Los Angeles County Public Works
Project Management Division III
As-Built 18
Project Name: West Whittier Los Nietos Mines Boulevard et al
Contractor: Excel Paving Company
2230 Lemon Avenue
Long Beach, CA 90806-5195
Project ID: RMD4403002
Federal Number(s): None
Original Contract: $8,974,979.80
Awarded: 7/15/2024
Period Ending: 4/14/2026
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
1CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,000)1.00LS 1.00 1.000.00$2,000.00$0.00
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)12.00MTH 18.00 18.000.00$500.00$0.00
3CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000)1.00LS 1.00 1.000.00$1,000.00$0.00
4IMPLEMENTATION OF THE LTWHP1.00LS 1.00 1.000.00$24,000.00$0.00
5IMPLEMENTATION OF BMPS1.00LS 1.00 1.000.00$48,000.00$0.00
6OFFICE FACILITIES12.00MTH 19.00 19.000.00$5,000.00$0.00
7MOBILIZATION1.00LS 1.00 1.000.00$879,000.00$0.00
8CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $1,500)1,500.00AL 0.00 0.000.00$1.00$0.00
9SCE WORK (ALLOWANCE OF $40,000)40,000.00AL 9,858.15 9,858.150.00$1.00$0.00
10EXPLORATORY EXCAVATION OF UTILITIES (ALLOWANCE OF $45,000)45,000.00AL 3,600.00 3,600.000.00$1.00$0.00
11TRAFFIC CONTROL1.00LS 1.00 1.000.00$329,000.00$0.00
12CLEARING AND GRUBBING1.00LS 1.00 1.000.00$14,000.00$0.00
13ROOT PRUNE TREE (INCL ROOT CONTROL BARRIER)69.00EA 67.00 67.000.00$660.00$0.00
14TREE REMOVAL (6"-12" DIAMETER)1.00EA 3.00 3.000.00$700.00$0.00
15CROWN REDUCTION, TREE (1" - 12" DIAMETER)6.00EA 6.00 6.000.00$210.00$0.00
16CROWN REDUCTION, TREE (13" - 24" DIAMETER)50.00EA 48.00 48.000.00$580.00$0.00
17CROWN REDUCTION, TREE (25" + DIAMETER)13.00EA 13.00 13.000.00$980.00$0.00
18CONCRETE REMOVAL (NON-REINFORCED)1,058.00CY 1,058.00 1,058.000.00$250.00$0.00
19UNCLASSIFIED EXCAVATION8,399.00CY 7,758.00 7,758.000.00$165.00$0.00
20CRUSHED MISCELLANEOUS BASE6,963.00CY 5,838.00 5,838.000.00$85.00$0.00
21TRENCH BACKFILL SLURRY (CLASS 270-E-500)98.00CY 94.50 94.500.00$234.00$0.00
22COLD MILL AC PAVEMENT (0 - 1-1/2")646,644.00SF 646,644.00 646,644.000.00$0.27$0.00
23COLD MILL AC PAVEMENT (> 1-1/2 - 3")171,376.00SF 171,376.00 171,376.000.00$0.42$0.00
24AC PAVEMENT2,197.00TON 2,197.00 2,197.000.00$200.00$0.00
25AC PAVEMENT(PATCH BACK)143.00TON 173.00 173.000.00$214.00$0.00
26AC PAVEMENT(LEVELING COURSE)3,834.00TON 3,653.00 3,653.000.00$152.00$0.00
27RECONSTRUCT MANHOLE10.00EA 2.00 2.000.00$4,300.00$0.00
28DOUBLE ADJUST MANHOLE47.00EA 62.00 62.000.00$1,200.00$0.00
29ASPHALT RUBBER HOT MIX8,362.00TON 8,211.00 8,211.000.00$130.00$0.00
30ASPHALT RUBBER HOT MIX (TEST STRIP)500.00TON 500.00 500.000.00$135.00$0.00
31PCC CURB, TYPE A1-6411.00LF 1,250.00 1,250.000.00$64.00$0.00
32PCC CURB, TYPE A1-VAR55.00LF 55.00 55.000.00$64.00$0.00
