| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $2,000.00 | $0.00 |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 12.00 | MTH |
18.00
| 18.00 | 0.00 | $500.00 | $0.00 |
| 3 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
1.00
| 1.00 | 0.00 | $24,000.00 | $0.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $48,000.00 | $0.00 |
| 6 | OFFICE FACILITIES | 12.00 | MTH |
19.00
| 19.00 | 0.00 | $5,000.00 | $0.00 |
| 7 | MOBILIZATION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $879,000.00 | $0.00 |
| 8 | CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $1,500) | 1,500.00 | AL |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
| 9 | SCE WORK (ALLOWANCE OF $40,000) | 40,000.00 | AL |
9,858.15
| 9,858.15 | 0.00 | $1.00 | $0.00 |
| 10 | EXPLORATORY EXCAVATION OF UTILITIES (ALLOWANCE OF $45,000) | 45,000.00 | AL |
3,600.00
| 3,600.00 | 0.00 | $1.00 | $0.00 |
| 11 | TRAFFIC CONTROL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $329,000.00 | $0.00 |
| 12 | CLEARING AND GRUBBING | 1.00 | LS |
1.00
| 1.00 | 0.00 | $14,000.00 | $0.00 |
| 13 | ROOT PRUNE TREE (INCL ROOT CONTROL BARRIER) | 69.00 | EA |
67.00
| 67.00 | 0.00 | $660.00 | $0.00 |
| 14 | TREE REMOVAL (6"-12" DIAMETER) | 1.00 | EA |
3.00
| 3.00 | 0.00 | $700.00 | $0.00 |
| 15 | CROWN REDUCTION, TREE (1" - 12" DIAMETER) | 6.00 | EA |
6.00
| 6.00 | 0.00 | $210.00 | $0.00 |
| 16 | CROWN REDUCTION, TREE (13" - 24" DIAMETER) | 50.00 | EA |
48.00
| 48.00 | 0.00 | $580.00 | $0.00 |
| 17 | CROWN REDUCTION, TREE (25" + DIAMETER) | 13.00 | EA |
13.00
| 13.00 | 0.00 | $980.00 | $0.00 |
| 18 | CONCRETE REMOVAL (NON-REINFORCED) | 1,058.00 | CY |
1,058.00
| 1,058.00 | 0.00 | $250.00 | $0.00 |
| 19 | UNCLASSIFIED EXCAVATION | 8,399.00 | CY |
7,758.00
| 7,758.00 | 0.00 | $165.00 | $0.00 |
| 20 | CRUSHED MISCELLANEOUS BASE | 6,963.00 | CY |
5,838.00
| 5,838.00 | 0.00 | $85.00 | $0.00 |
| 21 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) | 98.00 | CY |
94.50
| 94.50 | 0.00 | $234.00 | $0.00 |
| 22 | COLD MILL AC PAVEMENT (0 - 1-1/2") | 646,644.00 | SF |
646,644.00
| 646,644.00 | 0.00 | $0.27 | $0.00 |
| 23 | COLD MILL AC PAVEMENT (> 1-1/2 - 3") | 171,376.00 | SF |
171,376.00
| 171,376.00 | 0.00 | $0.42 | $0.00 |
| 24 | AC PAVEMENT | 2,197.00 | TON |
2,197.00
| 2,197.00 | 0.00 | $200.00 | $0.00 |
| 25 | AC PAVEMENT(PATCH BACK) | 143.00 | TON |
173.00
| 173.00 | 0.00 | $214.00 | $0.00 |
| 26 | AC PAVEMENT(LEVELING COURSE) | 3,834.00 | TON |
3,653.00
