Los Angeles County Public Works
Project Management Division III
As-Built 9
Project Name: Coastline Drive 12-Inch Waterline Improvements
Contractor: Dominguez General Engineering, Inc.
11096 Pipeline Avenue
Pomona, CA 91766
Project ID: WWD2900063
Federal Number(s): None
Original Contract: $3,138,480.00
Awarded: 8/5/2024
Period Ending: 4/21/2026
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
1CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 1.000.00$2,500.00$0.00
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)7.00MTH 7.00 7.000.00$500.00$0.00
3CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000)1.00LS 1.00 0.001.00$1,000.00$1,000.00
4IMPLEMENTATION OF THE LTWHP1.00LS 1.00 1.000.00$30,000.00$0.00
5IMPLEMENTATION OF BMPS1.00LS 1.00 1.000.00$30,000.00$0.00
6SHORING OF OPEN EXCAVATIONS1.00LS 1.00 1.000.00$100,000.00$0.00
7PREPARATION OF SITE SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $3,000)1.00LS 1.00 1.000.00$3,000.00$0.00
8IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN 1.00LS 1.00 1.000.00$5,000.00$0.00
9PREPARATION OF THE SITE SPECIFIC ASBESTOS ABATEMENT PLAN (STIPULATED UNIT PRICE OF $3,000)1.00LS 1.00 1.000.00$3,000.00$0.00
10IMPLEMENTATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN1.00LS 1.00 1.000.00$5,000.00$0.00
11REMOVAL AND DISPOSAL OF NON-HAZARDOUS ASBESTOS WASTE1.00LS 1.00 1.000.00$5,000.00$0.00
12PREPARATION OF THE NOISE MITIGATION PLAN (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 1.000.00$2,500.00$0.00
13CONSTRUCTION OF TEMPORARY SOUND BARRIER114.00LF 0.00 0.000.00$220.00$0.00
14REMOVAL OF TEMPORARY SOUND BARRIER1.00LS 0.00 0.000.00$20,000.00$0.00
15COMMUNITY RELATIONS (ALLOWANCE OF $50,000)50,000.00AL 6,500.00 6,500.000.00$1.00$0.00
16OFFICE FACILITIES8.00MTH 8.00 8.000.00$25,000.00$0.00
17MOBILIZATION1.00LS 1.00 1.000.00$100,000.00$0.00
18ABANDON WATERMAIN1.00LS 1.00 1.000.00$25,000.00$0.00
1912" WATERMAIN, .25" THICK STL, CML & CMC, WELDED2,146.00LF 2,139.00 2,139.000.00$650.00$0.00
20WATER SERVICE, 1.0", STD PLAN W-51.00EA 1.00 1.000.00$10,000.00$0.00
21WATER SERVICE, 1.5", STD PLAN W-51.00EA 1.00 1.000.00$12,000.00$0.00
22WATER SERVICE, 1.0", STD PLAN W-711.00EA 11.00 11.000.00$6,000.00$0.00
23WATER SERVICE, 2.0", STD PLAN W-71.00EA 1.00 1.000.00$5,000.00$0.00
24RECONNECT EXISTING WATER SERVICE6.00EA 7.00 7.000.00$7,000.00$0.00
25RECONNECT EXISTING WATER SERVICE WITH NEW METER BOX AND LID17.00EA 17.00 17.000.00$8,000.00$0.00
26AIR RELEASE AND VACUUM VALVE ASSEMBLY, 2"2.00EA 2.00 2.000.00$10,000.00$0.00
27BUTTERFLY VALVE, 250 PSI WWP, 8"1.00EA 1.00 1.000.00$6,000.00$0.00
28BUTTERFLY VALVE, 250 PSI WWP, 10"1.00EA 1.00 1.000.00$8,000.00$0.00
29BUTTERFLY VALVE, 250 PSI WWP, 12"9.00EA 9.00 9.000.00$10,000.00$0.00
30RUBBER FLAPPER CHECK VALVE, 200 PSI WWP, 12"1.00EA 1.00 0.001.00$50,000.00$50,000.00
316' X 4' X 6' PRECAST CONCRETE VAULT1.00EA 1.00 1.000.00$100,000.00$0.00
32FIRE HYDRANT, STD PLAN W-108.00EA 8.00 8.000.00$20,000.00$0.00
33PUMP WELL ASSEMBLY, TOP DRAINING,STD PLAN W-53, STYLE A3.00EA 3.00 2.500.50$25,000.00$12,500.00
34REMOVE AND DISPOSE OF EXISTING FIRE HYDRANT ASSEMBLY7.00EA 7.00 7.000.00$5,000.00$0.00
3520" STEEL CASING85.00LF 85.00 85.000.00$1,000.00$0.00
36TRENCH BACKFILL SLURRY (CLASS 140-S-100)26.00CY 86.00 86.000.00$500.00$0.00
37INTERCONNECTION TO EXISTING WATERMAIN3.00EA 3.00 3.000.00$30,000.00$0.00
38RECONNECT EXISTING SAMPLING STATION1.00EA 1.00 1.000.00$5,000.00$0.00
39CATHODIC PROTECTION ANODE AND TEST STATION, STD PLAN W-391.00EA 1.00 1.000.00$15,000.00$0.00
40INITIAL VIDEO INSPECTION1.00LS 1.00 1.000.00$5,000.00$0.00
41VIDEO INSPECTION1.00LS 1.00 1.000.00$5,000.00$0.00
42TRAFFIC CONTROL1.00LS 1.00 1.000.00$100,000.00$0.00
S-1EXTEND WORKING HOURS (7AM-5PM) WD 0.00 0.000.00$0.00$0.00
S-1AMODIFY WORK HOURS (6:30AM-4:30PM) WD 0.00 0.000.00$0.00$0.00
S-2TRENCH BACKFILL SLURRY LS 1.00 1.000.00$2,100.00$0.00
S-3USACE SCHEDULE IMPACT WD 5.00 5.000.00$0.00$0.00
S-4UNFORESEEN SUBSURFACE SLURRY T&M 999.90 999.900.00$1.00$0.00
S-5METER BOX WATER INTRUSION T&M 904.07 904.070.00$1.00$0.00
S-6EXPLORATORY EXCAVATION AT CASTLE ROCK EA 1.00 1.000.00$1,400.00$0.00
S-7WATER INTRUSION STA 22+51 T&M 3,304.45 3,304.450.00$1.00$0.00
S-9DAMAGED UNMARKED SERVICE STA 26+80 T&M 6,680.97 6,680.970.00$1.00$0.00
S-10FIRE HYDRANT LATERAL OVER STORM DRAIN LS 1.00 1.000.00$18,421.48$0.00
S-11UNFORESEEN SLURRY T&M 5,367.65 5,367.650.00$1.00$0.00
S-12BREAKAWAY VALVE STA 13+25  LS 1.00 1.000.00$2,381.00$0.00
S-13FLOODED TRENCH T&M 15,601.59 15,601.590.00$1.00$0.00
S-14WASHED-OUT BASE LS 1.00 1.000.00$3,760.00$0.00
S-15REVISED TIE-IN AT CASTLEROCK RD LS 1.00 1.000.00$32,000.00$0.00
S-16ADDITIONAL PAVING TONS 71.00 71.000.00$575.00$0.00
S-17EXCHANGE OF MATERIAL FOR TIME LS 0.00 0.000.00$0.00$0.00

