Los Angeles County Public Works
Project Management Division III
As-Built 9
Project Name: San Gabriel Valley Traffic Signal Safety Project Group I
Contractor: Elecnor Belco Electric, Inc.
14320 Albers Way
Chino, CA 91710
Project ID: TDS0001707
Federal Number(s): HSIPL-5953 (752)
Original Contract: $1,451,750.00
Awarded: 7/11/2023
Period Ending: 9/25/2025
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
1CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 1.000.00$2,500.00$0.00
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)5.00MTH 5.00 5.000.00$500.00$0.00
3CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000)1.00LS 0.00 0.000.00$1,000.00$0.00
4IMPLEMENTATION OF BMPS1.00LS 1.00 1.000.00$3,000.00$0.00
5MOBILIZATION1.00LS 1.00 1.000.00$98,000.00$0.00
6SALVAGE EQUIPMENT1.00LS 1.00 1.000.00$10,000.00$0.00
7SCE WORK (ALLOWANCE OF $15,000)15,000.00AL 6,421.56 6,421.560.00$1.00$0.00
8EXPLORATORY EXCAVATION OF UTILITIES (ALLOWANCE OF $60,000)60,000.00AL 1,600.00 1,600.000.00$1.00$0.00
9CONCRETE REMOVAL (NON-REINFORCED)29.00CY 29.00 29.000.00$399.00$0.00
10UNCLASSIFIED EXCAVATION35.00CY 35.00 35.000.00$404.00$0.00
11CRUSHED MISCELLANEOUS BASE30.00CY 30.00 30.000.00$239.00$0.00
12TRENCH BACKFILL SLURRY (CLASS 270-E-500)5.00CY 5.00 5.000.00$1,645.00$0.00
13AC PAVEMENT(PATCH BACK)5.00TON 5.00 5.000.00$1,497.00$0.00
14PCC CURB & GUTTER, TYPE A2-VAR170.00LF 170.00 170.000.00$65.00$0.00
15PCC WALK, 4" THICK149.00SF 149.00 149.000.00$44.00$0.00
16PCC CURB RAMPS14.00CY 14.00 14.000.00$1,292.00$0.00
17DETECTABLE WARNING SURFACE150.00SF 90.00 90.000.00$86.00$0.00
181" CONDUIT (SCH 80 PVC)40.00LF 40.00 40.000.00$85.00$0.00
192" CONDUIT (SCH 80 PVC)160.00LF 200.00 200.000.00$89.00$0.00
203" CONDUIT (SCH 80 PVC)815.00LF 1,018.75 1,018.750.00$76.00$0.00
213" CONDUIT (SCH 80 PVC, OPEN TRENCH)85.00LF 85.00 85.000.00$107.00$0.00
222-PAIR DETECTOR LEAD-IN CABLE950.00LF 950.00 950.000.00$3.00$0.00
2312-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT)3,715.00LF 4,643.75 4,643.750.00$7.20$0.00
243-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT)3,662.00LF 4,577.50 4,577.500.00$5.00$0.00
255-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT)599.00LF 748.75 748.750.00$8.00$0.00
26WIRE #6775.00LF 968.75 968.750.00$4.00$0.00
27WIRE #106,250.00LF 7,812.50 7,812.500.00$2.00$0.00
28COMPOSITE TYPE 3 PULL BOX INCL COVER22.00EA 22.00 22.000.00$1,100.00$0.00
29INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT80.00LF 80.00 80.000.00$19.00$0.00
30RETROREFLECTIVE STREET NAME SIGN 4.00EA 4.00 4.000.00$1,150.00$0.00
31RELOCATE LUMINAIRE 12.00EA 12.00 12.000.00$687.00$0.00
32REMOVE EXISTING DLC785.00LF 785.00 785.000.00$2.00$0.00
33REMOVE PULL BOX15.00EA 15.00 15.000.00$300.00$0.00
34REMOVE PULL BOX AND RESURFACE SIDEWALK24.00EA 24.00 24.000.00$1,700.00$0.00
35REMOVE CONTROLLER CABINET COMPLETE2.00EA 2.00 2.000.00$1,000.00$0.00
36REMOVE CONTROLLER CABINET FOUNDATION2.00EA 2.00 2.000.00$1,000.00$0.00
