Los Angeles County Public Works
Project Management Division III
Progress Payment 11
Project Name: Metro Gold Line Eastside Access Phase II Calvary Cemetery Pedestrian Path
Contractor: Los Angeles Engineering, Inc.
633 North Barranca Avenue
Covina, CA 91723
Project ID: RDC0016013
Federal Number(s): None
Original Contract: $8,533,000.00
Awarded: 4/4/2025
Period Ending: 6/8/2026
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)12.00MTH 11.00 10.001.00$500.00$500.00
4IMPLEMENTATION OF THE LTWHP1.00LS 0.92 0.800.12$25,000.00$3,000.00
6IMPLEMENTATION OF THE SWPPP1.00LS 0.92 0.800.12$45,000.00$5,400.00
7SHORING OF OPEN EXCAVATIONS1.00LS 1.00 0.001.00$1,000.00$1,000.00
12OFFICE FACILITIES12.00MTH 11.00 10.001.00$3,000.00$3,000.00
15TREE REMOVAL (6"-12" DIAMETER)107.00EA 107.00 105.002.00$350.00$700.00
18UNCLASSIFIED EXCAVATION3,925.00CY 2,697.67 2,255.33442.34$135.00$59,715.90
19CRUSHED MISCELLANEOUS BASE2,770.00CY 2,770.00 2,255.95514.05$110.00$56,545.50
20TRENCH BACKFILL SLURRY (CLASS 100-E-100)397.00CY 132.00 0.00132.00$150.00$19,800.00
21TRENCH BACKFILL SLURRY (CLASS 270-E-500)306.00CY 306.00 249.4056.60$400.00$22,640.00
23AC PAVEMENT(PATCH BACK)619.00TON 618.12 487.83130.29$200.00$26,058.00
26CURB DRAIN PER STD PLAN 150, N=1, CASE 1 INLET116.00EA 116.00 96.0020.00$350.00$7,000.00
28PCC CURB & GUTTER, TYPE A2-64,853.00LF 4,720.15 4,164.73555.42$35.00$19,439.70
29PCC CURB & GUTTER, TYPE A2-85,084.00LF 4,795.74 4,648.83146.91$40.00$5,876.40
31LONGITUDINAL GUTTER2.00CY 2.00 1.330.67$3,000.00$2,010.00
32PCC WALK, 4" THICK52,563.00SF 52,563.00 43,060.899,502.11$8.00$76,016.88
33PCC CURB RAMPS54.00CY 44.80 26.0518.75$680.00$12,750.00
34PCC WALK & CURB RAMPS, 4" THICK130.00SF 130.00 0.00130.00$15.00$1,950.00
35PCC DRIVEWAYS, 6" THICK1,410.00SF 1,410.00 1,405.694.31$16.00$68.96
36DETECTABLE WARNING SURFACE205.00SF 205.00 180.0025.00$45.00$1,125.00
391-1/2" CONDUIT (GRC)5.00LF 5.00 0.005.00$93.00$465.00
402" CONDUIT (SCH 80 PVC)165.00LF 180.00 40.00140.00$60.00$8,400.00
454-CAMERA VIDEO DETECTION SYSTEM (COMPLETE)1.00EA 1.00 0.500.50$59,000.00$29,500.00
47REMOVE PULL BOX AND RESURFACE SIDEWALK1.00EA 1.00 0.001.00$2,300.00$2,300.00
48REMOVE VEHICLE HEAD (COMPLETE)3.00EA 3.00 0.003.00$165.00$495.00
49REMOVE TYPE 1 FOUNDATION1.00EA 1.00 0.001.00$880.00$880.00
50REMOVE TYPE 15 FOUNDATION1.00EA 1.00 0.001.00$1,760.00$1,760.00
51REMOVE TYPE 17 FOUNDATION1.00EA 1.00 0.001.00$3,100.00$3,100.00
52REWIRE CONTROLLER CABINET2.00EA 1.00 0.001.00$4,000.00$4,000.00
5325' SIGNAL MAST ARM1.00EA 1.00 0.001.00$7,500.00$7,500.00
5412' LUMINAIRE MAST ARM2.00EA 2.00 0.002.00$4,800.00$9,600.00
556' LUMINAIRE MAST ARM1.00EA 1.00 0.001.00$1,600.00$1,600.00
56INSTALL 6' LUMINAIRE MAST ARM24.00EA 24.00 0.0024.00$55.00$1,320.00
57PEDESTRIAN PUSH BUTTON3.00EA 3.00 0.003.00$670.00$2,010.00
58PEDESTRIAN PUSH BUTTON PLATE3.00EA 3.00 0.003.00$50.00$150.00
59RETROREFLECTIVE STREET NAME SIGN 1.00EA 1.00 0.001.00$5,300.00$5,300.00
