| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 7.00 | MTH |
3.00
| 2.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.40
| 0.30 | 0.10 | $30,000.00 | $3,000.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
0.60
| 0.40 | 0.20 | $30,000.00 | $6,000.00 |
| 6 | SHORING OF OPEN EXCAVATIONS | 1.00 | LS |
0.50
| 0.40 | 0.10 | $100,000.00 | $10,000.00 |
| 8 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
0.60
| 0.40 | 0.20 | $5,000.00 | $1,000.00 |
| 16 | OFFICE FACILITIES | 8.00 | MTH |
3.00
| 2.00 | 1.00 | $25,000.00 | $25,000.00 |
| 17 | MOBILIZATION | 1.00 | LS |
1.00
| 0.95 | 0.05 | $100,000.00 | $5,000.00 |
| 19 | 12" WATERMAIN, .25" THICK STL, CML & CMC, WELDED | 2,146.00 | LF |
1,708.00
| 888.00 | 820.00 | $650.00 | $533,000.00 |
| 22 | WATER SERVICE, 1.0", STD PLAN W-7 | 11.00 | EA |
7.00
| 0.00 | 7.00 | $6,000.00 | $42,000.00 |
| 24 | RECONNECT EXISTING WATER SERVICE | 6.00 | EA |
5.00
| 2.00 | 3.00 | $7,000.00 | $21,000.00 |
| 25 | RECONNECT EXISTING WATER SERVICE WITH NEW METER BOX AND LID | 17.00 | EA |
13.00
| 11.00 | 2.00 | $8,000.00 | $16,000.00 |
| 27 | BUTTERFLY VALVE, 250 PSI WWP, 8" | 1.00 | EA |
1.00
| 0.00 | 1.00 | $6,000.00 | $6,000.00 |
| 29 | BUTTERFLY VALVE, 250 PSI WWP, 12" | 9.00 | EA |
3.00
| 1.00 | 2.00 | $10,000.00 | $20,000.00 |
| 35 | 20" STEEL CASING | 85.00 | LF |
17.40
| 0.00 | 17.40 | $1,000.00 | $17,400.00 |
| 36 | TRENCH BACKFILL SLURRY (CLASS 140-S-100) | 26.00 | CY |
6.00
| 0.00 | 6.00 | $500.00 | $3,000.00 |
| 38 | RECONNECT EXISTING SAMPLING STATION | 1.00 | EA |
0.75
| 0.00 | 0.75 | $5,000.00 | $3,750.00 |
| 40 | INITIAL VIDEO INSPECTION | 1.00 | LS |
0.90
| 0.50 | 0.40 | $5,000.00 | $2,000.00 |
| 41 | VIDEO INSPECTION | 1.00 | LS |
0.80
| 0.00 | 0.80 | $5,000.00 | $4,000.00 |
| 42 | TRAFFIC CONTROL | 1.00 | LS |
0.60
| 0.40 | 0.20 | $100,000.00 | $20,000.00 |
| S-3 | USACE SCHEDULE IMPACT | | WD |
5.00
| 0.00 | 5.00 | $0.00 | $0.00 |
| S-7 | WATER INTRUSION STA 22+51 | | T&M |
3,304.45
| 0.00 | 3,304.45 | $1.00 | $3,304.45 |
|