37REMOVE PPB POST (COMPLETE) (EXCL. FOUND.)1.00EA 1.00 1.000.00$400.00$0.00
38REMOVE SERVICE CABINET FOUNDATION1.00EA 1.00 1.000.00$1,000.00$0.00
39REMOVE SERVICE CABINET (COMPLETE)1.00EA 1.00 1.000.00$1,000.00$0.00
40REMOVE TYPE 1 STANDARD (COMPLETE) (EXCL. FOUND.)5.00EA 5.00 5.000.00$1,000.00$0.00
41REMOVE TYPE 17 STANDARD (COMPLETE) (EXCL. FOUND.)8.00EA 8.00 8.000.00$1,500.00$0.00
42REMOVE TYPE 19 STANDARD (COMPLETE) (EXCL. FOUND.)2.00EA 2.00 2.000.00$2,000.00$0.00
43REMOVE PPB FOUNDATION1.00EA 1.00 1.000.00$500.00$0.00
44REMOVE TYPE 1 FOUNDATION5.00EA 5.00 5.000.00$1,000.00$0.00
45REMOVE TYPE 17 FOUNDATION8.00EA 8.00 8.000.00$1,500.00$0.00
46REMOVE TYPE 19 FOUNDATION2.00EA 2.00 2.000.00$2,500.00$0.00
47RELOCATE PEDESTRIAN HEAD (COMPLETE)7.00EA 7.00 7.000.00$300.00$0.00
48RELOCATE RETRO REFLECTIVE STREET NAME SIGN 6.00EA 6.00 6.000.00$300.00$0.00
49TEMPORARY TYPE 1 STANDARD3.00EA 3.00 3.000.00$1,500.00$0.00
50TEMPORARY TYPE 17 STANDARD1.00EA 1.00 1.000.00$2,500.00$0.00
51TYPE 170 ATC/HC-11 CONTROLLER3.00EA 3.00 3.000.00$4,300.00$0.00
52SWITCH PACK22.00EA 22.00 22.000.00$219.00$0.00
53PED ISOLATION MODULE6.00EA 6.00 6.000.00$277.00$0.00
542-CHANNEL ILD SENSOR UNIT6.00EA 6.00 6.000.00$452.00$0.00
55GPS UTB UNIT AND ANTENNA3.00EA 3.00 3.000.00$1,800.00$0.00
56TYPE 332 CABINET2.00EA 2.00 2.000.00$19,400.00$0.00
57TYPE 332 CABINET FOUNDATION2.00EA 2.00 2.000.00$3,500.00$0.00
58TYPE III-BF SERVICE CABINET 2.00EA 2.00 2.000.00$6,700.00$0.00
59TYPE III-BF SERVICE CABINET FOUNDATION2.00EA 2.00 2.000.00$3,500.00$0.00
60TYPE III-BF SERVICE WITH BBS SERVICE CABINET1.00EA 1.00 1.000.00$16,900.00$0.00
61TYPE III-BF SERVICE CABINET WITH BBS FOUNDATION1.00EA 1.00 1.000.00$3,500.00$0.00
62PEDESTRIAN PUSH BUTTON POST3.00EA 3.00 3.000.00$900.00$0.00
63TYPE 1 STANDARD2.00EA 2.00 2.000.00$2,500.00$0.00
64TYPE 15 STANDARD3.00EA 3.00 3.000.00$5,000.00$0.00
65TYPE 15 STANDARD WITH MODIFIED 24' HIGH POLE2.00EA 2.00 2.000.00$5,300.00$0.00
66TYPE 24 STANDARD5.00EA 5.00 5.000.00$11,000.00$0.00
67TYPE 26 STANDARD3.00EA 3.00 3.000.00$12,800.00$0.00
68TYPE 26 STANDARD WITH MODIFIED 24' HIGH POLE2.00EA 2.00 2.000.00$13,000.00$0.00
69PEDESTRIAN PUSH BUTTON POST FOUNDATION3.00EA 3.00 3.000.00$1,500.00$0.00
70TYPE 1 STANDARD FOUNDATION2.00EA 2.00 2.000.00$2,700.00$0.00
71TYPE 15 STANDARD FOUNDATION5.00EA 5.00 5.000.00$3,600.00$0.00
72TYPE 24 STANDARD FOUNDATION5.00EA 5.00 5.000.00$6,600.00$0.00
73TYPE 26 STANDARD FOUNDATION5.00EA 5.00 5.000.00$8,100.00$0.00
7425' SIGNAL MAST ARM5.00EA 5.00 5.000.00$5,000.00$0.00
7530' SIGNAL MAST ARM1.00EA 1.00 1.000.00$5,200.00$0.00
7635' SIGNAL MAST ARM4.00EA 4.00 4.000.00$5,700.00$0.00
7712' HORIZONTAL LUMINAIRE MAST ARM5.00EA 5.00 5.000.00$1,900.00$0.00
7812' LUMINAIRE MAST ARM18.00EA 18.00 18.000.00$1,800.00$0.00
79LED LUMINAIRES (150W HPS EQUIVALENT)11.00EA 11.00 11.000.00$936.00$0.00
80PEDESTRIAN PUSH BUTTON15.00EA 15.00 15.000.00$296.00$0.00
81PEDESTRIAN PUSH BUTTON PLATE15.00EA 15.00 15.000.00$193.00$0.00
