Los Angeles County Public Works
Project Management Division III
Progress Payment 12
Project Name: Olympic Boulevard TSSP - Indiana Street to Montebello Boulevard
Contractor: California Professional Engineering, Inc.
19062 San Jose Avenue
La Puente, CA 91748
Project ID: TSM0010287
Federal Number(s): None
Original Contract: $2,514,601.72
Awarded: 6/22/2023
Period Ending: 11/6/2025
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
3CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000)1.00LS 0.00 0.36-0.36$1,000.00($360.00)
5IMPLEMENTATION OF BMPS1.00LS 1.00 0.900.10$10,000.00$1,000.00
6IMPLEMENTATION OF THE LTWHP1.00LS 1.00 0.900.10$5,000.00$500.00
201-1/2" CONDUIT (SCH 80 PVC)10.00LF 10.00 0.0010.00$200.00$2,000.00
212" CONDUIT (SCH 80 PVC)140.00LF 140.00 92.0048.00$100.00$4,800.00
223" CONDUIT (SCH 80 PVC)1,115.00LF 1,115.00 1,007.00108.00$95.00$10,260.00
234" CONDUIT (SCH 80 PVC)270.00LF 270.00 166.00104.00$110.00$11,440.00
33TYPE III PULL BOX37.00EA 32.00 30.002.00$1,100.00$2,200.00
35REMOVE TYPE 332 CABINET5.00EA 4.00 3.001.00$500.00$500.00
45REMOVE VEHICLE HEAD (COMPLETE)117.00EA 117.00 116.001.00$150.00$150.00
49REMOVE PEDESTRIAN PUSH BUTTON PLATE31.00EA 30.00 23.007.00$10.00$70.00
50REMOVE TYPE 332 CABINET FOUNDATION5.00EA 4.00 3.001.00$2,200.00$2,200.00
61SALVAGE EQUIPMENT1.00LS 1.00 0.800.20$23,200.00$4,640.00
68TYPE 2070 CONTROLLER1.00EA 1.00 0.001.00$5,053.00$5,053.00
69D4 PROGRAM1.00EA 1.00 0.001.00$2,130.00$2,130.00
712070 7G GPS MODULE AND ANTENNA1.00EA 1.00 0.001.00$1,572.00$1,572.00
72CONFLICT MONITOR1.00EA 1.00 0.001.00$1,616.00$1,616.00
73SWITCH PACK76.00EA 64.00 40.0024.00$60.00$1,440.00
74PED ISOLATION MODULE19.00EA 17.00 10.007.00$115.00$805.00
752-CHANNEL ILD SENSOR UNIT29.00EA 24.00 10.0014.00$283.00$3,962.00
106PEDESTRIAN PUSH BUTTON PLATE96.00EA 45.00 41.004.00$25.00$100.00
114VIDEO/RADAR DETECTION SYSTEM WITH 17" LCD MONITOR DRAWER (COMPLETE) - OLYMPIC BL @ TELEGRAPH RD/AGUSTA AV1.00EA 1.00 0.001.00$70,000.00$70,000.00
132TRAFFIC CONTROL1.00LS 1.00 0.900.10$88,884.00$8,888.40
S-6TEMPORARY WIRING T&M 13,757.16 0.0013,757.16$1.00$13,757.16

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $2,141,967.40 $1,993,243.84 $148,723.56
Retained $107,098.39 $99,662.21 $7,436.18
Deducted $0.00 $0.00 $0.00
Due $2,034,869.01 $1,893,581.63 $141,287.38



Contact Office Engineer
Contractor Copy  
P Please consider the environment before printing this report.