603-12" LED VEHICLE HEAD (COMPLETE) 5.00EA 4.00 0.004.00$4,600.00$18,400.00
615-12" LED VEHICLE HEAD (COMPLETE) 2.00EA 2.00 0.002.00$5,200.00$10,400.00
111DECOMPOSED GRANITE, 3" THICK1,997.00SF 1,997.00 1,841.40155.60$15.00$2,334.00
1133" CONDUIT572.00LF 450.00 350.00100.00$265.00$26,500.00
114TYPE 19 STANDARD FOUNDATION1.00EA 1.00 0.001.00$9,900.00$9,900.00
115REMOVE PULL BOX10.00EA 10.00 0.0010.00$220.00$2,200.00
116TYPE 15TS STANDARD FOUNDATION2.00EA 2.00 0.002.00$7,100.00$14,200.00
123LED COUNTDOWN PEDESTRIAN HEAD (COMPLETE)3.00EA 3.00 0.003.00$1,350.00$4,050.00
125RUBBER WALKWAY47,489.00SF 47,489.00 37,668.009,821.00$33.00$324,093.00
126TREE BUBBLER236.00EA 236.00 220.0016.00$130.00$2,080.00
128REMOVE TYPE 17 STANDARD (COMPLETE) (EXCL. FOUND.) NEAR OVERHEAD HIGH VOLTAGE1.00EA 1.00 0.001.00$9,000.00$9,000.00
129REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.) NEAR OVERHEAD HIGH VOLTAGE1.00EA 1.00 0.001.00$9,000.00$9,000.00
132REMOVE TYPE 1-A STANDARD (COMPLETE) (EXCL. FOUND.)1.00EA 1.00 0.001.00$450.00$450.00
134ADJUST PULL BOX8.00EA 8.00 0.008.00$440.00$3,520.00
136TYPE 15 STANDARD1.00EA 1.00 0.001.00$10,400.00$10,400.00
137REWIRE INTERSECTION1.00LS 1.00 0.500.50$27,000.00$13,500.00
140PED PUSH BUTTON POST1.00EA 1.00 0.001.00$850.00$850.00
142COMPOSITE TYPE 2 PULL BOX4.00EA 4.00 2.002.00$1,000.00$2,000.00
145TYPE 19 STANDARD NEAR HIGH VOLTAGE LINES (COMPLETE) (EXCL. FOUND.)1.00EA 1.00 0.001.00$25,000.00$25,000.00
146REMOVE TREE WELL127.00EA 127.00 125.002.00$250.00$500.00
147ELECTRIC METER1.00EA 1.00 0.001.00$25,000.00$25,000.00
150LITTER RECEPTACLE INSTALLATION26.00EA 26.00 11.0015.00$250.00$3,750.00
151PET WASTE STATION INSTALLATION12.00EA 12.00 2.0010.00$450.00$4,500.00
154PULL BOX TYPE 2 WITH COVER125.00EA 125.00 89.0036.00$750.00$27,000.00
155PULL BOX TYPE 3 WITH COVER13.00EA 20.00 13.007.00$1,300.00$9,100.00
158CONCRETE PEDESTRIAN LIGHT FOUNDATION74.00EA 74.00 60.0014.00$1,550.00$21,700.00
159INSTALL PEDESTRIAN LIGHT POLE74.00EA 74.00 60.0014.00$1,900.00$26,600.00
162TREE WITH TREE WELL PER MOD STD PLAN 519118.00EA 118.00 110.008.00$720.00$5,760.00
165REMOVE BUS SHELTER & REINSTALL AFTER CONSTRUCTION INCLUDING ELECTRICAL AND SIGNAGE1.00EA 1.00 0.500.50$7,400.00$3,700.00
167RELOCATE PED PUSH BUTTON POST (COMPLETE)1.00EA 1.00 0.001.00$220.00$220.00
172TYPE 15 STANDARD (NEAR HIGH VOLTAGE)1.00EA 1.00 0.001.00$15,000.00$15,000.00
S-7FALSE CURB AT WHITTIER LS 1.00 0.001.00$8,850.00$8,850.00
S-7AFALSE CURB MATERIAL TEST LS 1.00 0.001.00$6,080.00$6,080.00
S-13DAMAGED LITTER RECEPTACLE LS 1.00 0.001.00$3,432.30$3,432.30
S-14DAMAGED PEDESTRIAN LIGHT POLE LS 1.00 0.001.00$5,203.53$5,203.53

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $8,325,399.45 $7,268,150.28 $1,057,249.17
Retained* $416,269.97 $363,407.51 $52,862.46
Deducted $0.00 $0.00 $0.00
Due $7,909,129.48 $6,904,742.77 $1,004,386.71



*This project has an escrow account.