| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 24.00 | MTH |
7.00
| 6.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.35
| 0.30 | 0.05 | $45,000.00 | $2,250.00 |
| 16 | OFFICE FACILITIES | 25.00 | MTH |
7.00
| 5.00 | 2.00 | $15,000.00 | $30,000.00 |
| 18 | TRAFFIC CONTROL | 1.00 | LS |
0.35
| 0.30 | 0.05 | $1,700,000.00 | $85,000.00 |
| 21 | CLASS A TOPSOIL | 14,040.00 | CY |
6,680.00
| 6,360.00 | 320.00 | $80.00 | $25,600.00 |
| 27 | CONCRETE REMOVAL (NON-REINFORCED) | 3,340.00 | CY |
1,137.85
| 1,123.85 | 14.00 | $240.00 | $3,360.00 |
| 29 | UNCLASSIFIED EXCAVATION | 23,912.00 | CY |
11,106.31
| 10,523.31 | 583.00 | $100.00 | $58,300.00 |
| 31 | CRUSHED MISCELLANEOUS BASE | 4,311.00 | CY |
1,865.95
| 1,441.45 | 424.50 | $235.00 | $99,757.50 |
| 34 | AC PAVEMENT(PATCH BACK) | 4,524.00 | TON |
735.68
| 319.68 | 416.00 | $180.00 | $74,880.00 |
| 46 | PCC CURB, TYPE A1-8 | 11,021.00 | LF |
2,294.00
| 328.00 | 1,966.00 | $33.00 | $64,878.00 |
| 47 | PCC CURB, TYPE A1-VAR | 876.00 | LF |
349.00
| 249.00 | 100.00 | $40.00 | $4,000.00 |
| 51 | PCC CURB & GUTTER, TYPE A3-6 | 235.00 | LF |
235.00
| 108.00 | 127.00 | $52.00 | $6,604.00 |
| 72 | 2" CONDUIT (SCH 80 PVC) | 3,735.00 | LF |
2,007.00
| 1,987.00 | 20.00 | $70.00 | $1,400.00 |
| 73 | 3" CONDUIT (SCH 80 PVC) | 4,215.00 | LF |
2,979.00
| 2,887.00 | 92.00 | $100.00 | $9,200.00 |
| 145 | TYPE III-BF SERVICE CABINET FOUNDATION | 6.00 | EA |
5.00
| 3.00 | 2.00 | $3,225.00 | $6,450.00 |
| 205 | LANDSCAPING | 1.00 | LS |
0.08
| 0.03 | 0.05 | $575,000.00 | $28,750.00 |
| 206 | IRRIGATION SYSTEM | 1.00 | LS |
0.45
| 0.40 | 0.05 | $1,300,000.00 | $65,000.00 |
| 225 | TEMPORARY CONTROLLER AND CABINET | 3.00 | EA |
1.00
| 0.00 | 1.00 | $25,000.00 | $25,000.00 |
| 234 | RIVER ROCK PAVING, 6" THICK | 30,203.00 | SF |
7,617.25
| 0.00 | 7,617.25 | $15.25 | $116,163.06 |
| 247 | COMPOSITE TYPE 3 PULL BOX INCL COVER | 71.00 | EA |
40.00
| 35.00 | 5.00 | $2,650.00 | $13,250.00 |
| 259 | EDISON 3 INCH NON-METALLIC PVC SCHEDULE 80 WITH PULL TAPE, FITTINGS AND SUPPORTS | 821.00 | LF |
477.00
| 145.00 | 332.00 | $100.00 | $33,200.00 |
| 260 | PULL BOX, 17 INCH BY 30 INCH BY 12 INCH | 6.00 | EA |
4.00
| 2.00 | 2.00 | $575.00 | $1,150.00 |
| 261 | 2 INCH DIAMETER NON-METALLIC PVC SCHEDULE 80 BRANCH CONDUIT, FITTINGS AND SUPPORTS | 5,124.00 | LF |
2,755.00
| 2,735.00 | 20.00 | $65.00 | $1,300.00 |
| 262 | SERVICE PEDESTAL AND CONCRETE FOUNDATION | 6.00 | EA |
2.00
| 0.00 | 2.00 | $7,500.00 | $15,000.00 |
| 267 | RIVER ROCK PAVING, 4" THICK | 42,485.00 | SF |
14,455.50
| 7,090.00 | 7,365.50 | $17.00 | $125,213.50 |
| 270 | WELD TENON | 15.00 | EA |
3.00
| 0.00 | 3.00 | $3,700.00 | $11,100.00 |
| S-9 | OVERTIME FOR WEEKEND ACTIVITIES | | LS |
1.00
| 0.00 | 1.00 | $48,497.00 | $48,497.00 |
| S-10 | ADJUSTMENT FOR DRCV VALVE BOX PRICE DIFFERENCE | | LS |
0.50
| 0.00 | 0.50 | $6,145.00 | $3,072.50 |
|