| 3,653.00 | 0.00 | $152.00 | $0.00 |
| 27 | RECONSTRUCT MANHOLE | 10.00 | EA |
2.00
| 2.00 | 0.00 | $4,300.00 | $0.00 |
| 28 | DOUBLE ADJUST MANHOLE | 47.00 | EA |
62.00
| 62.00 | 0.00 | $1,200.00 | $0.00 |
| 29 | ASPHALT RUBBER HOT MIX | 8,362.00 | TON |
8,211.00
| 8,211.00 | 0.00 | $130.00 | $0.00 |
| 30 | ASPHALT RUBBER HOT MIX (TEST STRIP) | 500.00 | TON |
500.00
| 500.00 | 0.00 | $135.00 | $0.00 |
| 31 | PCC CURB, TYPE A1-6 | 411.00 | LF |
1,250.00
| 1,250.00 | 0.00 | $64.00 | $0.00 |
| 32 | PCC CURB, TYPE A1-VAR | 55.00 | LF |
55.00
| 55.00 | 0.00 | $64.00 | $0.00 |
| 33 | PCC CURB & GUTTER, TYPE A2-6 | 612.00 | LF |
573.00
| 573.00 | 0.00 | $72.00 | $0.00 |
| 34 | PCC CURB & GUTTER, TYPE A2-VAR | 2,101.00 | LF |
2,626.25
| 2,626.25 | 0.00 | $72.00 | $0.00 |
| 35 | PCC WALK & DRIVEWAYS, 4" THICK | 42,626.00 | SF |
51,379.50
| 51,379.50 | 0.00 | $14.00 | $0.00 |
| 36 | PCC CURB RAMPS | 112.00 | CY |
112.00
| 112.00 | 0.00 | $1,600.00 | $0.00 |
| 37 | DETECTABLE WARNING SURFACE | 947.00 | SF |
934.00
| 934.00 | 0.00 | $65.00 | $0.00 |
| 38 | CROSS GUTTER | 285.00 | CY |
303.00
| 303.00 | 0.00 | $740.00 | $0.00 |
| 39 | ALLEY INTERSECTION | 22.00 | CY |
24.00
| 24.00 | 0.00 | $825.00 | $0.00 |
| 40 | PCC CURB, TYPE B1-6 | 67.00 | LF |
0.00
| 0.00 | 0.00 | $64.00 | $0.00 |
| 41 | NO. 6 PULL BOX INCL PCC COVER | 6.00 | EA |
1.00
| 1.00 | 0.00 | $1,400.00 | $0.00 |
| 42 | REMOVE PLASTIC DELINEATORS, RAISED MARKERS, AND TRUNCATED DOMES | 18.00 | EA |
18.00
| 18.00 | 0.00 | $46.00 | $0.00 |
| 43 | REMOVE EXISTING FENCE | 55.00 | LF |
55.00
| 55.00 | 0.00 | $15.00 | $0.00 |
| 44 | PCC PAVEMENT | 52.00 | CY |
49.00
| 49.00 | 0.00 | $560.00 | $0.00 |
| 45 | 1" CONDUIT (SCH 80 PVC) | 74.00 | LF |
74.00
| 74.00 | 0.00 | $59.00 | $0.00 |
| 46 | 1-1/2" CONDUIT (SCH 80 PVC) | 50.00 | LF |
60.00
| 60.00 | 0.00 | $87.00 | $0.00 |
| 47 | 2" CONDUIT (SCH 80 PVC) | 101.00 | LF |
270.00
| 270.00 | 0.00 | $117.00 | $0.00 |
| 48 | 3" CONDUIT (SCH 80 PVC) | 960.00 | LF |
1,045.00
| 1,045.00 | 0.00 | $140.00 | $0.00 |
| 49 | 4" CONDUIT (SCH 80 PVC) | 24.00 | LF |
24.00
| 24.00 | 0.00 | $100.00 | $0.00 |
| 50 | 2-PAIR DETECTOR LEAD-IN CABLE | 3,959.00 | LF |
4,410.00
| 4,410.00 | 0.00 | $3.00 | $0.00 |
| 51 | INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT | 110.00 | LF |
4,850.00
| 4,850.00 | 0.00 | $16.00 | $0.00 |
| 52 | REMOVE TYPE 332 CABINET | 1.00 | EA |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
| 53 | REMOVE TYPE 1 STANDARD (COMPLETE) (EXCL. FOUND.) | 1.00 | EA |