33PCC CURB & GUTTER, TYPE A2-6612.00LF 573.00 573.000.00$72.00$0.00
34PCC CURB & GUTTER, TYPE A2-VAR2,101.00LF 2,626.25 2,626.250.00$72.00$0.00
35PCC WALK & DRIVEWAYS, 4" THICK42,626.00SF 51,379.50 51,379.500.00$14.00$0.00
36PCC CURB RAMPS112.00CY 112.00 112.000.00$1,600.00$0.00
37DETECTABLE WARNING SURFACE947.00SF 934.00 934.000.00$65.00$0.00
38CROSS GUTTER285.00CY 303.00 303.000.00$740.00$0.00
39ALLEY INTERSECTION22.00CY 24.00 24.000.00$825.00$0.00
40PCC CURB, TYPE B1-667.00LF 0.00 0.000.00$64.00$0.00
41NO. 6 PULL BOX INCL PCC COVER6.00EA 1.00 1.000.00$1,400.00$0.00
42REMOVE PLASTIC DELINEATORS, RAISED MARKERS, AND TRUNCATED DOMES18.00EA 18.00 18.000.00$46.00$0.00
43REMOVE EXISTING FENCE55.00LF 55.00 55.000.00$15.00$0.00
44PCC PAVEMENT52.00CY 49.00 49.000.00$560.00$0.00
451" CONDUIT (SCH 80 PVC)74.00LF 74.00 74.000.00$59.00$0.00
461-1/2" CONDUIT (SCH 80 PVC)50.00LF 60.00 60.000.00$87.00$0.00
472" CONDUIT (SCH 80 PVC)101.00LF 270.00 270.000.00$117.00$0.00
483" CONDUIT (SCH 80 PVC)960.00LF 1,045.00 1,045.000.00$140.00$0.00
494" CONDUIT (SCH 80 PVC)24.00LF 24.00 24.000.00$100.00$0.00
502-PAIR DETECTOR LEAD-IN CABLE3,959.00LF 4,410.00 4,410.000.00$3.00$0.00
51INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT110.00LF 4,850.00 4,850.000.00$16.00$0.00
52REMOVE TYPE 332 CABINET1.00EA 1.00 1.000.00$1,000.00$0.00
53REMOVE TYPE 1 STANDARD (COMPLETE) (EXCL. FOUND.)1.00EA 1.00 1.000.00$620.00$0.00
54REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.)3.00EA 3.00 3.000.00$1,500.00$0.00
55REMOVE TYPE 19 STANDARD (COMPLETE) (EXCL. FOUND.)1.00EA 1.00 1.000.00$1,900.00$0.00
56REMOVE LUMINAIRE15.00EA 15.00 15.000.00$210.00$0.00
57REMOVE VEHICLE HEAD (COMPLETE)10.00EA 10.00 10.000.00$213.00$0.00
58REMOVE PEDESTRIAN HEAD (COMPLETE)3.00EA 3.00 3.000.00$214.00$0.00
59REMOVE PEDESTRIAN PUSH BUTTON6.00EA 6.00 6.000.00$100.00$0.00
60REMOVE STREET LIGHT2.00EA 2.00 2.000.00$1,500.00$0.00
61REMOVE TYPE 1 FOUNDATION1.00EA 1.00 1.000.00$1,100.00$0.00
62REMOVE TYPE 15 FOUNDATION3.00EA 3.00 3.000.00$2,100.00$0.00
63REMOVE TYPE 19 FOUNDATION1.00EA 1.00 1.000.00$2,200.00$0.00
64REMOVE RCTB ANTENNA AND CABLE1.00EA 1.00 1.000.00$600.00$0.00
65TYPE 2070 CONTROLLER2.00EA 2.00 2.000.00$15,000.00$0.00
66GPS UTB UNIT AND ANTENNA2.00EA 2.00 2.000.00$2,000.00$0.00
672-CHANNEL ILD SENSOR UNIT4.00EA 4.00 4.000.00$300.00$0.00
68TYPE 332 CABINET1.00EA 1.00 1.000.00$37,000.00$0.00
69TYPE III-BF SERVICE CABINET 2.00EA 2.00 2.000.00$12,000.00$0.00
70TYPE 1 STANDARD1.00EA 1.00 1.000.00$2,200.00$0.00
71TYPE 15 STANDARD3.00EA 3.00 3.000.00$7,000.00$0.00
72TYPE 19 STANDARD1.00EA 1.00 1.000.00$15,000.00$0.00
73INSTALL TYPE 15 STANDARD1.00EA 1.00 1.000.00$3,000.00$0.00
74TYPE 1 STANDARD FOUNDATION1.00EA 1.00 1.000.00$2,200.00$0.00
