| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 6.00 | MTH |
7.00
| 6.00 | 1.00 | $500.00 | $500.00 |
| 3 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $1,000.00 | $1,000.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
1.00
| 1.00 | 0.00 | $35,000.00 | $0.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $35,000.00 | $0.00 |
| 6 | SHORING OF OPEN EXCAVATIONS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $35,000.00 | $0.00 |
| 7 | PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $3000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $3,000.00 | $0.00 |
| 8 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
1.00
| 1.00 | 0.00 | $35,000.00 | $0.00 |
| 9 | PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $3000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $3,000.00 | $0.00 |
| 10 | IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN | 1.00 | LS |
1.00
| 1.00 | 0.00 | $35,000.00 | $0.00 |
| 11 | DISPOSAL OF LEAD CONTAINING WASTE/DEBRIS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $35,000.00 | $0.00 |
| 12 | OFFICE FACILITIES | 7.00 | MTH |
9.00
| 7.00 | 2.00 | $5,000.00 | $10,000.00 |
| 13 | MOBILIZATION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $200,000.00 | $0.00 |
| 14 | CLEARING AND GRUBBING | 1.00 | LS |
1.00
| 1.00 | 0.00 | $150,000.00 | $0.00 |
| 15 | 12" HIGH DENSITY POLYETHYLENE PIPE | 215.00 | LF |
200.00
| 200.00 | 0.00 | $300.00 | $0.00 |
| 16 | 12" WATERMAIN, .25" THICK STL | 350.00 | LF |
344.00
| 344.00 | 0.00 | $500.00 | $0.00 |
| 17 | 6" WATERMAIN, .25" THICK STL | 50.00 | LF |
50.00
| 50.00 | 0.00 | $300.00 | $0.00 |
| 18 | GATE VALVE, 200 PSI WWP, 12" | 2.00 | EA |
2.00
| 2.00 | 0.00 | $15,000.00 | $0.00 |
| 19 | GATE VALVE, 200 PSI WWP, 8" | 1.00 | EA |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
| 20 | GATE VALVE, 200 PSI WWP, 6" | 1.00 | EA |
0.00
| 0.00 | 0.00 | $7,500.00 | $0.00 |
| 21 | GATE VALVE, 250 PSI WWP, 6" | 1.00 | EA |
1.00
| 1.00 | 0.00 | $7,500.00 | $0.00 |
| 22 | INTERCONNECTION TO EXISTING WATERMAIN | 3.00 | EA |
3.00
| 3.00 | 0.00 | $10,000.00 | $0.00 |
| 23 | INITIAL VIDEO INSPECTION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 24 | VIDEO INSPECTION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 25 | OWEN TANK DEMOLITION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $100,000.00 | $0.00 |
| 26 | 0.5 MG WATER STORAGE TANK AND APPURTENANCES | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,400,000.00 | $0.00 |
| 27 | OVERFLOW PRECAST DROP INLET, 36" X 36" | 1.00 | EA |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
| 28 | CLEANOUT DOOR PRECAST DROP INLET, 48" X 48" | 1.00 | EA |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
| 29 | CATHODIC PROTECTION SYSTEM (TANK) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $30,000.00 | $0.00 |
| 30 | CONCRETE PAD (SURGE TANKS) | 17.00 | CY |
17.00
| 17.00 | 0.00 | $2,000.00 | $0.00 |