1.00
| 1.00 | 0.00 | $620.00 | $0.00 |
| 54 | REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.) | 3.00 | EA |
3.00
| 3.00 | 0.00 | $1,500.00 | $0.00 |
| 55 | REMOVE TYPE 19 STANDARD (COMPLETE) (EXCL. FOUND.) | 1.00 | EA |
1.00
| 1.00 | 0.00 | $1,900.00 | $0.00 |
| 56 | REMOVE LUMINAIRE | 15.00 | EA |
15.00
| 15.00 | 0.00 | $210.00 | $0.00 |
| 57 | REMOVE VEHICLE HEAD (COMPLETE) | 10.00 | EA |
10.00
| 10.00 | 0.00 | $213.00 | $0.00 |
| 58 | REMOVE PEDESTRIAN HEAD (COMPLETE) | 3.00 | EA |
3.00
| 3.00 | 0.00 | $214.00 | $0.00 |
| 59 | REMOVE PEDESTRIAN PUSH BUTTON | 6.00 | EA |
6.00
| 6.00 | 0.00 | $100.00 | $0.00 |
| 60 | REMOVE STREET LIGHT | 2.00 | EA |
2.00
| 2.00 | 0.00 | $1,500.00 | $0.00 |
| 61 | REMOVE TYPE 1 FOUNDATION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $1,100.00 | $0.00 |
| 62 | REMOVE TYPE 15 FOUNDATION | 3.00 | EA |
3.00
| 3.00 | 0.00 | $2,100.00 | $0.00 |
| 63 | REMOVE TYPE 19 FOUNDATION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $2,200.00 | $0.00 |
| 64 | REMOVE RCTB ANTENNA AND CABLE | 1.00 | EA |
1.00
| 1.00 | 0.00 | $600.00 | $0.00 |
| 65 | TYPE 2070 CONTROLLER | 2.00 | EA |
2.00
| 2.00 | 0.00 | $15,000.00 | $0.00 |
| 66 | GPS UTB UNIT AND ANTENNA | 2.00 | EA |
2.00
| 2.00 | 0.00 | $2,000.00 | $0.00 |
| 67 | 2-CHANNEL ILD SENSOR UNIT | 4.00 | EA |
4.00
| 4.00 | 0.00 | $300.00 | $0.00 |
| 68 | TYPE 332 CABINET | 1.00 | EA |
1.00
| 1.00 | 0.00 | $37,000.00 | $0.00 |
| 69 | TYPE III-BF SERVICE CABINET | 2.00 | EA |
2.00
| 2.00 | 0.00 | $12,000.00 | $0.00 |
| 70 | TYPE 1 STANDARD | 1.00 | EA |
1.00
| 1.00 | 0.00 | $2,200.00 | $0.00 |
| 71 | TYPE 15 STANDARD | 3.00 | EA |
3.00
| 3.00 | 0.00 | $7,000.00 | $0.00 |
| 72 | TYPE 19 STANDARD | 1.00 | EA |
1.00
| 1.00 | 0.00 | $15,000.00 | $0.00 |
| 73 | INSTALL TYPE 15 STANDARD | 1.00 | EA |
1.00
| 1.00 | 0.00 | $3,000.00 | $0.00 |
| 74 | TYPE 1 STANDARD FOUNDATION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $2,200.00 | $0.00 |
| 75 | TYPE 15 STANDARD FOUNDATION | 3.00 | EA |
4.00
| 4.00 | 0.00 | $3,100.00 | $0.00 |
| 76 | TYPE 19 STANDARD FOUNDATION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $7,000.00 | $0.00 |
| 77 | 30' SIGNAL MAST ARM | 1.00 | EA |
1.00
| 1.00 | 0.00 | $5,100.00 | $0.00 |
| 78 | 12' LUMINAIRE MAST ARM | 4.00 | EA |
4.00
| 4.00 | 0.00 | $1,900.00 | $0.00 |
| 79 | 8' LUMINAIRE MAST ARM | 1.00 | EA |
1.00
| 1.00 | 0.00 | $1,400.00 | $0.00 |
| 80 | PEDESTRIAN PUSH BUTTON | 10.00 | EA |
10.00
