| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 12.00 | MTH |
2.00
| 1.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.16
| 0.08 | 0.08 | $25,000.00 | $2,000.00 |
| 6 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.16
| 0.08 | 0.08 | $45,000.00 | $3,600.00 |
| 12 | OFFICE FACILITIES | 12.00 | MTH |
2.00
| 1.00 | 1.00 | $3,000.00 | $3,000.00 |
| 13 | MOBILIZATION | 1.00 | LS |
0.50
| 0.00 | 0.50 | $827,000.00 | $413,500.00 |
| 16 | CONCRETE REMOVAL (NON-REINFORCED) | 1,477.00 | CY |
376.33
| 228.00 | 148.33 | $120.00 | $17,799.60 |
| 18 | UNCLASSIFIED EXCAVATION | 3,925.00 | CY |
688.83
| 622.00 | 66.83 | $135.00 | $9,022.05 |
| 19 | CRUSHED MISCELLANEOUS BASE | 2,770.00 | CY |
305.42
| 0.00 | 305.42 | $110.00 | $33,596.20 |
| 21 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) | 306.00 | CY |
110.00
| 0.00 | 110.00 | $400.00 | $44,000.00 |
| 23 | AC PAVEMENT(PATCH BACK) | 619.00 | TON |
160.58
| 0.00 | 160.58 | $200.00 | $32,116.00 |
| 28 | PCC CURB & GUTTER, TYPE A2-6 | 4,853.00 | LF |
3,130.00
| 0.00 | 3,130.00 | $35.00 | $109,550.00 |
| 30 | PCC CURB & GUTTER, TYPE A2-VAR | 20.00 | LF |
20.00
| 0.00 | 20.00 | $150.00 | $3,000.00 |
| 31 | LONGITUDINAL GUTTER | 2.00 | CY |
1.33
| 0.00 | 1.33 | $3,000.00 | $3,990.00 |
| 42 | 3" CONDUIT (SCH 80 PVC) | 15,544.00 | LF |
1,735.00
| 0.00 | 1,735.00 | $45.00 | $78,075.00 |
| 107 | TRAFFIC CONTROL | 1.00 | LS |
0.20
| 0.10 | 0.10 | $317,968.85 | $31,796.89 |
| 109 | IRRIGATION SYSTEM | 1.00 | LS |
0.10
| 0.00 | 0.10 | $485,000.00 | $48,500.00 |
| 154 | PULL BOX TYPE 2 WITH COVER | 125.00 | EA |
8.00
| 0.00 | 8.00 | $750.00 | $6,000.00 |
|