Los Angeles County Public Works
Project Management Division III
Progress Payment 7
Project Name: Beverly Boulevard TSSP - Pomona Boulevard to Pickering Avenue
Contractor: California Professional Engineering, Inc.
19062 San Jose Avenue
La Puente, CA 91748
Project ID: TSM0010262
Federal Number(s): None
Original Contract: $3,143,113.70
Awarded: 6/22/2023
Period Ending: 11/10/2025
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
1CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500)1.00LS 0.95 0.750.20$2,500.00$500.00
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)15.00MTH 13.00 10.003.00$500.00$1,500.00
3CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000)1.00LS 0.95 0.750.20$1,000.00$200.00
4IMPLEMENTATION OF THE LTWHP1.00LS 0.95 0.750.20$10,000.00$2,000.00
5IMPLEMENTATION OF BMPS1.00LS 0.95 0.750.20$5,000.00$1,000.00
231-1/2" CONDUIT (SCH 80 PVC)92.00LF 90.00 80.0010.00$150.00$1,500.00
262-PAIR DETECTOR LEAD-IN CABLE12,575.00LF 12,200.00 10,917.001,283.00$3.80$4,875.40
33INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT7,820.00LF 5,500.00 4,007.001,493.00$13.00$19,409.00
57SWITCH PACK63.00EA 63.00 35.0028.00$50.00$1,400.00
58PED ISOLATION MODULE12.00EA 12.00 6.006.00$100.00$600.00
592-CHANNEL ILD SENSOR UNIT52.00EA 52.00 30.0022.00$300.00$6,600.00
95DETAIL 21 (THERMOPLASTIC)45.00LF 45.00 0.0045.00$9.44$424.80
96DETAIL 22 (THERMOPLASTIC)350.00LF 350.00 0.00350.00$10.30$3,605.00
97DETAIL 38 (THERMOPLASTIC)130.00LF 100.00 0.00100.00$12.30$1,230.00
98DETAIL 40 (THERMOPLASTIC)150.00LF 55.00 0.0055.00$9.10$500.50
100DETAIL 37B (THERMOPLASTIC)570.00LF 565.00 0.00565.00$12.00$6,780.00
101PAVEMENT MARKINGS (THERMOPLASTIC)200.00SF 181.00 0.00181.00$21.00$3,801.00
10224" YELLOW CONTINENTAL CROSSWALK (THERMOPLASTIC)635.00LF 635.00 0.00635.00$8.60$5,461.00
103CURB MARKINGS (TWO-COAT PAINT)210.00LF 210.00 0.00210.00$6.40$1,344.00
104SIGN PANEL130.00EA 122.00 0.00122.00$135.00$16,470.00
105INSTALL SIGN (ROADSIDE SIGN)96.00EA 90.00 0.0090.00$66.00$5,940.00
106INSTALL SIGN (STRAP AND SADDLE BRACKET)19.00EA 17.00 0.0017.00$84.00$1,428.00
107INSTALL SIGN (MAST-ARM HANGER)15.00EA 15.00 0.0015.00$250.00$3,750.00
113FURNISH AND INSTALL SIGN POST (ROADSIDE SIGN)29.00EA 28.00 0.0028.00$193.00$5,404.00
11812" STRIPING (THERMOPLASTIC)1,283.00LF 1,195.00 0.001,195.00$5.70$6,811.50
119PAINT MEDIAN NOSE100.00SF 100.00 0.00100.00$18.00$1,800.00
120REMOVE CONFLICTING STRIPING2,700.00LF 2,664.00 0.002,664.00$8.00$21,312.00
122RECONFIG VIDEO DETECTION ZONE - 1 CAMERA8.00EA 8.00 0.008.00$1,500.00$12,000.00
124CENTRAL CONTROLLER UNIT APS1.00EA 1.00 0.001.00$6,100.00$6,100.00
1273-CAMERA VIDEO/RADAR DETECTION SYSTEM (COMPLETE)1.00EA 1.00 0.500.50$44,300.00$22,150.00
128ACCESSIBLE PEDESTRIAN SIGNAL (APS) UNIT8.00EA 8.00 0.008.00$1,600.00$12,800.00
144EV PREEMPTION SYSTEM5.00EA 5.00 2.003.00$18,762.00$56,286.00
145TYPE 2070 ATC CONTROLLER WITH D4 FIRMWARE5.00EA 5.00 3.002.00$6,430.00$12,860.00
1462070-7G UTB MODULE AND GPS RECEIVER/ANTENNA6.00EA 6.00 0.006.00$1,700.00$10,200.00
1471 SENSOR UNIT - RADAR VEHICLE SENSOR SYSTEM (COMPLETE)1.00EA 1.00 0.500.50$28,300.00$14,150.00
153TRAFFIC CONTROL1.00LS 1.00 0.950.05$86,362.00$4,318.10
154CURB MARKINGS(TWO-COAT PAINT)25.00LF 11.00 0.0011.00$6.40$70.40
S-2REPLACING THE 2070ATC CONTROLLER WITH THE 2070LX CONTROLLER LS 1.00 0.001.00$5,295.86$5,295.86
S-54-UNIT VIDEO/RADAR DETECTION SYSTEM LS 1.00 0.500.50$56,000.00$28,000.00
S-10RELOCATE TYPE P CABINET  LS 1.00 0.001.00$19,900.00$19,900.00
S-11PCC CURB, TYPE A1-8 LF 26.00 0.0026.00$115.00$2,990.00
S-12PCC CURB & GUTTER, TYPE A2-6 LF 50.50 0.0050.50$146.00$7,373.00
S-13PCC CURB & GUTTER, TYPE A2-VAR LF 103.25 0.00103.25$145.00$14,971.25
S-1424" YELLOW CONTINENTAL CROSSWALK (THERMOPLASTIC) LF 765.25 0.00765.25$8.50$6,504.63
S-15ABBEYWOOD AVE SIGN CORRECTION LS 1.00 0.001.00$3,467.70$3,467.70
S-145R2070ATC TO 2070LX CONTROLLER REPLACEMENT/CO 02 EA 1.00 0.001.00$1,059.17$1,059.17

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $3,197,821.40 $2,831,679.09 $366,142.31
Retained $159,891.09 $141,583.97 $18,307.12
Deducted $0.00 $0.00 $0.00
Due $3,037,930.31 $2,690,095.12 $347,835.19



Contact Office Engineer
Contractor Copy  
P Please consider the environment before printing this report.