DEDUCTION DETAIL

DescriptionUnitTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
OVERTIME INSPECTIONHOUR 16.50 16.500.00$100.00 $0.00
LIQUIDATED DAMAGESDAY 0.00 0.000.00$2,000.00 $0.00
LABOR COMPLIANCEVIOLATION 0.00 0.000.00$250.00 $0.00
AFFIRMATIVE ACTIONVIOLATION 0.00 0.000.00$200.00 $0.00
BEST MANAGEMENT PRACTICEVIOLATION 0.00 0.000.00$1,000.00 $0.00
SCHEDULE UPDATEMONTHLY 0.00 0.000.00$250.00 $0.00
LOCAL TARGATED WORKER HIRING PROGRAMSTIP 0.00 0.000.00$1.00 $0.00

FINANCIAL SUMMARY

  Total Previous Current
Earned $3,216,096.11 $3,152,596.11 $63,500.00
Retained $160,804.81 $157,629.81 $3,175.00
Deducted $1,650.00 $1,650.00 $0.00
Due $3,053,641.30 $2,993,316.30 $60,325.00



*The term "As-Built" used by the Department of Public Works in combination with the Engineer's Monthly Estimate process indicates that the project has been field accepted and that the pay quantities and deductions as detailed above are FINAL. Unless a certified letter is received by this office within 14 calendar days disputing the amounts shown, an acceptance letter will be filed with the Board of Supervisors authorizing the release of retention.