| 31 | 1250 GAL BLADDER SURGE TANK CONTROL SYSTEM | 1.00 | LS |
1.00
| 1.00 | 0.00 | $100,000.00 | $0.00 |
| 32 | 3000 GAL BLADDER SURGE TANK CONTROL SYSTEM | 1.00 | LS |
1.00
| 1.00 | 0.00 | $100,000.00 | $0.00 |
| 33 | GRAVEL | 130.00 | CY |
130.00
| 130.00 | 0.00 | $150.00 | $0.00 |
| 34 | CONCRETE RAIL FENCE | 165.00 | LF |
165.00
| 165.00 | 0.00 | $115.00 | $0.00 |
| 35 | PCC HEADER, 6"X12" | 890.00 | LF |
550.00
| 550.00 | 0.00 | $50.00 | $0.00 |
| 36 | CONCRETE PAVING (PCC) 4" THICK | 305.00 | SF |
226.50
| 226.50 | 0.00 | $50.00 | $0.00 |
| 37 | TREE PROTECTION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
| 38 | ELECTRICAL WORK | 1.00 | LS |
1.00
| 1.00 | 0.00 | $550,000.00 | $0.00 |
| 39 | TRAFFIC CONTROL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $25,000.00 | $0.00 |
| 40 | CONST & REMOVE TEMP CHAIN LINK FENCE | 275.00 | LF |
275.00
| 275.00 | 0.00 | $50.00 | $0.00 |
| S-1 | TIME EXTENSION | | WD |
31.00
| 31.00 | 0.00 | $0.00 | $0.00 |
| S-2 | OVER-EX | | LS |
1.00
| 1.00 | 0.00 | $8,564.00 | $0.00 |
| S-3 | ADDITIONAL RC FOR STORAGE TANK SLAB | | LS |
1.00
| 1.00 | 0.00 | $125,000.00 | $0.00 |
| S-4A | DEWATERING | | LS |
1.00
| 1.00 | 0.00 | $7,500.00 | $0.00 |
| S-5 | BLOWER UPGRADE | | LS |
1.00
| 1.00 | 0.00 | $37,000.00 | $0.00 |
| S-6 | SURGE TANK FOUNDATION REDESIGN | | LS |
1.00
| 1.00 | 0.00 | $12,500.00 | $0.00 |
| S-7 | TIME EXTENSION | | DAYS |
28.00
| 28.00 | 0.00 | $0.00 | $0.00 |
| S-8 | ADD SLURRY BACKFIL | | LS |
1.00
| 1.00 | 0.00 | $2,000.00 | $0.00 |
| S-9 | SURGE TANK CONNECTION RE-DESIGN | | LS |
1.00
| 1.00 | 0.00 | $70,000.00 | $0.00 |
| S-10 | CAULKING | | LS |
1.00
| 1.00 | 0.00 | $1,900.00 | $0.00 |
| S-11 | ADD ADDITIONAL TEE AND VALVE | | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| S-12 | TANK COLOR CHANGE | | LS |
1.00
| 1.00 | 0.00 | $23,000.00 | $0.00 |
| S-13 | INSTALL GASKETS | | LS |
1.00
| 1.00 | 0.00 | $695.17 | $0.00 |
| S-13A | CORRECTION TO ITEM S-13 FOR NUMBER TRANSPOSITION | | LS |
1.00
| 0.00 | 1.00 | $0.54 | $0.54 |
| S-14 | REVISE RADIO AND ANTENA | | LS |
1.00
| 1.00 | 0.00 | $5,929.57 | $0.00 |
| S-15 | REVISED SAMPLE TAP MATERIAL | | LS |
1.00
| 1.00 | 0.00 | $869.92 | $0.00 |
| S-16 | SURGE TANK DISINFECTION | | LS |
1.00
| 1.00 | 0.00 | $7,872.00 | $0.00 |
| S-17 | EDISON TRENCH | | LS |
1.00
| 1.00 | 0.00 | $7,792.28 | $0.00 |
| S-18 | ADDITIONAL PAVING AND REPAIRS | | LS |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
| S-19 | DELIVERY DELAY POSTPONEMENT | | DAYS |
168.00
| 168.00 | 0.00 | $0.00 | $0.00 |
| S-19A | ADDITIONAL EXTENSION FOR ELECTRICAL INSTALLATION | | EA |
15.00
| 15.00 | 0.00 | $0.00 | $0.00 |
| S-20 | ADDITIONAL GROUNDING | | LS |
1.00
| 1.00 | 0.00 | $1,790.00 | $0.00 |
| S-21 | TANK ANTENNA AND CONDUIT CONFIGURATION | | LS |
1.00
| 0.00 | 1.00 | $4,267.10 | $4,267.10 |
| S-22 | INSTALL CONTROL WIRING FROM MCC TO PUMPS A AND B | | LS |
1.00
| 0.00 | 1.00 | $4,375.85 | $4,375.85 |