75TYPE 15 STANDARD FOUNDATION3.00EA 4.00 4.000.00$3,100.00$0.00
76TYPE 19 STANDARD FOUNDATION1.00EA 1.00 1.000.00$7,000.00$0.00
7730' SIGNAL MAST ARM1.00EA 1.00 1.000.00$5,100.00$0.00
7812' LUMINAIRE MAST ARM4.00EA 4.00 4.000.00$1,900.00$0.00
798' LUMINAIRE MAST ARM1.00EA 1.00 1.000.00$1,400.00$0.00
80PEDESTRIAN PUSH BUTTON10.00EA 10.00 10.000.00$2,800.00$0.00
81PEDESTRIAN PUSH BUTTON POST4.00EA 4.00 4.000.00$2,900.00$0.00
82DOUBLE FACE RETROREFLECTIVE STREET NAME SIGN2.00EA 2.00 2.000.00$1,500.00$0.00
833-12" LED VEHICLE HEAD (COMPLETE) 12.00EA 12.00 12.000.00$1,600.00$0.00
845-12" LED VEHICLE HEAD (COMPLETE) 1.00EA 1.00 1.000.00$2,500.00$0.00
853-SECTION PV LED VEHICLE HEAD (COMPLETE) 1.00EA 1.00 1.000.00$5,300.00$0.00
864-SECTION PV LED VEHICLE HEAD (COMPLETE) 2.00EA 2.00 2.000.00$6,000.00$0.00
87LED PEDESTRIAN HEAD (COMPLETE) 2.00EA 2.00 2.000.00$1,700.00$0.00
88DETAIL 22 (THERMOPLASTIC)8,984.00LF 8,329.00 8,329.000.00$2.00$0.00
89DETAIL 25 (THERMOPLASTIC)541.00LF 520.00 520.000.00$1.00$0.00
90DETAIL 29 (THERMOPLASTIC)1,181.00LF 541.00 541.000.00$2.00$0.00
91DETAIL 32 (THERMOPLASTIC)8,127.00LF 3,576.00 3,576.000.00$2.00$0.00
92DETAIL 38 (THERMOPLASTIC)1,758.00LF 1,888.00 1,888.000.00$2.00$0.00
93DETAIL 39 (THERMOPLASTIC)7,728.00LF 8,252.00 8,252.000.00$1.00$0.00
94DETAIL 40 (THERMOPLASTIC)208.00LF 220.00 220.000.00$1.00$0.00
95DETAIL 9 (THERMOPLASTIC)12,030.00LF 13,337.00 13,337.000.00$1.00$0.00
96DETAIL 38A (THERMOPLASTIC)770.00LF 742.00 742.000.00$2.00$0.00
97DETAIL 39A (THERMOPLASTIC)10,340.00LF 9,650.00 9,650.000.00$1.00$0.00
98DETAIL 27B (THERMOPLASTIC)6,781.00LF 7,034.00 7,034.000.00$1.00$0.00
99DETAIL 37B (THERMOPLASTIC)1,076.00LF 802.00 802.000.00$2.00$0.00
100PAVEMENT MARKINGS (THERMOPLASTIC)26,125.00SF 17,488.00 17,488.000.00$4.00$0.00
10112" STRIPING (THERMOPLASTIC)1,133.00LF 1,097.00 1,097.000.00$3.00$0.00
1028" STRIPING (THERMOPLASTIC)3,093.00LF 2,978.00 2,978.000.00$3.00$0.00
103CURB MARKINGS (ONE-COAT PAINT)854.00LF 1,000.00 1,000.000.00$2.00$0.00
104REMOVE STRIPING AND MARKINGS (THERMOPLASTIC)705.00SF 705.00 705.000.00$5.00$0.00
105INSTALL FIRE HYDRANT LOCATION RPM40.00EA 22.00 22.000.00$15.00$0.00
106SIGN PANEL88.00EA 51.00 51.000.00$125.00$0.00
107RELOCATE SIGN99.00EA 20.00 20.000.00$75.00$0.00
108REMOVE SIGN10.00EA 3.00 3.000.00$75.00$0.00
109REMOVE SIGN POST7.00EA 7.00 7.000.00$75.00$0.00
110RELOCATE SIGN POST59.00EA 18.00 18.000.00$150.00$0.00
111REMOVE PULL BOX12.00EA 13.00 13.000.00$300.00$0.00
112INSTALL STREET LIGHT AND FOUNDATION8.00EA 8.00 8.000.00$5,200.00$0.00
113REMOVE STREET LIGHT FOUNDATION2.00EA 2.00 2.000.00$2,500.00$0.00
114STREET LIGHTING STANDARD (COMPLETE)8.00EA 8.00 8.000.00$6,300.00$0.00
115CONCRETE STREET LIGHT FOUNDATION (30" SQ X 48" DEEP)8.00EA 8.00 8.000.00$2,300.00$0.00
