Los Angeles County Public Works
Project Management Division III
Progress Payment 1
Project Name: Colima Rd - City of Whittier Boundary to Fullerton Rd
Contractor: Sully-Miller Contracting Company
135 South State College Boulevard, Suite 400
Brea, CA 92821
Project ID: RDC0014911
Federal Number(s): None
Original Contract: $28,754,729.10
Awarded: 7/30/2024
Period Ending: 7/6/2025
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
1CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 0.001.00$2,500.00$2,500.00
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)24.00MTH 1.00 0.001.00$500.00$500.00
4IMPLEMENTATION OF THE LTWHP1.00LS 0.05 0.000.05$45,000.00$2,250.00
5PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $5,000)1.00LS 1.00 0.001.00$5,000.00$5,000.00
6PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $5,000)1.00LS 1.00 0.001.00$5,000.00$5,000.00
7IMPLEMENTATION OF THE SWPPP1.00LS 0.05 0.000.05$135,000.00$6,750.00
9IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN 1.00LS 0.05 0.000.05$10,000.00$500.00
11PREPARATION OF SOIL MANAGEMENT PLAN (STIPULATED UNIT PRICE $2,500)1.00LS 1.00 0.001.00$2,500.00$2,500.00
12IMPLEMENTATION OF SOIL MANAGEMENT PLAN1.00LS 0.25 0.000.25$25,000.00$6,250.00
13PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 0.001.00$2,500.00$2,500.00
16OFFICE FACILITIES25.00MTH 1.00 0.001.00$15,000.00$15,000.00
18TRAFFIC CONTROL1.00LS 0.05 0.000.05$1,700,000.00$85,000.00
19CLEARING AND GRUBBING1.00LS 0.25 0.000.25$100,000.00$25,000.00
24STUMP REMOVAL ONLY (13"-24" DIAMETER)2.00EA 1.00 0.001.00$500.00$500.00
25TREE REMOVAL (13"-24" DIAMETER)87.00EA 49.00 0.0049.00$550.00$26,950.00
27CONCRETE REMOVAL (NON-REINFORCED)3,340.00CY 215.03 0.00215.03$240.00$51,607.20
29UNCLASSIFIED EXCAVATION23,912.00CY 341.04 0.00341.04$100.00$34,104.00
31CRUSHED MISCELLANEOUS BASE4,311.00CY 288.12 0.00288.12$235.00$67,708.20
34AC PAVEMENT(PATCH BACK)4,524.00TON 32.49 0.0032.49$180.00$5,848.20
35AC PAVEMENT(DRIVEWAYS)25.00TON 4.00 0.004.00$700.00$2,800.00
37RECONSTRUCT MANHOLE2.00EA 1.00 0.001.00$4,450.00$4,450.00
47PCC CURB, TYPE A1-VAR876.00LF 119.00 0.00119.00$40.00$4,760.00
49PCC CURB & GUTTER, TYPE A2-82,067.00LF 348.90 0.00348.90$44.00$15,351.60
57PCC WALK & DRIVEWAYS, 4" THICK38,431.00SF 1,074.00 0.001,074.00$8.50$9,129.00
58PCC CURB RAMPS150.00CY 17.14 0.0017.14$1,200.00$20,568.00
59PCC DRIVEWAYS, 6" THICK4,910.00SF 1,000.00 0.001,000.00$13.00$13,000.00
60DETECTABLE WARNING SURFACE960.00SF 72.00 0.0072.00$60.00$4,320.00
63LOCAL DEPRESSION PER STD PLAN 313, CASE F2.00EA 0.50 0.000.50$1,800.00$900.00
722" CONDUIT (SCH 80 PVC)3,735.00LF 1,004.00 0.001,004.00$70.00$70,280.00
733" CONDUIT (SCH 80 PVC)4,215.00LF 596.00 0.00596.00$100.00$59,600.00
202FLASHING ARROW SIGN2.00EA 1.00 0.001.00$30,000.00$30,000.00
203CHANGEABLE MESSAGE SIGN2.00EA 1.00 0.001.00$60,000.00$60,000.00
228PCC PAVEMENT (HIGH EARLY STRENGTH)456.00CY 31.48 0.0031.48$535.00$16,841.80
246COMPOSITE TYPE 2 PULL BOX INCL COVER27.00EA 8.00 0.008.00$2,200.00$17,600.00
247COMPOSITE TYPE 3 PULL BOX INCL COVER71.00EA 5.00 0.005.00$2,650.00$13,250.00
2612 INCH DIAMETER NON-METALLIC PVC SCHEDULE 80 BRANCH CONDUIT, FITTINGS AND SUPPORTS5,124.00LF 741.00 0.00741.00$65.00$48,165.00
S-2TEMP TRAFFIC SIGNAL PLAN T&M 7,820.88 0.007,820.88$1.00$7,820.88
S-5SWRCB PERMIT FEE LS 1.00 0.001.00$773.95$773.95

DEDUCTION DETAIL

DescriptionUnitTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
LTWHP JUNE WITHHOLDINGS1 9,491.94 0.009,491.94$1.00 $9,491.94

FINANCIAL SUMMARY

  Total Previous Current
Earned $745,077.83 $0.00 $745,077.83
Retained* $37,253.89 $0.00 $37,253.89
Deducted $9,491.94 $0.00 $9,491.94
Due $698,332.00 $0.00 $698,332.00



*This project has an escrow account.

Contact Office Engineer
Contractor Copy  