82LED COUNTDOWN PEDESTRIAN HEAD (COMPLETE)8.00EA 8.00 8.000.00$1,132.00$0.00
833-12" LED VEHICLE HEAD (COMPLETE) 38.00EA 38.00 38.000.00$1,410.00$0.00
848' STRAIGHT ARM CLAMP-ON FOR STREET NAME SIGN11.00EA 11.00 11.000.00$2,500.00$0.00
854-CAMERA VIDEO DETECTION SYSTEM (COMPLETE)1.00EA 1.00 1.000.00$50,100.00$0.00
864-CAMERA VIDEO/RADAR DETECTION SYSTEM (COMPLETE)2.00EA 2.00 2.000.00$48,200.00$0.00
87CAMERA MOUNT EXTENSION11.00EA 11.00 11.000.00$174.00$0.00
88DETAIL 21 (THERMOPLASTIC)10.00LF 0.00 0.000.00$3.00$0.00
89DETAIL 22 (THERMOPLASTIC)7.00LF 0.00 0.000.00$3.00$0.00
90DETAIL 38 (THERMOPLASTIC)410.00LF 410.00 410.000.00$3.00$0.00
91DETAIL 38A (THERMOPLASTIC)50.00LF 50.00 50.000.00$3.00$0.00
92DETAIL 39 (THERMOPLASTIC)10.00LF 10.00 10.000.00$3.00$0.00
934" STRIPING (THERMOPLASTIC)400.00LF 400.00 400.000.00$2.60$0.00
9412" STRIPING (THERMOPLASTIC)420.00LF 395.00 395.000.00$5.70$0.00
9524" STRIPING (THERMOPLASTIC)728.00LF 728.00 728.000.00$11.00$0.00
9624" STRIPING (THERMOPLASTIC)1,618.00LF 1,618.00 1,618.000.00$11.00$0.00
97PAVEMENT MARKINGS (THERMOPLASTIC)162.00SF 162.00 162.000.00$8.50$0.00
98REMOVE PAVEMENT MARKINGS (THERMOPLASTIC)165.00SF 105.00 105.000.00$10.00$0.00
99REMOVE STRIPING2,772.00LF 1,759.00 1,759.000.00$6.00$0.00
100SIGN PANEL4.00EA 4.00 4.000.00$390.00$0.00
101SIGN POST (ROADSIDE SIGN)1.00EA 0.00 0.000.00$325.00$0.00
102RELOCATE SIGN6.00EA 0.00 0.000.00$143.00$0.00
103CURB MARKINGS (ONE-COAT PAINT)30.00LF 0.00 0.000.00$6.00$0.00
104TRAFFIC CONTROL1.00LS 1.00 1.000.00$70,000.00$0.00
105CHANGEABLE MESSAGE SIGN (EACH)6.00MTH 6.00 6.000.00$2,800.00$0.00
S-2SUSPENSION OF CONSTRUCTION WORK 0 68.00 68.000.00$0.00$0.00
S-32" PVC CONDUIT (SCHEDULE 80) LF 75.00 75.000.00$82.00$0.00
S-43" PVC CONDUIT (SCHEDULE 80) LF 496.25 496.250.00$72.00$0.00
S-53" CONDUIT (SCHEDULE 80) LF 1,876.25 1,876.250.00$7.15$0.00
S-63 CONDUCTOR SIGNAL CABLE LF 1,702.50 1,702.500.00$4.90$0.00
S-75 CONDUCTOR SIGNAL CABLE LF 121.25 121.250.00$7.90$0.00
S-8WIRE #6 LF 1,041.25 1,041.250.00$3.90$0.00
S-9WIRE #10 LF 1,387.50 1,387.500.00$1.95$0.00
S-10MODIFY TRAFFIC SIGNAL POLE LS 1.00 1.000.00$5,900.00$0.00
S-11ADDITIONAL ADA CURB RAMP WORK  LS 1.00 1.000.00$40,000.00$0.00

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $1,523,046.39 $1,523,046.39 $0.00
Retained $76,152.32 $76,152.32 $0.00
Deducted $0.00 $0.00 $0.00
Due $1,446,894.07 $1,446,894.07 $0.00



*The term "As-Built" used by the Department of Public Works in combination with the Engineer's Monthly Estimate process indicates that the project has been field accepted and that the pay quantities and deductions as detailed above are FINAL. Unless a certified letter is received by this office within 14 calendar days disputing the amounts shown, an acceptance letter will be filed with the Board of Supervisors authorizing the release of retention.

Contact Office Engineer
Contractor Copy  
P Please consider the environment before printing this report.