| 10.00 | 0.00 | $2,800.00 | $0.00 |
| 81 | PEDESTRIAN PUSH BUTTON POST | 4.00 | EA |
4.00
| 4.00 | 0.00 | $2,900.00 | $0.00 |
| 82 | DOUBLE FACE RETROREFLECTIVE STREET NAME SIGN | 2.00 | EA |
2.00
| 2.00 | 0.00 | $1,500.00 | $0.00 |
| 83 | 3-12" LED VEHICLE HEAD (COMPLETE) | 12.00 | EA |
12.00
| 12.00 | 0.00 | $1,600.00 | $0.00 |
| 84 | 5-12" LED VEHICLE HEAD (COMPLETE) | 1.00 | EA |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| 85 | 3-SECTION PV LED VEHICLE HEAD (COMPLETE) | 1.00 | EA |
1.00
| 1.00 | 0.00 | $5,300.00 | $0.00 |
| 86 | 4-SECTION PV LED VEHICLE HEAD (COMPLETE) | 2.00 | EA |
2.00
| 2.00 | 0.00 | $6,000.00 | $0.00 |
| 87 | LED PEDESTRIAN HEAD (COMPLETE) | 2.00 | EA |
2.00
| 2.00 | 0.00 | $1,700.00 | $0.00 |
| 88 | DETAIL 22 (THERMOPLASTIC) | 8,984.00 | LF |
8,329.00
| 8,329.00 | 0.00 | $2.00 | $0.00 |
| 89 | DETAIL 25 (THERMOPLASTIC) | 541.00 | LF |
520.00
| 520.00 | 0.00 | $1.00 | $0.00 |
| 90 | DETAIL 29 (THERMOPLASTIC) | 1,181.00 | LF |
541.00
| 541.00 | 0.00 | $2.00 | $0.00 |
| 91 | DETAIL 32 (THERMOPLASTIC) | 8,127.00 | LF |
3,576.00
| 3,576.00 | 0.00 | $2.00 | $0.00 |
| 92 | DETAIL 38 (THERMOPLASTIC) | 1,758.00 | LF |
1,888.00
| 1,888.00 | 0.00 | $2.00 | $0.00 |
| 93 | DETAIL 39 (THERMOPLASTIC) | 7,728.00 | LF |
8,252.00
| 8,252.00 | 0.00 | $1.00 | $0.00 |
| 94 | DETAIL 40 (THERMOPLASTIC) | 208.00 | LF |
220.00
| 220.00 | 0.00 | $1.00 | $0.00 |
| 95 | DETAIL 9 (THERMOPLASTIC) | 12,030.00 | LF |
13,337.00
| 13,337.00 | 0.00 | $1.00 | $0.00 |
| 96 | DETAIL 38A (THERMOPLASTIC) | 770.00 | LF |
742.00
| 742.00 | 0.00 | $2.00 | $0.00 |
| 97 | DETAIL 39A (THERMOPLASTIC) | 10,340.00 | LF |
9,650.00
| 9,650.00 | 0.00 | $1.00 | $0.00 |
| 98 | DETAIL 27B (THERMOPLASTIC) | 6,781.00 | LF |
7,034.00
| 7,034.00 | 0.00 | $1.00 | $0.00 |
| 99 | DETAIL 37B (THERMOPLASTIC) | 1,076.00 | LF |
802.00
| 802.00 | 0.00 | $2.00 | $0.00 |
| 100 | PAVEMENT MARKINGS (THERMOPLASTIC) | 26,125.00 | SF |
17,488.00
| 17,488.00 | 0.00 | $4.00 | $0.00 |
| 101 | 12" STRIPING (THERMOPLASTIC) | 1,133.00 | LF |
1,097.00
| 1,097.00 | 0.00 | $3.00 | $0.00 |
| 102 | 8" STRIPING (THERMOPLASTIC) | 3,093.00 | LF |
2,978.00
| 2,978.00 | 0.00 | $3.00 | $0.00 |
| 103 | CURB MARKINGS (ONE-COAT PAINT) | 854.00 | LF |
1,000.00
| 1,000.00 | 0.00 | $2.00 | $0.00 |
| 104 | REMOVE STRIPING AND MARKINGS (THERMOPLASTIC) | 705.00 | SF |
705.00
| 705.00 | 0.00 | $5.00 | $0.00 |
| 105 | INSTALL FIRE HYDRANT LOCATION RPM | 40.00 | EA |
22.00
| 22.00 | 0.00 | $15.00 | $0.00 |
