES | | LS |
1.00
| 1.00 | 0.00 | $3,700.00 | $0.00 |
| S-6 | LIFEGUARD TOWER FOUNDATION REPAIR | | LS |
1.00
| 1.00 | 0.00 | $4,000.00 | $0.00 |
| S-7 | CHECK VALVE AND MANIFOLD PAD SUBGRADE | | LS |
1.00
| 1.00 | 0.00 | $11,400.00 | $0.00 |
| S-8 | COLUMN 8B CONCRETE BLOCK | | LS |
1.00
| 1.00 | 0.00 | $1,300.00 | $0.00 |
| S-9 | STORAGE ROOM MODIFICATIONS | | LS |
1.00
| 1.00 | 0.00 | $12,000.00 | $0.00 |
| S-10 | GROUT CMU BLOCKS AROUND DOOR #1 | | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| S-11 | ROOF SUBSTRATE | | LS |
1.00
| 1.00 | 0.00 | $8,100.00 | $0.00 |
| S-12 | OVERHEAD CRANE CHAIN EXTENSION | | LS |
1.00
| 1.00 | 0.00 | $2,000.00 | $0.00 |
| S-13 | 30-INCH EXPANSION JOINT | | LS |
1.00
| 1.00 | 0.00 | $24,800.00 | $0.00 |
| S-14 | BOATYARD CONTAINER REPLACEMENT | | LS |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
| S-15 | INTERIOR COATING OF 30-INCH DISCHARGE SPOOLS | | LS |
1.00
| 1.00 | 0.00 | $12,000.00 | $0.00 |
| S-16 | COFFERDAM REMOVAL STANDBY AND OVERTIME | | LS |
1.00
| 1.00 | 0.00 | $8,400.00 | $0.00 |
| S-17 | CHAIN LINK GATE AND POST REPLACEMENT | | LS |
1.00
| 1.00 | 0.00 | $4,240.00 | $0.00 |
| S-18 | OUTLET STRUCTURE GRATING ANCHORS | | LS |
1.00
| 1.00 | 0.00 | $2,000.00 | $0.00 |
| S-19 | CHECK VALVE STRAPS | | LS |
1.00
| 1.00 | 0.00 | $870.00 | $0.00 |
| S-20 | SCREW ANCHORS | | LS |
1.00
| 1.00 | 0.00 | $1,250.00 | $0.00 |
| S-21 | CEILING MOUNTED BRIDGE CRANE CERTIFICATION | | LS |
1.00
| 1.00 | 0.00 | $4,000.00 | $0.00 |
| S-22 | CONTRACT TIME EXTENSION COSTS | | DAY |
20.00
| 0.00 | 20.00 | $3,200.00 | $64,000.00 |
| S-23 | MAY 2024 SURVEY | | LS |
1.00
| 0.00 | 1.00 | $36,000.00 | $36,000.00 |
| S-24 | NONCOMPENSABLE DAYS | | DAY |
122.00
| 0.00 | 122.00 | $0.00 | $0.00 |
|