Los Angeles County Public Works
Project Management Division III
As-Built 14
Project Name: Olympic Boulevard TSSP - Indiana Street to Montebello Boulevard
Contractor: California Professional Engineering, Inc.
19062 San Jose Avenue
La Puente, CA 91748
Project ID: TSM0010287
Federal Number(s): None
Original Contract: $2,514,601.72
Awarded: 6/22/2023
Period Ending: 5/20/2026
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
1CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 1.000.00$2,500.00$0.00
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)11.00MTH 11.00 11.000.00$500.00$0.00
3CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000)1.00LS 0.00 0.000.00$1,000.00$0.00
4MOBILIZATION1.00LS 1.00 0.950.05$141,250.00$7,062.50
5IMPLEMENTATION OF BMPS1.00LS 1.00 1.000.00$10,000.00$0.00
6IMPLEMENTATION OF THE LTWHP1.00LS 1.00 1.000.00$5,000.00$0.00
7EXPLORATORY EXCAVATION OF UTILITIES (ALLOWANCE OF $18,750)18,750.00AL 18,750.00 18,750.000.00$1.00$0.00
8CONCRETE REMOVAL (NON-REINFORCED)27.00CY 27.00 27.000.00$420.00$0.00
9UNCLASSIFIED EXCAVATION10.00CY 0.00 0.000.00$480.00$0.00
10CRUSHED MISCELLANEOUS BASE9.00CY 0.00 0.000.00$300.00$0.00
11TRENCH BACKFILL SLURRY (CLASS 270-E-500)9.00CY 0.00 0.000.00$600.00$0.00
12AC PAVEMENT7.00TON 7.00 7.000.00$2,400.00$0.00
13AC PAVEMENT(PATCH BACK)7.00TON 7.00 7.000.00$2,400.00$0.00
14PCC PAVEMENT2.00CY 2.00 0.002.00$3,000.00$6,000.00
15PCC CURB & GUTTER, TYPE A2-VAR198.00LF 198.00 198.000.00$180.00$0.00
16PCC WALK, 4" THICK80.00SF 80.00 80.000.00$14.40$0.00
17PCC WALK & CURB RAMPS, 4" THICK1,296.00SF 1,296.00 1,296.000.00$21.60$0.00
18DETECTABLE WARNING SURFACE139.00SF 117.00 117.000.00$210.00$0.00
19METAL HAND RAILINGS PER STD PLAN 60665.00LF 65.00 35.0030.00$300.00$9,000.00
201-1/2" CONDUIT (SCH 80 PVC)10.00LF 10.00 10.000.00$200.00$0.00
212" CONDUIT (SCH 80 PVC)140.00LF 140.00 140.000.00$100.00$0.00
223" CONDUIT (SCH 80 PVC)1,115.00LF 1,115.00 1,115.000.00$95.00$0.00
234" CONDUIT (SCH 80 PVC)270.00LF 270.00 270.000.00$110.00$0.00
242-PAIR DETECTOR LEAD-IN CABLE1,055.00LF 1,055.00 1,055.000.00$3.75$0.00
253-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT)10,710.00LF 10,710.00 10,710.000.00$4.25$0.00
265-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT)1,400.00LF 1,400.00 1,400.000.00$5.50$0.00
2712-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT)10,820.00LF 10,700.00 10,700.000.00$7.00$0.00
28#6 WIRE3,030.00LF 3,030.00 3,030.000.00$2.80$0.00
29#10 WIRE18,430.00LF 11,093.00 11,093.000.00$2.50$0.00
30#12 WIRE1,900.00LF 1,862.00 1,862.000.00$2.40$0.00
31REMOVE PULL BOX AND RESURFACE SIDEWALK10.00EA 10.00 10.000.00$2,400.00$0.00
32TYPE II PULL BOX1.00EA 1.00 1.000.00$900.00$0.00
33TYPE III PULL BOX37.00EA 37.00 37.000.00$1,100.00$0.00
34INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT1,800.00LF 1,738.00 1,738.000.00$15.00$0.00
35REMOVE TYPE 332 CABINET5.00EA 5.00 5.000.00$500.00$0.00
36REMOVE TYPE 337 CABINET5.00EA 5.00 5.000.00$500.00$0.00
37REMOVE PPB POST (COMPLETE) (EXCL. FOUND.)1.00EA 1.00 1.000.00$150.00$0.00
38REMOVE TYPE 1 STANDARD (COMPLETE) (EXCL. FOUND.)7.00EA 7.00 7.000.00$800.00$0.00
39REMOVE TYPE 3 STANDARD (COMPLETE) (EXCL. FOUND.)2.00EA 2.00 2.000.00$600.00$0.00
40REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.)1.00EA 1.00 1.000.00$900.00$0.00
41REMOVE TYPE 17 STANDARD (COMPLETE) (EXCL. FOUND.)3.00EA 3.00 3.000.00$950.00$0.00
42REMOVE TYPE 19 STANDARD (COMPLETE) (EXCL. FOUND.)1.00EA 1.00 1.000.00$1,100.00$0.00
43REMOVE STREET LIGHT POLE AND FOUNDATION3.00EA 0.00 0.000.00$1,600.00$0.00
44REMOVE LUMINAIRE12.00EA 12.00 12.000.00$100.00$0.00
45REMOVE VEHICLE HEAD (COMPLETE)117.00EA 117.00 117.000.00$150.00$0.00
46REMOVE PEDESTRIAN HEAD (COMPLETE)1.00EA 1.00 1.000.00$150.00$0.00
47REMOVE PEDESTRIAN PUSH BUTTON28.00EA 23.00 21.002.00$75.00$150.00
48REMOVE PEDESTRIAN PUSH BUTTON AND COLD WELD HOLE TO SMOOTH FINISH4.00EA 4.00 3.001.00$300.00$300.00
49REMOVE PEDESTRIAN PUSH BUTTON PLATE31.00EA 31.00 31.000.00$10.00$0.00
50REMOVE TYPE 332 CABINET FOUNDATION5.00EA 4.00 4.000.00$2,200.00$0.00
51REMOVE TYPE 337 CABINET FOUNDATION5.00EA 5.00 5.000.00$2,200.00$0.00
52REMOVE PPB POST FOUNDATION1.00EA 1.00 1.000.00$500.00$0.00
53REMOVE TYPE 1 FOUNDATION3.00EA 3.00 3.000.00$1,300.00$0.00
54REMOVE TYPE 3 FOUNDATION2.00EA 2.00 2.000.00$1,100.00$0.00
55REMOVE TYPE 15 FOUNDATION1.00EA 1.00 1.000.00$1,500.00$0.00
56REMOVE TYPE 17 FOUNDATION3.00EA 3.00 3.000.00$1,500.00$0.00
57REMOVE TYPE 19 FOUNDATION1.00EA 1.00 1.000.00$1,800.00$0.00
58REMOVE AC ISOLATION MODULE3.00EA 3.00 3.000.00$50.00$0.00
59REMOVE RADIO CORRECTED TIME BASE UNIT1.00EA 1.00 1.000.00$250.00$0.00
60REMOVE RCTB ANTENNA AND CABLE4.00EA 4.00 4.000.00$70.00$0.00
61SALVAGE EQUIPMENT1.00LS 1.00 1.000.00$23,200.00$0.00
62RELOCATE CONTROLLER6.00EA 6.00 6.000.00$750.00$0.00
63RELOCATE EV PREEMPTION MODULE2.00EA 2.00 2.000.00$2,000.00$0.00
64RELOCATE BATTERY BACKUP SYSTEM1.00EA 0.00 0.000.00$2,000.00$0.00
65RELOCATE RETRO REFLECTIVE STREET NAME SIGN 4.00EA 4.00 4.000.00$900.00$0.00
66TYPE 170 ATC/HC-11 CONTROLLER3.00EA 3.00 3.000.00$4,124.00$0.00
67TYPE 170 PROGRAM - BITRANS2.00EA 2.00 2.000.00$2,130.00$0.00
68TYPE 2070 CONTROLLER1.00EA 1.00 1.000.00$5,053.00$0.00
69D4 PROGRAM1.00EA 1.00 1.000.00$2,130.00$0.00
70GPS UTB UNIT AND ANTENNA11.00EA 11.00 11.000.00$1,572.00$0.00
712070 7G GPS MODULE AND ANTENNA1.00EA 1.00 1.000.00$1,572.00$0.00
72CONFLICT MONITOR1.00EA 1.00 1.000.00$1,616.00$0.00
73SWITCH PACK76.00EA 76.00 76.000.00$60.00$0.00