116100 W EQ LED LUMINAIRE8.00EA 8.00 8.000.00$700.00$0.00
117LED LUMINAIRES (100W HPS EQUIVALENT)2.00EA 2.00 2.000.00$810.00$0.00
118LED LUMINAIRES (150W HPS EQUIVALENT)12.00EA 12.00 12.000.00$940.00$0.00
119LED LUMINAIRES (200W HPS EQUIVALENT)2.00EA 2.00 2.000.00$1,300.00$0.00
120LED LUMINAIRES (250W HPS EQUIVALENT)2.00EA 2.00 2.000.00$1,400.00$0.00
121LED LUMINAIRE (200W HPS EQUIVALENT)2.00EA 2.00 2.000.00$1,500.00$0.00
122ELECTRICAL WORK1.00LS 1.00 1.000.00$73,000.00$0.00
123SERVICE PEDESTAL AND CONCRETE FOUNDATION1.00EA 1.00 1.000.00$12,000.00$0.00
124REWIRE INTERSECTION1.00LS 1.00 1.000.00$25,000.00$0.00
125TYPE 2 COMPOSITE PULL BOX INCLUDING COVER3.00EA 4.00 4.000.00$2,100.00$0.00
126TYPE 3 COMPOSITE PULL BOX INCLUDING COVER12.00EA 14.00 14.000.00$2,400.00$0.00
127GREEN COLORED PAVEMENT MARKING9,684.00SF 2,952.00 2,952.000.00$9.00$0.00
128REMOVE EXISTING SERVICE METER2.00EA 2.00 2.000.00$1,200.00$0.00
129LONGITUDINAL GUTTER324.00LF 284.00 284.000.00$98.00$0.00
130PARKWAY DRAIN20.00LF 20.00 20.000.00$1,300.00$0.00
131SIGN POST (ROADSIDE SIGN)35.00EA 48.00 48.000.00$150.00$0.00
132RED BRICK PAVING WITH MORTAR9.00SF 9.00 9.000.00$84.00$0.00
133PULL BOX TYPE 2 POLYMER CONCRETE AND COVER ASSEMBLY9.00EA 9.00 9.000.00$2,200.00$0.00
134#10 WIRE1,320.00LF 1,320.00 1,320.000.00$1.00$0.00
135BALL VALVE, 40 PSI WWP, 1"1.00EA 1.00 1.000.00$500.00$0.00
136WATER METER + IRRIGATION POC1.00EA 1.00 1.000.00$9,000.00$0.00
137RAIN SENSOR1.00EA 1.00 1.000.00$700.00$0.00
138QUICK COUPLER1.00EA 1.00 1.000.00$710.00$0.00
1391.5" BACKFLOW PREVENTER DEVICE, INCLUDING CONCRETE PAD, ENCLOSURE, WYE STRAINER AND PRESSURE REGULATOR1.00EA 1.00 1.000.00$7,000.00$0.00
140FLOW SENSOR ASSEMBLY, INCLUDING VALVE BOX AND WIRING TO CONTROLLER1.00EA 1.00 1.000.00$2,000.00$0.00
141REMOTE CONTROL MASTER VALVE ASSEMBLY, LINE SIZE1.00EA 1.00 1.000.00$900.00$0.00
1421/2" SUBSURFACE DRIP TUBING1,254.00LF 1,254.00 1,254.000.00$2.00$0.00
1431-1/2" DRIP IRRIGATION REMOTE CONTROL VALVE1.00EA 1.00 1.000.00$900.00$0.00
144CONTROLLER CABINET, PEDESTAL MOUNT, 8 STATION1.00EA 1.00 1.000.00$13,000.00$0.00
145PVC SCHEDULE 40 MAINLINE LINE 1-1/2"300.00LF 380.00 380.000.00$8.00$0.00
146PVC SCHEDULE 40 LATERAL LINE 3/4"100.00LF 100.00 100.000.00$6.00$0.00
147PVC CLASS 200 PIPE SLEEVE 4"538.00LF 538.00 538.000.00$26.00$0.00
1481 GALLON SHRUB MATERIAL80.00EA 80.00 80.000.00$16.00$0.00
149FURNISH AND PLANT 5 GALLON SHRUBS86.00EA 86.00 86.000.00$33.00$0.00
1503/4" DECORATIVE PEA GRAVEL170.00SF 170.00 170.000.00$6.00$0.00
1513" LAYER WOOD BARK MULCH780.00SF 780.00 780.000.00$1.00$0.00
152EXISTING TURF REPAIR/ REPLACE3,618.00SF 3,618.00 3,618.000.00$2.00$0.00
153TREE PROTECTION FENCING9.00EA 0.00 0.000.00$500.00$0.00
