| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 12.00 | MTH |
7.00
| 6.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.56
| 0.48 | 0.08 | $25,000.00 | $2,000.00 |
| 6 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.56
| 0.48 | 0.08 | $45,000.00 | $3,600.00 |
| 12 | OFFICE FACILITIES | 12.00 | MTH |
7.00
| 6.00 | 1.00 | $3,000.00 | $3,000.00 |
| 13 | MOBILIZATION | 1.00 | LS |
1.00
| 0.75 | 0.25 | $827,000.00 | $206,750.00 |
| 14 | CLEARING AND GRUBBING | 1.00 | LS |
0.66
| 0.33 | 0.33 | $30,000.00 | $9,900.00 |
| 15 | TREE REMOVAL (6"-12" DIAMETER) | 107.00 | EA |
94.00
| 88.00 | 6.00 | $350.00 | $2,100.00 |
| 16 | CONCRETE REMOVAL (NON-REINFORCED) | 1,477.00 | CY |
1,247.33
| 908.33 | 339.00 | $120.00 | $40,680.00 |
| 17 | CONCRETE REMOVAL (REINFORCED) | 22.00 | CY |
22.00
| 0.00 | 22.00 | $150.00 | $3,300.00 |
| 18 | UNCLASSIFIED EXCAVATION | 3,925.00 | CY |
1,956.33
| 1,466.33 | 490.00 | $135.00 | $66,150.00 |
| 19 | CRUSHED MISCELLANEOUS BASE | 2,770.00 | CY |
1,828.35
| 1,323.35 | 505.00 | $110.00 | $55,550.00 |
| 21 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) | 306.00 | CY |
209.40
| 199.40 | 10.00 | $400.00 | $4,000.00 |
| 24 | ADJUST MANHOLE | 7.00 | EA |
7.00
| 0.00 | 7.00 | $500.00 | $3,500.00 |
| 29 | PCC CURB & GUTTER, TYPE A2-8 | 5,084.00 | LF |
3,017.00
| 2,940.00 | 77.00 | $40.00 | $3,080.00 |
| 30 | PCC CURB & GUTTER, TYPE A2-VAR | 20.00 | LF |
25.00
| 20.00 | 5.00 | $150.00 | $750.00 |
| 32 | PCC WALK, 4" THICK | 52,563.00 | SF |
27,984.00
| 21,246.00 | 6,738.00 | $8.00 | $53,904.00 |
| 37 | WATERMETER VAULT | 4.00 | EA |
4.00
| 1.00 | 3.00 | $500.00 | $1,500.00 |
| 38 | 1-1/2" CONDUIT (SCH 80 PVC) | 498.00 | LF |
350.00
| 115.00 | 235.00 | $31.00 | $7,285.00 |
| 42 | 3" CONDUIT (SCH 80 PVC) | 15,544.00 | LF |
12,062.00
| 9,946.00 | 2,116.00 | $45.00 | $95,220.00 |
| 107 | TRAFFIC CONTROL | 1.00 | LS |
0.75
| 0.66 | 0.09 | $317,968.85 | $28,617.20 |
| 109 | IRRIGATION SYSTEM | 1.00 | LS |
0.75
| 0.66 | 0.09 | $485,000.00 | $43,650.00 |
| 110 | LITTER RECEPTACLE | 26.00 | EA |
26.00
| 0.00 | 26.00 | $1,250.00 | $32,500.00 |
| 118 | RECONSTRUCT CATCH BASIN | 4.00 | EA |
4.00
| 0.00 | 4.00 | $6,000.00 | $24,000.00 |
| 119 | PET WASTE STATION | 12.00 | EA |
12.00
| 0.00 | 12.00 | $480.00 | $5,760.00 |
| 122 | PCC LOCAL DEPRESSION | 4.00 | CY |
4.00
| 0.00 | 4.00 | $2,000.00 | $8,000.00 |
| 124 | RECONSTRUCT DRAINAGE STRUCTURE | 1.00 | EA |
1.00
| 0.00 | 1.00 | $5,000.00 | $5,000.00 |
| 146 | REMOVE TREE WELL | 127.00 | EA |
110.00
| 77.00 | 33.00 | $250.00 | $8,250.00 |
| 150 | LITTER RECEPTACLE INSTALLATION | 26.00 | EA |
11.00
| 0.00 | 11.00 | $250.00 | $2,750.00 |
| 151 | PET WASTE STATION INSTALLATION | 12.00 | EA |
2.00
| 0.00 | 2.00 | $450.00 | $900.00 |
| 152 | SERVICE CONNECTION (SCE) | 8.00 | EA |
8.00
| 1.00 | 7.00 | $1,000.00 | $7,000.00 |
| 153 | CONCRETE STREETLIGHT FOUNDATION (30"SQX48"DEEP) | 24.00 | EA |
24.00
| 0.00 | 24.00 | $1,500.00 | $36,000.00 |
| 158 | CONCRETE PEDESTRIAN LIGHT FOUNDATION | 74.00 | EA |
46.00
| 23.00 | 23.00 | $1,550.00 | $35,650.00 |
| 165 | REMOVE BUS SHELTER & REINSTALL AFTER CONSTRUCTION INCLUDING ELECTRICAL AND SIGNAGE | 1.00 | EA |
0.50
| 0.00 | 0.50 | $7,400.00 | $3,700.00 |
| 174 | SURVEYING SERVICES | 1.00 | LS |
0.75
| 0.66 | 0.09 | $75,000.00 | $6,750.00 |
| S-3 | RUBBER WALKWAY PCC CURB STEP | | LS |
1.00
| 0.00 | 1.00 | $49,990.00 | $49,990.00 |
|