74PED ISOLATION MODULE19.00EA 19.00 19.000.00$115.00$0.00
752-CHANNEL ILD SENSOR UNIT29.00EA 29.00 29.000.00$283.00$0.00
76TYPE 332 CABINET10.00EA 10.00 10.000.00$19,865.00$0.00
77BATTERY BACKUP SYSTEM (COMPLETE)1.00EA 1.00 1.000.00$12,000.00$0.00
78REWIRE CONTROLLER CABINET2.00EA 2.00 2.000.00$3,000.00$0.00
79TEMPORARY CONTROLLER1.00EA 1.00 1.000.00$5,000.00$0.00
80PEDESTRIAN PUSH BUTTON POST3.00EA 3.00 3.000.00$1,068.00$0.00
81TYPE 1 STANDARD4.00EA 4.00 4.000.00$2,593.00$0.00
82TYPE 1 STANDARD (7')1.00EA 1.00 1.000.00$2,593.00$0.00
83TYPE 15 STANDARD4.00EA 4.00 4.000.00$5,420.00$0.00
84TYPE 16 STANDARD1.00EA 1.00 1.000.00$10,352.00$0.00
85TYPE 17 STANDARD2.00EA 2.00 2.000.00$11,106.00$0.00
86TYPE 19 STANDARD5.00EA 5.00 5.000.00$11,740.00$0.00
87TYPE 24 STANDARD1.00EA 1.00 1.000.00$13,083.00$0.00
88TEMPORARY TYPE 15 STANDARD1.00EA 1.00 1.000.00$4,500.00$0.00
89TYPE 332 CABINET FOUNDATION10.00EA 9.00 9.000.00$2,500.00$0.00
90PEDESTRIAN PUSH BUTTON POST FOUNDATION3.00EA 3.00 3.000.00$1,500.00$0.00
91TYPE 1 STANDARD FOUNDATION5.00EA 5.00 5.000.00$2,500.00$0.00
92TYPE 15 STANDARD FOUNDATION4.00EA 4.00 4.000.00$4,500.00$0.00
93TYPE 16 STANDARD FOUNDATION1.00EA 1.00 1.000.00$4,500.00$0.00
94TYPE 17 STANDARD FOUNDATION2.00EA 2.00 2.000.00$5,000.00$0.00
95TYPE 19 STANDARD FOUNDATION5.00EA 5.00 5.000.00$5,000.00$0.00
96TYPE 24 STANDARD FOUNDATION1.00EA 1.00 1.000.00$6,000.00$0.00
9720' SIGNAL MAST ARM3.00EA 3.00 3.000.00$4,828.00$0.00
9825' SIGNAL MAST ARM4.00EA 4.00 4.000.00$5,007.00$0.00
9930' SIGNAL MAST ARM1.00EA 1.00 1.000.00$5,263.00$0.00
10035' SIGNAL MAST ARM1.00EA 1.00 1.000.00$5,790.00$0.00
10112' LUMINAIRE MAST ARM12.00EA 12.00 12.000.00$1,537.00$0.00
102150 W HPS LUMINAIRE2.00EA 2.00 2.000.00$555.00$0.00
103200 W HPS LUMINAIRE13.00EA 13.00 13.000.00$575.00$0.00
104250 W HPS LUMINAIRE9.00EA 9.00 9.000.00$575.00$0.00
105PEDESTRIAN PUSH BUTTON65.00EA 64.00 63.001.00$3,658.00$3,658.00
106PEDESTRIAN PUSH BUTTON PLATE96.00EA 86.00 80.006.00$25.00$150.00
107COUNTDOWN PEDESTRIAN MODULE (COMPLETE)17.00EA 17.00 17.000.00$1,343.00$0.00
108LED COUNTDOWN PEDESTRIAN HEAD (COMPLETE)12.00EA 12.00 12.000.00$1,343.00$0.00
109LED BLANK-OUT SIGN (COMPLETE)2.00EA 2.00 2.000.00$7,225.00$0.00
110DOUBLE FACE RETROREFLECTIVE STREET NAME SIGN5.00EA 5.00 5.000.00$1,460.00$0.00
1113-12" LED VEHICLE HEAD (COMPLETE) 139.00EA 139.00 139.000.00$1,488.00$0.00
1124-12" LED VEHICLE HEAD (COMPLETE) 6.00EA 6.00 6.000.00$1,746.00$0.00
1135-12" LED VEHICLE HEAD (COMPLETE) 3.00EA 3.00 3.000.00$1,930.00$0.00
114VIDEO/RADAR DETECTION SYSTEM WITH 17" LCD MONITOR DRAWER (COMPLETE) - OLYMPIC BL @ TELEGRAPH RD/AGUSTA AV1.00EA 1.00 1.000.00$70,000.00$0.00
115VIDEO/RADAR DETECTION SYSTEM WITH 17" LCD MONITOR DRAWER (COMPLETE) - OLYMPIC BL @ GERHART AV1.00EA 1.00 1.000.00$52,000.00$0.00