| 106 | SIGN PANEL | 88.00 | EA |
51.00
| 51.00 | 0.00 | $125.00 | $0.00 |
| 107 | RELOCATE SIGN | 99.00 | EA |
20.00
| 20.00 | 0.00 | $75.00 | $0.00 |
| 108 | REMOVE SIGN | 10.00 | EA |
3.00
| 3.00 | 0.00 | $75.00 | $0.00 |
| 109 | REMOVE SIGN POST | 7.00 | EA |
7.00
| 7.00 | 0.00 | $75.00 | $0.00 |
| 110 | RELOCATE SIGN POST | 59.00 | EA |
18.00
| 18.00 | 0.00 | $150.00 | $0.00 |
| 111 | REMOVE PULL BOX | 12.00 | EA |
13.00
| 13.00 | 0.00 | $300.00 | $0.00 |
| 112 | INSTALL STREET LIGHT AND FOUNDATION | 8.00 | EA |
8.00
| 8.00 | 0.00 | $5,200.00 | $0.00 |
| 113 | REMOVE STREET LIGHT FOUNDATION | 2.00 | EA |
2.00
| 2.00 | 0.00 | $2,500.00 | $0.00 |
| 114 | STREET LIGHTING STANDARD (COMPLETE) | 8.00 | EA |
8.00
| 8.00 | 0.00 | $6,300.00 | $0.00 |
| 115 | CONCRETE STREET LIGHT FOUNDATION (30" SQ X 48" DEEP) | 8.00 | EA |
8.00
| 8.00 | 0.00 | $2,300.00 | $0.00 |
| 116 | 100 W EQ LED LUMINAIRE | 8.00 | EA |
8.00
| 8.00 | 0.00 | $700.00 | $0.00 |
| 117 | LED LUMINAIRES (100W HPS EQUIVALENT) | 2.00 | EA |
2.00
| 2.00 | 0.00 | $810.00 | $0.00 |
| 118 | LED LUMINAIRES (150W HPS EQUIVALENT) | 12.00 | EA |
12.00
| 12.00 | 0.00 | $940.00 | $0.00 |
| 119 | LED LUMINAIRES (200W HPS EQUIVALENT) | 2.00 | EA |
2.00
| 2.00 | 0.00 | $1,300.00 | $0.00 |
| 120 | LED LUMINAIRES (250W HPS EQUIVALENT) | 2.00 | EA |
2.00
| 2.00 | 0.00 | $1,400.00 | $0.00 |
| 121 | LED LUMINAIRE (200W HPS EQUIVALENT) | 2.00 | EA |
2.00
| 2.00 | 0.00 | $1,500.00 | $0.00 |
| 122 | ELECTRICAL WORK | 1.00 | LS |
1.00
| 1.00 | 0.00 | $73,000.00 | $0.00 |
| 123 | SERVICE PEDESTAL AND CONCRETE FOUNDATION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $12,000.00 | $0.00 |
| 124 | REWIRE INTERSECTION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $25,000.00 | $0.00 |
| 125 | TYPE 2 COMPOSITE PULL BOX INCLUDING COVER | 3.00 | EA |
4.00
| 4.00 | 0.00 | $2,100.00 | $0.00 |
| 126 | TYPE 3 COMPOSITE PULL BOX INCLUDING COVER | 12.00 | EA |
14.00
| 14.00 | 0.00 | $2,400.00 | $0.00 |
| 127 | GREEN COLORED PAVEMENT MARKING | 9,684.00 | SF |
2,952.00
| 2,952.00 | 0.00 | $9.00 | $0.00 |
| 128 | REMOVE EXISTING SERVICE METER | 2.00 | EA |
2.00
| 2.00 | 0.00 | $1,200.00 | $0.00 |
| 129 | LONGITUDINAL GUTTER | 324.00 | LF |
284.00
| 284.00 | 0.00 | $98.00 | $0.00 |
| 130 | PARKWAY DRAIN | 20.00 | LF |
20.00
| 20.00 | 0.00 | $1,300.00 | $0.00 |
| 131 | SIGN POST (ROADSIDE SIGN) | 35.00 | EA |
48.00
| 48.00 | 0.00 | $150.00 | $0.00 |
| 132 | RED BRICK PAVING WITH MORTAR | 9.00 | SF |
9.00
| 9.00 | 0.00 | $84.00 | $0.00 |
