| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 24.00 | MTH |
4.00
| 3.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.20
| 0.15 | 0.05 | $45,000.00 | $2,250.00 |
| 7 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.20
| 0.15 | 0.05 | $135,000.00 | $6,750.00 |
| 9 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
0.20
| 0.15 | 0.05 | $10,000.00 | $500.00 |
| 16 | OFFICE FACILITIES | 25.00 | MTH |
3.00
| 2.00 | 1.00 | $15,000.00 | $15,000.00 |
| 17 | MOBILIZATION | 1.00 | LS |
0.75
| 0.50 | 0.25 | $2,600,000.00 | $650,000.00 |
| 18 | TRAFFIC CONTROL | 1.00 | LS |
0.20
| 0.15 | 0.05 | $1,700,000.00 | $85,000.00 |
| 27 | CONCRETE REMOVAL (NON-REINFORCED) | 3,340.00 | CY |
843.00
| 741.00 | 102.00 | $240.00 | $24,480.00 |
| 29 | UNCLASSIFIED EXCAVATION | 23,912.00 | CY |
6,801.82
| 867.82 | 5,934.00 | $100.00 | $593,400.00 |
| 31 | CRUSHED MISCELLANEOUS BASE | 4,311.00 | CY |
1,279.17
| 802.17 | 477.00 | $235.00 | $112,095.00 |
| 32 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) | 301.00 | CY |
37.00
| 30.00 | 7.00 | $525.00 | $3,675.00 |
| 34 | AC PAVEMENT(PATCH BACK) | 4,524.00 | TON |
198.21
| 128.80 | 69.41 | $180.00 | $12,493.80 |
| 46 | PCC CURB, TYPE A1-8 | 11,021.00 | LF |
328.00
| 0.00 | 328.00 | $33.00 | $10,824.00 |
| 51 | PCC CURB & GUTTER, TYPE A3-6 | 235.00 | LF |
108.00
| 0.00 | 108.00 | $52.00 | $5,616.00 |
| 53 | PCC CURB & GUTTER, TYPE A3-VAR | 900.00 | LF |
800.00
| 0.00 | 800.00 | $48.00 | $38,400.00 |
| 57 | PCC WALK & DRIVEWAYS, 4" THICK | 38,431.00 | SF |
17,270.71
| 17,182.71 | 88.00 | $8.50 | $748.00 |
| 58 | PCC CURB RAMPS | 150.00 | CY |
66.94
| 64.37 | 2.57 | $1,200.00 | $3,084.00 |
| 60 | DETECTABLE WARNING SURFACE | 960.00 | SF |
264.00
| 252.00 | 12.00 | $60.00 | $720.00 |
| 73 | 3" CONDUIT (SCH 80 PVC) | 4,215.00 | LF |
2,046.00
| 1,953.00 | 93.00 | $100.00 | $9,300.00 |
| 75 | 2-PAIR DETECTOR LEAD-IN CABLE | 10,435.00 | LF |
2,896.00
| 0.00 | 2,896.00 | $4.50 | $13,032.00 |
| 76 | 12-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) | 9,685.00 | LF |
3,035.00
| 0.00 | 3,035.00 | $8.00 | $24,280.00 |
| 77 | 3-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) | 9,475.00 | LF |
2,553.00
| 0.00 | 2,553.00 | $5.00 | $12,765.00 |
| 78 | 5-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) | 3,300.00 | LF |
320.00
| 0.00 | 320.00 | $6.00 | $1,920.00 |
| 100 | REMOVE TYPE 19 FOUNDATION | 3.00 | EA |
1.00
| 0.00 | 1.00 | $2,550.00 | $2,550.00 |
| 101 | REMOVE TYPE 24 FOUNDATION | 1.00 | EA |
1.00
| 0.00 | 1.00 | $2,550.00 | $2,550.00 |
| 106 | RELOCATE TYPE 332 CABINET (COMPLETE) | 6.00 | EA |
1.00
| 0.00 | 1.00 | $4,000.00 | $4,000.00 |
| 206 | IRRIGATION SYSTEM | 1.00 | LS |
0.20
| 0.10 | 0.10 | $1,300,000.00 | $130,000.00 |
| 228 | PCC PAVEMENT (HIGH EARLY STRENGTH) | 456.00 | CY |
98.69
| 97.66 | 1.03 | $535.00 | $551.05 |
| 232 | #8 AWG, XHHW CU CONDUCTOR | 9,640.00 | LF |
329.00
| 0.00 | 329.00 | $2.35 | $773.15 |
| 240 | #10 WIRE | 23,740.00 | LF |
658.00
| 0.00 | 658.00 | $1.95 | $1,283.10 |
| 246 | COMPOSITE TYPE 2 PULL BOX INCL COVER | 27.00 | EA |
18.00
| 12.00 | 6.00 | $2,200.00 | $13,200.00 |
| 261 | 2 INCH DIAMETER NON-METALLIC PVC SCHEDULE 80 BRANCH CONDUIT, FITTINGS AND SUPPORTS | 5,124.00 | LF |
2,735.00
| 1,756.00 | 979.00 | $65.00 | $63,635.00 |
| 264 | SAWCUT AND REMOVE EXISTING ASPHALT CONCRETE (AC) | 4,063.00 | LF |
690.00
| 500.00 | 190.00 | $10.00 | $1,900.00 |
| 265 | UNCLASSIFIED EXCAVATION (TRENCH) | 591.00 | CY |
43.00
| 27.00 | 16.00 | $185.00 | $2,960.00 |
| S-1 | TEMPORARY TRAFFIC SIGNAL POLES | | T&M |
32,677.33
| 15,531.83 | 17,145.50 | $1.00 | $17,145.50 |
|