116RADAR DETECTION SYSTEM (COMPLETE) - OLYMPIC BL @ VAIL AV1.00EA 1.00 1.000.00$52,600.00$0.00
117RADAR DETECTION SYSTEM (COMPLETE) - OLYMPIC BL @ MAPLE AV1.00EA 1.00 1.000.00$53,400.00$0.00
118RADAR DETECTION SYSTEM (COMPLETE) - OLYMPIC BL @ GREENWOOD AV1.00EA 1.00 1.000.00$52,000.00$0.00
119REMOVE STRIPING AND MARKINGS (THERMOPLASTIC)3,350.00SF 3,551.00 3,551.000.00$5.67$0.00
120PAVEMENT MARKINGS (TWO-COAT PAINT)15.00SF 45.00 45.000.00$6.72$0.00
1214" STRIPING (TWO-COAT PAINT)70.00LF 20.00 20.000.00$4.09$0.00
12212" STRIPING (TWO-COAT PAINT)510.00LF 1,656.00 1,656.000.00$3.33$0.00
12312" STRIPING (THERMOPLASTIC)420.00LF 420.00 420.000.00$3.33$0.00
12424" STRIPING (TWO-COAT PAINT)790.00LF 702.00 702.000.00$7.83$0.00
12524" STRIPING (THERMOPLASTIC)3,250.00LF 3,237.00 3,237.000.00$7.83$0.00
126DETAIL 21 (TWO-COAT PAINT)160.00LF 207.00 207.000.00$4.09$0.00
127RED CURB171.00LF 202.00 202.000.00$6.82$0.00
128RELOCATE SIGN4.00EA 4.00 4.000.00$500.00$0.00
129SIGN PANEL3.00EA 3.00 3.000.00$140.40$0.00
130INSTALL SIGN ON POST2.00EA 2.00 2.000.00$181.35$0.00
131INSTALL SIGN (STRAP AND SADDLE BRACKET)1.00EA 1.00 1.000.00$111.15$0.00
132TRAFFIC CONTROL1.00LS 1.00 1.000.00$88,884.00$0.00
133FLASHING ARROW SIGN2.00EA 2.00 2.000.00$6,000.00$0.00
134CHANGEABLE MESSAGE SIGN2.00EA 0.00 0.000.00$12,000.00$0.00
S-1TRENCH & RESTORATION T&M 15,137.68 15,137.680.00$1.00$0.00
S-2LUMINARIES 2 X 150W; 13 X 200W; 9 X 250W LS 1.00 1.000.00$4,501.16$0.00
S-3TROUBLESHOOT RED FAIL T&M 2,947.86 2,947.860.00$1.00$0.00
S-4WORK IN RESPONSE TO RFIS #6 AND #7 T&M 22,426.68 22,426.680.00$1.00$0.00
S-5POLE RELOCATION & ADDITIONAL WORK LS 1.00 1.000.00$18,000.00$0.00
S-6TEMPORARY WIRING T&M 13,757.16 13,757.160.00$1.00$0.00
S-7NEW CONDUIT, CONDUCTOR, SERVICE WORK T&M 1,288.07 1,288.070.00$1.00$0.00
S-8ADDITIONAL MOBILIZATION LS 0.00 0.000.00$9,000.00$0.00
S-9RETROFIT EXISTING PED HEADS LS 1.00 1.000.00$1,100.00$0.00
S-10HANDRAIL REPAIRING LS 0.00 0.000.00$6,363.00$0.00

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $2,519,819.40 $2,493,498.90 $26,320.50
Retained $125,990.97 $124,674.95 $1,316.02
Deducted $0.00 $0.00 $0.00
Due $2,393,828.43 $2,368,823.95 $25,004.48



*The term "As-Built" used by the Department of Public Works in combination with the Engineer's Monthly Estimate process indicates that the project has been field accepted and that the pay quantities and deductions as detailed above are FINAL. Unless a certified letter is received by this office within 14 calendar days disputing the amounts shown, an acceptance letter will be filed with the Board of Supervisors authorizing the release of retention.

Contact Office Engineer
Contractor Copy  
P Please consider the environment before printing this report.