| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 24.00 | MTH |
9.00
| 8.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.45
| 0.40 | 0.05 | $45,000.00 | $2,250.00 |
| 7 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.50
| 0.25 | 0.25 | $135,000.00 | $33,750.00 |
| 9 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
0.50
| 0.25 | 0.25 | $10,000.00 | $2,500.00 |
| 14 | IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN | 1.00 | LS |
0.50
| 0.00 | 0.50 | $15,000.00 | $7,500.00 |
| 15 | DISPOSAL OF LBP/LCP WASTE/DEBRIS | 1.00 | LS |
0.50
| 0.00 | 0.50 | $25,000.00 | $12,500.00 |
| 16 | OFFICE FACILITIES | 25.00 | MTH |
9.00
| 8.00 | 1.00 | $15,000.00 | $15,000.00 |
| 18 | TRAFFIC CONTROL | 1.00 | LS |
0.45
| 0.40 | 0.05 | $1,700,000.00 | $85,000.00 |
| 19 | CLEARING AND GRUBBING | 1.00 | LS |
0.50
| 0.25 | 0.25 | $100,000.00 | $25,000.00 |
| 20 | DECOMPOSED GRANITE MULCH | 22,238.00 | SF |
19,056.00
| 0.00 | 19,056.00 | $3.00 | $57,168.00 |
| 25 | TREE REMOVAL (13"-24" DIAMETER) | 87.00 | EA |
59.00
| 49.00 | 10.00 | $550.00 | $5,500.00 |
| 29 | UNCLASSIFIED EXCAVATION | 23,912.00 | CY |
11,405.26
| 11,192.09 | 213.17 | $100.00 | $21,317.00 |
| 33 | COLD MILL AC PAVEMENT (0 - 1-1/2") | 1,791,804.00 | SF |
58,160.00
| 0.00 | 58,160.00 | $0.35 | $20,356.00 |
| 36 | AC PAVEMENT(DIGOUTS) | 538.00 | TON |
323.75
| 0.00 | 323.75 | $385.00 | $124,643.75 |
| 38 | DOUBLE ADJUST MANHOLE | 21.00 | EA |
9.00
| 1.00 | 8.00 | $1,275.00 | $10,200.00 |
| 39 | PMAC PAVEMENT | 16,307.00 | TON |
4,641.89
| 0.00 | 4,641.89 | $130.00 | $603,445.70 |
| 40 | PMAC PAVEMENT (TEST STRIP) | 500.00 | TON |
500.00
| 0.00 | 500.00 | $200.00 | $100,000.00 |
| 73 | 3" CONDUIT (SCH 80 PVC) | 4,215.00 | LF |
4,109.00
| 3,869.00 | 240.00 | $100.00 | $24,000.00 |
| 75 | 2-PAIR DETECTOR LEAD-IN CABLE | 10,435.00 | LF |
6,331.00
| 2,896.00 | 3,435.00 | $4.50 | $15,457.50 |
| 76 | 12-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) | 9,685.00 | LF |
5,151.00
| 3,493.00 | 1,658.00 | $8.00 | $13,264.00 |
| 77 | 3-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) | 9,475.00 | LF |
4,484.00
| 2,932.00 | 1,552.00 | $5.00 | $7,760.00 |
| 78 | 5-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) | 3,300.00 | LF |
1,178.00
| 1,158.00 | 20.00 | $6.00 | $120.00 |
| 83 | REMOVE TYPE 1 STANDARD (COMPLETE) (EXCL. FOUND.) | 6.00 | EA |
1.00
| 0.00 | 1.00 | $670.00 | $670.00 |
| 93 | REMOVE VEHICLE HEAD (COMPLETE) | 6.00 | EA |
1.00
| 0.00 | 1.00 | $225.00 | $225.00 |
| 97 | 200 W EQ LED LUMINAIRE | 7.00 | EA |
2.00
| 0.00 | 2.00 | $1,600.00 | $3,200.00 |
| 106 | RELOCATE TYPE 332 CABINET (COMPLETE) | 6.00 | EA |
2.00
| 1.00 | 1.00 | $4,000.00 | $4,000.00 |
| 115 | FURNISH AND INSTALL 1" PVC SCHEDULE 40 | 1,805.00 | LF |
95.00