| 133 | PULL BOX TYPE 2 POLYMER CONCRETE AND COVER ASSEMBLY | 9.00 | EA |
9.00
| 9.00 | 0.00 | $2,200.00 | $0.00 |
| 134 | #10 WIRE | 1,320.00 | LF |
1,320.00
| 1,320.00 | 0.00 | $1.00 | $0.00 |
| 135 | BALL VALVE, 40 PSI WWP, 1" | 1.00 | EA |
1.00
| 1.00 | 0.00 | $500.00 | $0.00 |
| 136 | WATER METER + IRRIGATION POC | 1.00 | EA |
1.00
| 1.00 | 0.00 | $9,000.00 | $0.00 |
| 137 | RAIN SENSOR | 1.00 | EA |
1.00
| 1.00 | 0.00 | $700.00 | $0.00 |
| 138 | QUICK COUPLER | 1.00 | EA |
1.00
| 1.00 | 0.00 | $710.00 | $0.00 |
| 139 | 1.5" BACKFLOW PREVENTER DEVICE, INCLUDING CONCRETE PAD, ENCLOSURE, WYE STRAINER AND PRESSURE REGULATOR | 1.00 | EA |
1.00
| 1.00 | 0.00 | $7,000.00 | $0.00 |
| 140 | FLOW SENSOR ASSEMBLY, INCLUDING VALVE BOX AND WIRING TO CONTROLLER | 1.00 | EA |
1.00
| 1.00 | 0.00 | $2,000.00 | $0.00 |
| 141 | REMOTE CONTROL MASTER VALVE ASSEMBLY, LINE SIZE | 1.00 | EA |
1.00
| 1.00 | 0.00 | $900.00 | $0.00 |
| 142 | 1/2" SUBSURFACE DRIP TUBING | 1,254.00 | LF |
1,254.00
| 1,254.00 | 0.00 | $2.00 | $0.00 |
| 143 | 1-1/2" DRIP IRRIGATION REMOTE CONTROL VALVE | 1.00 | EA |
1.00
| 1.00 | 0.00 | $900.00 | $0.00 |
| 144 | CONTROLLER CABINET, PEDESTAL MOUNT, 8 STATION | 1.00 | EA |
1.00
| 1.00 | 0.00 | $13,000.00 | $0.00 |
| 145 | PVC SCHEDULE 40 MAINLINE LINE 1-1/2" | 300.00 | LF |
380.00
| 380.00 | 0.00 | $8.00 | $0.00 |
| 146 | PVC SCHEDULE 40 LATERAL LINE 3/4" | 100.00 | LF |
100.00
| 100.00 | 0.00 | $6.00 | $0.00 |
| 147 | PVC CLASS 200 PIPE SLEEVE 4" | 538.00 | LF |
538.00
| 538.00 | 0.00 | $26.00 | $0.00 |
| 148 | 1 GALLON SHRUB MATERIAL | 80.00 | EA |
80.00
| 80.00 | 0.00 | $16.00 | $0.00 |
| 149 | FURNISH AND PLANT 5 GALLON SHRUBS | 86.00 | EA |
86.00
| 86.00 | 0.00 | $33.00 | $0.00 |
| 150 | 3/4" DECORATIVE PEA GRAVEL | 170.00 | SF |
170.00
| 170.00 | 0.00 | $6.00 | $0.00 |
| 151 | 3" LAYER WOOD BARK MULCH | 780.00 | SF |
780.00
| 780.00 | 0.00 | $1.00 | $0.00 |
| 152 | EXISTING TURF REPAIR/ REPLACE | 3,618.00 | SF |
3,618.00
| 3,618.00 | 0.00 | $2.00 | $0.00 |
| 153 | TREE PROTECTION FENCING | 9.00 | EA |
0.00
| 0.00 | 0.00 | $500.00 | $0.00 |
| 154 | TREE PROTECTION MATERIAL | 9.00 | EA |
0.00
| 0.00 | 0.00 | $300.00 | $0.00 |
| 155 | RIVER ROCK PAVING | 2,854.00 | SF |
3,134.00
| 3,134.00 | 0.00 | $17.00 | $0.00 |
| 156 | AGRONOMIC SOIL REPORT | 1.00 | EA |
1.00
| 1.00 | 0.00 | $510.00 | $0.00 |
| 157 | IMPORT CLASS A TOPSOIL | 46.00 | CY |
46.00
| 46.00 | 0.00 | $86.00 | $0.00 |
| 158 | STEEL LANDSCAPE EDGING | 140.00 | LF |
