| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 12.00 | MTH |
6.00
| 5.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.48
| 0.40 | 0.08 | $25,000.00 | $2,000.00 |
| 6 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.48
| 0.40 | 0.08 | $45,000.00 | $3,600.00 |
| 12 | OFFICE FACILITIES | 12.00 | MTH |
6.00
| 5.00 | 1.00 | $3,000.00 | $3,000.00 |
| 19 | CRUSHED MISCELLANEOUS BASE | 2,770.00 | CY |
1,323.35
| 1,064.35 | 259.00 | $110.00 | $28,490.00 |
| 21 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) | 306.00 | CY |
199.40
| 119.40 | 80.00 | $400.00 | $32,000.00 |
| 42 | 3" CONDUIT (SCH 80 PVC) | 15,544.00 | LF |
9,946.00
| 4,601.00 | 5,345.00 | $45.00 | $240,525.00 |
| 107 | TRAFFIC CONTROL | 1.00 | LS |
0.66
| 0.50 | 0.16 | $317,968.85 | $50,875.02 |
| 148 | LED LUMINAIRE (150W HPS EQUIVALENT) | 24.00 | EA |
24.00
| 0.00 | 24.00 | $340.00 | $8,160.00 |
| 149 | CONCRETE STREETLIGHT POLE | 24.00 | EA |
24.00
| 0.00 | 24.00 | $4,000.00 | $96,000.00 |
| 154 | PULL BOX TYPE 2 WITH COVER | 125.00 | EA |
36.00
| 26.00 | 10.00 | $750.00 | $7,500.00 |
| 155 | PULL BOX TYPE 3 WITH COVER | 13.00 | EA |
6.00
| 4.00 | 2.00 | $1,300.00 | $2,600.00 |
| 156 | NO. 8 CONDUCTORS | 77,600.00 | LF |
345.00
| 0.00 | 345.00 | $2.20 | $759.00 |
| 157 | NO. 10 CONDUCTORS | 980.00 | LF |
644.00
| 0.00 | 644.00 | $1.65 | $1,062.60 |
| 159 | INSTALL PEDESTRIAN LIGHT POLE | 74.00 | EA |
23.00
| 0.00 | 23.00 | $1,900.00 | $43,700.00 |
| 161 | 6' LUMINAIRE ARM (STREETLIGHTS) | 24.00 | EA |
24.00
| 0.00 | 24.00 | $400.00 | $9,600.00 |
| 163 | PEDESTRIAN STREET LIGHT POLE WITH POST TOP LUMINAIRE | 74.00 | EA |
74.00
| 0.00 | 74.00 | $4,400.00 | $325,600.00 |
| 174 | SURVEYING SERVICES | 1.00 | LS |
0.66
| 0.50 | 0.16 | $75,000.00 | $12,000.00 |