154TREE PROTECTION MATERIAL9.00EA 0.00 0.000.00$300.00$0.00
155RIVER ROCK PAVING2,854.00SF 3,134.00 3,134.000.00$17.00$0.00
156AGRONOMIC SOIL REPORT1.00EA 1.00 1.000.00$510.00$0.00
157IMPORT CLASS A TOPSOIL46.00CY 46.00 46.000.00$86.00$0.00
158STEEL LANDSCAPE EDGING140.00LF 150.00 150.000.00$17.00$0.00
159DECOMPOSED GRANITE, 3" THICK115.00SF 265.00 265.000.00$5.00$0.00
S-1FOUNDATIONS FOR CABINETS/PUSH BUTTONS LS 1.00 1.000.00$11,500.00$0.00
S-2ADDITIONAL TRAFFIC CONTROL (DIGOUT AREAS) LS 1.00 1.000.00$19,950.00$0.00
S-3PCC CURB & GUTTER; W-12", TYPE B3-4 LF 205.00 205.000.00$72.00$0.00
S-4ADDITIONAL TRAFFIC CONTROL  LS 0.00 0.000.00$11,950.00$0.00
S-5TYPE 15 STANDARD EA 1.00 1.000.00$6,850.00$0.00
S-6PEDESTRIAN PUSH BUTTON POST EA 1.00 1.000.00$2,850.00$0.00
S-7ADDITIONAL LANDSCAPE & CONCRETE WORK  T&M 0.00 0.000.00$1.00$0.00
S-8ADDITIONAL DELAY COSTS T&M 0.00 0.000.00$1.00$0.00
S-9TREE REMOVAL (13"-24" DIAMETER) EA 67.00 67.000.00$1,600.00$0.00
S-10TREE REMOVAL (25 " + DIAMETER EA 32.00 32.000.00$3,200.00$0.00
S-11FURNISH AND PLANT 24 " BOX TREE EA 109.00 109.000.00$710.00$0.00
S-12FURNISH AND INSTALL TREE WATERING BAG EA 0.00 0.000.00$40.00$0.00
S-13TREE MAINTENANCE (90 DAY PERIOD) LS 1.00 1.000.00$23,000.00$0.00
S-14IMPLEMENTATION OF BMPS  LS 1.00 1.000.00$9,000.00$0.00
S-15ADDITIONAL MOBILIZATION, CLEAN UP, ETC. LS 1.00 1.000.00$116,574.00$0.00
S-16 ADDITIONAL TRAFFIC CONTROL (CONCRETE AND LANDSCAPE) LS 1.00 1.000.00$97,000.00$0.00
S-17CLEARING AND GRUBBING  LS 1.00 1.000.00$2,500.00$0.00
S-18CONCRETE REMOVAL (NON-REINFORCED  CY 310.00 310.000.00$410.00$0.00
S-19UNCLASSIFIED EXCAVATION  CY 232.50 232.500.00$300.00$0.00
S-20CRUSHED MISCELLANEOUS BASE CY 188.00 188.000.00$350.00$0.00
S-21PCC WALK AND DRIVEWAYS, 4" THICK SF 3,609.00 3,609.000.00$32.00$0.00
S-22PCC CURB AND GUTTER, TYPE A2-VAR LF 1,295.75 1,295.750.00$142.00$0.00
S-23PETROMAT REMOVAL DISPOSAL FEE LS 1.00 1.000.00$4,242.00$0.00
S-24FURNISH AND INSTALL K71 BOLLARDS - WHITE EA 10.00 10.000.00$365.00$0.00
S-25LAYOUT ABD INSTALL 4" THERMOPLASTIC YELLOW STRIPE LF 20.00 20.000.00$1.25$0.00

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $10,046,707.45 $10,046,707.45 $0.00
Retained $502,335.37 $502,335.37 $0.00
Deducted $0.00 $0.00 $0.00
Due $9,544,372.08 $9,544,372.08 $0.00



*The term "As-Built" used by the Department of Public Works in combination with the Engineer's Monthly Estimate process indicates that the project has been field accepted and that the pay quantities and deductions as detailed above are FINAL. Unless a certified letter is received by this office within 14 calendar days disputing the amounts shown, an acceptance letter will be filed with the Board of Supervisors authorizing the release of retention.