150.00
| 150.00 | 0.00 | $17.00 | $0.00 |
| 159 | DECOMPOSED GRANITE, 3" THICK | 115.00 | SF |
265.00
| 265.00 | 0.00 | $5.00 | $0.00 |
| S-1 | FOUNDATIONS FOR CABINETS/PUSH BUTTONS | | LS |
1.00
| 1.00 | 0.00 | $11,500.00 | $0.00 |
| S-2 | ADDITIONAL TRAFFIC CONTROL (DIGOUT AREAS) | | LS |
1.00
| 1.00 | 0.00 | $19,950.00 | $0.00 |
| S-3 | PCC CURB & GUTTER; W-12", TYPE B3-4 | | LF |
205.00
| 205.00 | 0.00 | $72.00 | $0.00 |
| S-4 | ADDITIONAL TRAFFIC CONTROL | | LS |
0.00
| 0.00 | 0.00 | $11,950.00 | $0.00 |
| S-5 | TYPE 15 STANDARD | | EA |
1.00
| 1.00 | 0.00 | $6,850.00 | $0.00 |
| S-6 | PEDESTRIAN PUSH BUTTON POST | | EA |
1.00
| 1.00 | 0.00 | $2,850.00 | $0.00 |
| S-7 | ADDITIONAL LANDSCAPE & CONCRETE WORK | | T&M |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
| S-8 | ADDITIONAL DELAY COSTS | | T&M |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
| S-9 | TREE REMOVAL (13"-24" DIAMETER) | | EA |
67.00
| 67.00 | 0.00 | $1,600.00 | $0.00 |
| S-10 | TREE REMOVAL (25 " + DIAMETER | | EA |
32.00
| 32.00 | 0.00 | $3,200.00 | $0.00 |
| S-11 | FURNISH AND PLANT 24 " BOX TREE | | EA |
109.00
| 109.00 | 0.00 | $710.00 | $0.00 |
| S-12 | FURNISH AND INSTALL TREE WATERING BAG | | EA |
0.00
| 0.00 | 0.00 | $40.00 | $0.00 |
| S-13 | TREE MAINTENANCE (90 DAY PERIOD) | | LS |
1.00
| 1.00 | 0.00 | $23,000.00 | $0.00 |
| S-14 | IMPLEMENTATION OF BMPS | | LS |
1.00
| 1.00 | 0.00 | $9,000.00 | $0.00 |
| S-15 | ADDITIONAL MOBILIZATION, CLEAN UP, ETC. | | LS |
1.00
| 1.00 | 0.00 | $116,574.00 | $0.00 |
| S-16 | ADDITIONAL TRAFFIC CONTROL (CONCRETE AND LANDSCAPE) | | LS |
1.00
| 1.00 | 0.00 | $97,000.00 | $0.00 |
| S-17 | CLEARING AND GRUBBING | | LS |
1.00
| 1.00 | 0.00 | $2,500.00 | $0.00 |
| S-18 | CONCRETE REMOVAL (NON-REINFORCED | | CY |
310.00
| 310.00 | 0.00 | $410.00 | $0.00 |
| S-19 | UNCLASSIFIED EXCAVATION | | CY |
232.50
| 232.50 | 0.00 | $300.00 | $0.00 |
| S-20 | CRUSHED MISCELLANEOUS BASE | | CY |
188.00
| 188.00 | 0.00 | $350.00 | $0.00 |
| S-21 | PCC WALK AND DRIVEWAYS, 4" THICK | | SF |
3,609.00
| 3,609.00 | 0.00 | $32.00 | $0.00 |
| S-22 | PCC CURB AND GUTTER, TYPE A2-VAR | | LF |
1,295.75
| 1,295.75 | 0.00 | $142.00 | $0.00 |
| S-23 | PETROMAT REMOVAL DISPOSAL FEE | | LS |
1.00
| 1.00 | 0.00 | $4,242.00 | $0.00 |
| S-24 | FURNISH AND INSTALL K71 BOLLARDS - WHITE | | EA |
10.00
| 10.00 | 0.00 | $365.00 | $0.00 |
| S-25 | LAYOUT ABD INSTALL 4" THERMOPLASTIC YELLOW STRIPE | | LF |
20.00
| 20.00 | 0.00 | $1.25 | $0.00 |
|