Los Angeles County Public Works
Project Management Division III
As-Built 12
Project Name: Naples Island Pump Stations Rehabilitation - Phase I
Contractor: MMC, Inc.
5901 Fresca Drive
La Palma, CA 90623
Project ID: FCC0001392
Federal Number(s): None
Original Contract: $5,854,700.00
Awarded: 6/21/2023
Period Ending: 6/25/2025
Board Accepted: 7/30/2025
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
1CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 1.000.00$2,500.00$0.00
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)4.00MTH 4.00 4.000.00$500.00$0.00
3CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000)1.00LS 1.00 0.001.00$1,000.00$1,000.00
4IMPLEMENTATION OF THE LTWHP1.00LS 1.00 1.000.00$10,000.00$0.00
5IMPLEMENTATION OF BMPS1.00LS 1.00 1.000.00$60,000.00$0.00
6CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $25,000)25,000.00AL 36,447.19 36,447.190.00$1.00$0.00
7PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $3000)1.00LS 1.00 1.000.00$3,000.00$0.00
8IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN 1.00LS 1.00 1.000.00$25,000.00$0.00
9REMOVAL AND DISPOSAL OF LBP/LCP WASTE1.00LS 1.00 1.000.00$90,000.00$0.00
10PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $3000)1.00LS 1.00 1.000.00$3,000.00$0.00
11IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN1.00LS 1.00 1.000.00$25,000.00$0.00
12OFFICE FACILITIES5.00MTH 5.00 5.000.00$20,000.00$0.00
13MOBILIZATION1.00LS 1.00 1.000.00$300,000.00$0.00
14OPERATIONAL TESTS1.00LS 1.00 0.980.02$60,000.00$1,200.00
15DEMOLITION1.00LS 1.00 1.000.00$390,000.00$0.00
16TRASH RACK1.00LS 1.00 1.000.00$400,000.00$0.00
17MISCELLANEOUS MECHANICAL WORKS1.00LS 1.00 1.000.00$600,000.00$0.00
18FURNISH AND INSTALL SUBMERSIBLE PUMP AND ACCESSORIES1.00LS 1.00 1.000.00$800,000.00$0.00
19FURNISH AND INSTALL SUMP PUMP AND ACCESSORIES1.00LS 1.00 1.000.00$180,000.00$0.00
20FURNISH SPARE SUMP PUMP3.00EA 3.00 3.000.00$30,000.00$0.00
21ELECTRICAL WORK FOR WEST TOLEDO PUMP STATION1.00LS 1.00 1.000.00$600,000.00$0.00
22ELECTRICAL WORK FOR WEST NEAPOLITAN PUMP STATION1.00LS 1.00 1.000.00$600,000.00$0.00
23ELECTRICAL WORK FOR EAST TOLEDO PUMP STATION1.00LS 1.00 1.000.00$600,000.00$0.00
24STRUCTURE CONCRETE10.00CY 10.00 10.000.00$6,000.00$0.00
25DRILL AND BOND DOWEL (EPOXY CARTRIDGE)261.00LF 261.00 261.000.00$200.00$0.00
26TRAFFIC HATCH DOOR5.00EA 5.00 5.000.00$60,000.00$0.00
27FRP PLATFORM1.00LS 1.00 1.000.00$200,000.00$0.00
28REMOVE EXISTING CONCRETE1.00LS 1.00 1.000.00$76,000.00$0.00
29TRAFFIC CONTROL1.00LS 1.00 1.000.00$200,000.00$0.00
S-1EXTENSION OF TIME, PART 1 NTP WD 26.00 26.000.00$0.00$0.00
S-2TRASH RACK DOOR FRAMING MODIFICATIONS LS 1.00 1.000.00$1,900.00$0.00
S-3PUMP FRAME REMOVAL LS 1.00 1.000.00$22,500.00$0.00
S-4WATER LINE RELOCATION LS 1.00 1.000.00$27,500.00$0.00
S-5REPLACE ENTRANCE DOOR FRAMES LS 1.00 1.000.00$12,500.00$0.00
S-6PIPE SUPPORTS LS 1.00 1.000.00$9,700.00$0.00
S-7CONDUIT RELOCATION PER RFI NO. 55 LS 1.00 1.000.00$3,500.00$0.00
S-8DISCHARGE PIPE HANGERS LS 1.00 1.000.00$3,200.00$0.00
S-9ADDITIONAL ASBESTOS REMOVAL LS 1.00 1.000.00$3,000.00$0.00
S-10GENERAL RENTAL FOR WEST NEAPOLITAN LS 1.00 1.000.00$1,650.00$0.00
S-11SUBMERSIBLE PUMP CONDUIT UPSIZE LS 1.00 1.000.00$10,000.00$0.00
S-12ANNUNCIATOR REPROGRAMMING LS 1.00 1.000.00$3,850.00$0.00
S-13PUMP SCHEMATIC CHANGES LS 1.00 1.000.00$1,770.00$0.00
S-14DRAIN PAN PIPE MODIFICATIONS LS 1.00 1.000.00$3,000.00$0.00
S-15BUBBLER PANEL COMPRESSOR REPLACEMENT LS 1.00 1.000.00$9,500.00$0.00
S-16BLOWER COVERS LS 1.00 1.000.00$1,500.00$0.00
S-17EAST TOLEDO MTS CONDUIT LS 1.00 1.000.00$7,200.00$0.00
S-18CONTRACT TIME EXTENSION NWD 233.00 0.00233.00$0.00$0.00

DEDUCTION DETAIL

DescriptionUnitTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
OVERTIME INSPECTIONHOUR 0.00 0.000.00$100.00 $0.00
LIQUIDATED DAMAGESDAY 3.00 212.00-209.00$2,000.00 ($418,000.00)
LABOR COMPLIANCEVIOLATION 0.00 0.000.00$250.00 $0.00
AFFIRMATIVE ACTIONVIOLATION 0.00 0.000.00$200.00 $0.00
BEST MANAGEMENT PRACTICEVIOLATION 0.00 0.000.00$1,000.00 $0.00
SCHEDULE UPDATEMONTHLY 0.00 0.000.00$250.00 $0.00
LOCAL TARGATED WORKER HIRING PROGRAMSTIP 0.00 0.000.00$1.00 $0.00

FINANCIAL SUMMARY

  Total Previous Current
Earned $5,988,417.19 $5,986,217.19 $2,200.00
Retained $299,420.86 $117,350.86 $182,070.00
Deducted $6,000.00 $424,000.00 ($418,000.00)
Due $5,682,996.33 $5,444,866.33 $238,130.00



*The term "As-Built" used by the Department of Public Works in combination with the Engineer's Monthly Estimate process indicates that the project has been field accepted and that the pay quantities and deductions as detailed above are FINAL. Unless a certified letter is received by this office within 14 calendar days disputing the amounts shown, an acceptance letter will be filed with the Board of Supervisors authorizing the release of retention.