| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $2,500.00 | $2,500.00 |
| 4 | PREPARATION OF TWW WORKPLAN (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $2,500.00 | $2,500.00 |
| 5 | CLEARING AND GRUBBING | 1.00 | LS |
1.00
| 0.00 | 1.00 | $1,000.00 | $1,000.00 |
| 6 | UNCLASSIFIED EXCAVATION | 58.00 | CY |
58.00
| 0.00 | 58.00 | $80.00 | $4,640.00 |
| 7 | SHOULDER GRADING | 1,013.00 | LF |
1,013.00
| 0.00 | 1,013.00 | $40.00 | $40,520.00 |
| 8 | REMOVE AND DISPOSE OF EXISTING GUARDRAIL (INCLUDING POSTS) | 638.00 | LF |
638.00
| 0.00 | 638.00 | $50.00 | $31,900.00 |
| 9 | REMOVE AND SALVAGE EXISTING TEMPORARY BARRIER | 1.00 | LS |
1.00
| 0.00 | 1.00 | $20,000.00 | $20,000.00 |
| 11 | MIDWEST GUARDRAIL SYSTEM (STEEL POST W/ PLASTIC BLOCK) | 489.00 | LF |
489.00
| 0.00 | 489.00 | $500.00 | $244,500.00 |
| 12 | IN-LINE TERMINAL SYSTEM (TYPE MSKT-SP-MGS) | 7.00 | EA |
7.00
| 0.00 | 7.00 | $3,000.00 | $21,000.00 |
| 13 | END ANCHOR ASSEMBLY (TYPE SFT) | 1.00 | EA |
1.00
| 0.00 | 1.00 | $3,000.00 | $3,000.00 |
| 14 | MIDWEST GUARDRAIL SYSTEM (END CAP, TYPE B) | 1.00 | EA |
1.00
| 0.00 | 1.00 | $3,000.00 | $3,000.00 |
| 15 | TYPE E DELINEATOR (FLEXIBLE POST) CALTRANS STD PLAN A73C | 33.00 | EA |
33.00
| 0.00 | 33.00 | $100.00 | $3,300.00 |
| 16 | TRAFFIC CONTROL | 1.00 | LS |
1.00
| 0.00 | 1.00 | $50,000.00 | $50,000.00 |
| 17 | CHANGEABLE MESSAGE SIGN | 4.00 | EA |
6.00
| 0.00 | 6.00 | $4,000.00 | $24,000.00 |
| S-2 | UNFORESEEN BOULDER WORK | | LS |
1.00
| 0.00 | 1.00 | $26,500.00 | $26,500.00 |
| S-3 | TREATED WOOD WASTE (TRANSPORTATION & DISPOSAL) | | LB |
5,540.00
| 0.00 | 5,540.00 | $3.50 | $19,390.00 |
| S-4 | TIME EXTENSION (PUNCHLIST WORK) | | WD |
2.00
| 0.00 | 2.00 | $0.00 | $0.00 |