| 0.00 | 95.00 | $61.00 | $5,795.00 |
| 122 | FURNISH AND INSTALL 3" CONDUIT (SCH 40 PVC) | 6,405.00 | LF |
127.00
| 32.00 | 95.00 | $86.00 | $8,170.00 |
| 130 | LED LUMINAIRE (150W HPS EQUIVALENT) | 1.00 | EA |
2.00
| 1.00 | 1.00 | $1,275.00 | $1,275.00 |
| 131 | LED LUMINAIRE (250 W HPS EQUIVALENT) | 33.00 | EA |
19.00
| 15.00 | 4.00 | $1,560.00 | $6,240.00 |
| 141 | REMOVE TYPE 332 CABINET FOUNDATION | 5.00 | EA |
1.00
| 0.00 | 1.00 | $1,010.00 | $1,010.00 |
| 142 | REMOVE SERVICE CABINET FOUNDATION | 2.00 | EA |
1.00
| 0.00 | 1.00 | $1,010.00 | $1,010.00 |
| 149 | TYPE 1 STANDARD | 3.00 | EA |
1.00
| 0.00 | 1.00 | $2,420.00 | $2,420.00 |
| 157 | TYPE 26 STANDARD FOUNDATION | 14.00 | EA |
2.00
| 0.00 | 2.00 | $8,250.00 | $16,500.00 |
| 174 | 3-12" LED VEHICLE HEAD (COMPLETE) | 103.00 | EA |
16.00
| 15.00 | 1.00 | $1,900.00 | $1,900.00 |
| 193 | REMOVE DETAIL 22 (THERMOPLASTIC) | 85.00 | LF |
85.00
| 0.00 | 85.00 | $2.20 | $187.00 |
| 200 | REMOVE 12" STRIPING (THERMOPLASTIC) | 6,750.00 | LF |
1,094.50
| 0.00 | 1,094.50 | $3.30 | $3,611.85 |
| 204 | FURNISH AND PLANT 15 GALLON TREE | 187.00 | EA |
121.00
| 0.00 | 121.00 | $400.00 | $48,400.00 |
| 205 | LANDSCAPING | 1.00 | LS |
0.50
| 0.20 | 0.30 | $575,000.00 | $172,500.00 |
| 206 | IRRIGATION SYSTEM | 1.00 | LS |
0.50
| 0.45 | 0.05 | $1,300,000.00 | $65,000.00 |
| 211 | LED UPLIGHTS FOR MONUMENT SIGN | 12.00 | EA |
4.00
| 0.00 | 4.00 | $5,575.00 | $22,300.00 |
| 217 | RELOCATE TYPE III-BF SERVICE | 2.00 | EA |
1.00
| 0.00 | 1.00 | $1,000.00 | $1,000.00 |
| 221 | 8' STRAIGHT ARM CLAMP-ON FOR STREET NAME SIGN | 33.00 | EA |
13.00
| 10.00 | 3.00 | $2,600.00 | $7,800.00 |
| 224 | MONUMENT SIGN AND FOOTING | 2.00 | EA |
1.00
| 0.50 | 0.50 | $33,000.00 | $16,500.00 |
| 232 | #8 AWG, XHHW CU CONDUCTOR | 9,640.00 | LF |
1,979.00
| 329.00 | 1,650.00 | $2.35 | $3,877.50 |
| 234 | RIVER ROCK PAVING, 6" THICK | 30,203.00 | SF |
15,715.91
| 11,718.00 | 3,997.91 | $15.25 | $60,968.13 |
| 239 | #6 WIRE | 2,795.00 | LF |
1,374.00
| 606.00 | 768.00 | $4.00 | $3,072.00 |
| 240 | #10 WIRE | 23,740.00 | LF |
3,712.00
| 2,342.00 | 1,370.00 | $1.95 | $2,671.50 |
| 247 | COMPOSITE TYPE 3 PULL BOX INCL COVER | 71.00 | EA |
54.00
| 46.00 | 8.00 | $2,650.00 | $21,200.00 |
| 258 | RIVER ROCK COBBLE | 449.00 | TON |
321.00
| 0.00 | 321.00 | $215.00 | $69,015.00 |
| 267 | RIVER ROCK PAVING, 4" THICK | 42,485.00 | SF |
21,411.75
| 19,980.00 | 1,431.75 | $17.00 | $24,339.75 |
| 269 | RELOCATE RETROREFLECTIVE STREET NAME SIGN | 12.00 | EA |
8.00
| 5.00 | 3.00 | $1,100.00 | $3,300.00 |
| S-1 | TEMPORARY TRAFFIC SIGNAL POLES | | T&M |
84,448.10
| 52,924.54 | 31,523.56 | $1.00 | $31,523.56 |
| S-15 | FURNISH AND INSTALL WEED BARRIER | | T&M |
25,224.65
| 0.00 | 25,224.65 | $1.00 | $25,224.65 |
|