Los Angeles County Public Works
Project Management Division III
As-Built 2
Project Name: Marvin Braude Bike Path at Dockweiler Beach Rpr Off-System (JAN 8 2023 WINTER STM)
Contractor: Beador Construction Company, Inc.
2900 Bristol Street, Suite D204
Costa Mesa, CA 92626-5981
Project ID: RDC0016596
Federal Number(s): None
Original Contract: $1,125,300.00
Awarded: 12/3/2025
Period Ending: 5/7/2026
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
1CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 1.000.00$2,500.00$0.00
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)2.00MTH 2.00 2.000.00$500.00$0.00
3CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000)1.00LS 1.00 0.001.00$1,000.00$1,000.00
4PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 1.000.00$2,500.00$0.00
5IMPLEMENTATION OF THE SWPPP1.00LS 1.00 1.000.00$50,000.00$0.00
6OFFICE FACILITIES2.00MTH 2.00 2.000.00$15,000.00$0.00
7MOBILIZATION1.00LS 1.00 1.000.00$110,000.00$0.00
8CONCRETE REMOVAL (NON-REINFORCED)335.00CY 520.00 335.00185.00$300.00$55,500.00
9CONCRETE REMOVAL (REINFORCED)60.00CY 27.00 27.000.00$500.00$0.00
10UNCLASSIFIED EXCAVATION902.00CY 902.00 902.000.00$150.00$0.00
11STABILIZATION GEOTEXTILE1,518.00SY 1,518.00 1,518.000.00$5.00$0.00
12CRUSHED MISCELLANEOUS BASE236.00CY 296.00 236.0060.00$225.00$13,500.00
13PCC PAVEMENT382.00CY 415.00 382.0033.00$700.00$23,100.00
14CONST & REMOVE TEMP CHAIN LINK FENCE496.00LF 496.00 496.000.00$50.00$0.00
15TEMPORARY RAILING (TYPE K)476.00LF 476.00 476.000.00$65.00$0.00
16REINFORCED POLYETHYLENE GEOMEMBRANE11,264.00SF 15,225.00 11,264.003,961.00$3.00$11,883.00
175' X 10' X 1" THICK STEEL PLATE (STAGING AREA)12,978.00SF 12,800.00 12,800.000.00$7.00$0.00
18UNCLASSIFIED EXCAVATION (STAGING AREA)361.00CY 361.00 361.000.00$100.00$0.00
19TRAFFIC CONTROL1.00LS 1.00 1.000.00$117,932.00$0.00
S-1PEDESTRIAN PAD LS 1.00 1.000.00$25,000.00$0.00

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $1,236,537.00 $1,131,554.00 $104,983.00
Retained $61,826.85 $56,577.70 $5,249.15
Deducted $0.00 $0.00 $0.00
Due $1,174,710.15 $1,074,976.30 $99,733.85



*The term "As-Built" used by the Department of Public Works in combination with the Engineer's Monthly Estimate process indicates that the project has been field accepted and that the pay quantities and deductions as detailed above are FINAL. Unless a certified letter is received by this office within 14 calendar days disputing the amounts shown, an acceptance letter will be filed with the Board of Supervisors authorizing the release of retention.