| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $2,500.00 | $2,500.00 |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 5.00 | MTH |
1.00
| 0.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.20
| 0.00 | 0.20 | $35,000.00 | $7,000.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
0.20
| 0.00 | 0.20 | $35,000.00 | $7,000.00 |
| 6 | PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $3000) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $3,000.00 | $3,000.00 |
| 7 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
0.20
| 0.00 | 0.20 | $35,000.00 | $7,000.00 |
| 9 | PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $3000) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $3,000.00 | $3,000.00 |
| 10 | IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN | 1.00 | LS |
0.20
| 0.00 | 0.20 | $20,000.00 | $4,000.00 |
| 11 | CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $35,000) | 35,000.00 | AL |
24,258.56
| 0.00 | 24,258.56 | $1.00 | $24,258.56 |
| 12 | OFFICE FACILITIES | 6.00 | MTH |
1.00
| 0.00 | 1.00 | $5,000.00 | $5,000.00 |
| 13 | MOBILIZATION | 1.00 | LS |
0.75
| 0.00 | 0.75 | $300,000.00 | $225,000.00 |
| 14 | DEMOLITION | 1.00 | LS |
0.50
| 0.00 | 0.50 | $150,000.00 | $75,000.00 |
| 20 | 16-INCHES VERTICAL MIXED FLOW PUMP WITH ELECTRIC MOTOR AT CORDOVA WALK PUMP STATION | 2.00 | EA |
1.176
| 0.00 | 1.176 | $200,000.00 | $235,200.00 |
| 21 | 16-INCHES VERTICAL MIXED FLOW PUMP WITH ELECTRIC MOTOR AT NAPLES PUMP STATION | 3.00 | EA |
1.764
| 0.00 | 1.764 | $200,000.00 | $352,800.00 |
| 40 | TRAFFIC CONTROL | 1.00 | LS |
0.20
| 0.00 | 0.20 | $35,000.00 | $7,000.00 |
| 42 | 3-INCH PVC SCHEDULE 80 CONDUIT FOR NAPLES PUMP STATION | 465.00 | LF |
165.00
| 0.00 | 165.00 | $200.00 | $33,000.00 |
| 48 | MINI POWER CENTER/ZONE AND WIRE/CONDUIT | 2.00 | EA |
0.25
| 0.00 | 0.25 | $75,000.00 | $18,750.00 |
| 64 | TEMPORARY PUMP CONTROL PANEL AND WIRE/CONDUIT FOR CORDOVA WALK PUMP STATION | 1.00 | LS |
1.00
| 0.00 | 1.00 | $10,000.00 | $10,000.00 |
| 66 | TEMPORARY SUMP PUMP CONTROL PANEL AND WIRE/CONDUIT FOR CORDOVA WALK PUMP STATION | 1.00 | LS |
1.00
| 0.00 | 1.00 | $10,000.00 | $10,000.00 |
| 68 | PORTABLE GENERATOR RENTAL FOR CORDOVA WALK PUMP STATION | 6.00 | MO |
1.00
| 0.00 | 1.00 | $5,000.00 | $5,000.00 |
| 70 | PREPARATION OF DEWATERING PLAN FOR CORDOVA WALK PUMP STATION (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $2,500.00 | $2,500.00 |
| 71 | PREPARATION OF DEWATERING PLAN FOR NAPLES PUMP STATION (STIPULATED UNIT PRICE OF $2,500) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $2,500.00 | $2,500.00 |
| 74 | GEOTECHNICAL REPORT FOR SHORING AND BRACING FOR CORDOVA WALK PUMP STATION | 1.00 | LS |
1.00
| 0.00 | 1.00 | $15,000.00 | $15,000.00 |
| 75 | GEOTECHNICAL REPORT FOR SHORING AND BRACING FOR NAPLES PUMP STATION | 1.00 | LS |
1.00
| 0.00 | 1.00 | $15,000.00 | $15,000.00 |
| 78 | MICROTUNNELING (DIRECTIONAL BORING) FOR NAPLES PUMP STATION | 450.00 | LF |
165.00
| 0.00 | 165.00 | $150.00 | $24,750.00 |
| S-2 | SUMP PUMPS | | LS |
1.00
| 0.00 | 1.00 | $6,780.00 | $6,780.00 |
| S-3 | AIR MONITOR AND CALIBRATION EQUIPMENT | | LS |
1.00
| 0.00 | 1.00 | $2,900.00 | $2,900.00 |
|