| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 24.00 | MTH |
13.00
| 12.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.65
| 0.60 | 0.05 | $45,000.00 | $2,250.00 |
| 16 | OFFICE FACILITIES | 25.00 | MTH |
15.00
| 14.00 | 1.00 | $15,000.00 | $15,000.00 |
| 18 | TRAFFIC CONTROL | 1.00 | LS |
0.65
| 0.60 | 0.05 | $1,700,000.00 | $85,000.00 |
| 27 | CONCRETE REMOVAL (NON-REINFORCED) | 3,340.00 | CY |
2,005.30
| 1,950.83 | 54.47 | $240.00 | $13,072.80 |
| 29 | UNCLASSIFIED EXCAVATION | 23,912.00 | CY |
13,969.70
| 13,883.10 | 86.60 | $100.00 | $8,660.00 |
| 31 | CRUSHED MISCELLANEOUS BASE | 4,311.00 | CY |
3,465.68
| 3,389.54 | 76.14 | $235.00 | $17,892.90 |
| 33 | COLD MILL AC PAVEMENT (0 - 1-1/2") | 1,791,804.00 | SF |
1,130,898.40
| 822,320.60 | 308,577.80 | $0.35 | $108,002.23 |
| 34 | AC PAVEMENT(PATCH BACK) | 4,524.00 | TON |
1,495.81
| 1,482.81 | 13.00 | $180.00 | $2,340.00 |
| 36 | AC PAVEMENT(DIGOUTS) | 538.00 | TON |
365.77
| 323.75 | 42.02 | $385.00 | $16,177.70 |
| 38 | DOUBLE ADJUST MANHOLE | 21.00 | EA |
21.00
| 18.00 | 3.00 | $1,275.00 | $3,825.00 |
| 39 | PMAC PAVEMENT | 16,307.00 | TON |
10,194.55
| 7,223.37 | 2,971.18 | $130.00 | $386,253.40 |
| 43 | RECONSTRUCT CATCH BASIN TOP AND GRATE PER DETAILS ON SHEET 6 | 33.00 | EA |
2.00
| 0.00 | 2.00 | $8,500.00 | $17,000.00 |
| 44 | MASONRY RETAINING WALL PER STD PLAN 618 | 57.00 | SF |
57.00
| 0.00 | 57.00 | $255.00 | $14,535.00 |
| 46 | PCC CURB, TYPE A1-8 | 11,021.00 | LF |
7,582.08
| 7,538.00 | 44.08 | $33.00 | $1,454.64 |
| 47 | PCC CURB, TYPE A1-VAR | 876.00 | LF |
621.75
| 587.00 | 34.75 | $40.00 | $1,390.00 |
| 49 | PCC CURB & GUTTER, TYPE A2-8 | 2,067.00 | LF |
1,165.60
| 902.60 | 263.00 | $44.00 | $11,572.00 |
| 50 | PCC CURB & GUTTER, TYPE A2-VAR | 256.00 | LF |
92.50
| 28.00 | 64.50 | $50.00 | $3,225.00 |
| 57 | PCC WALK & DRIVEWAYS, 4" THICK | 38,431.00 | SF |
29,497.12
| 28,758.27 | 738.85 | $8.50 | $6,280.23 |
| 58 | PCC CURB RAMPS | 150.00 | CY |
118.90
| 97.27 | 21.63 | $1,200.00 | $25,956.00 |
| 59 | PCC DRIVEWAYS, 6" THICK | 4,910.00 | SF |
1,987.78
| 1,910.50 | 77.28 | $13.00 | $1,004.64 |
| 60 | DETECTABLE WARNING SURFACE | 960.00 | SF |
573.00
| 528.00 | 45.00 | $60.00 | $2,700.00 |
| 63 | LOCAL DEPRESSION PER STD PLAN 313, CASE F | 2.00 | EA |
2.00
| 0.50 | 1.50 | $1,800.00 | $2,700.00 |
| 71 | 1" CONDUIT (SCH 80 PVC) | 189.00 | LF |
110.00
| 80.00 | 30.00 | $60.00 | $1,800.00 |
| 72 | 2" CONDUIT (SCH 80 PVC) | 3,735.00 | LF |
3,478.00
| 3,420.00 | 58.00 | $70.00 | $4,060.00 |
| 75 | 2-PAIR DETECTOR LEAD-IN CABLE | 10,435.00 | LF |
9,129.00
| 6,331.00 | 2,798.00 | $4.50 | $12,591.00 |
| 76 | 12-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) | 9,685.00 | LF |
6,726.00
| 5,151.00 | 1,575.00 | $8.00 | $12,600.00 |
| 77 | 3-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) | 9,475.00 | LF |
6,249.00
| 4,839.00 | 1,410.00 | $5.00 | $7,050.00 |
| 84 | REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.) | 10.00 | EA |
4.00
| 3.00 | 1.00 | $2,000.00 | $2,000.00 |
| 106 | RELOCATE TYPE 332 CABINET (COMPLETE) | 6.00 | EA |
3.00
| 2.00 | 1.00 | $4,000.00 | $4,000.00 |
| 122 | FURNISH AND INSTALL 3" CONDUIT (SCH 40 PVC) | 6,405.00 | LF |
2,404.00
| 1,984.00 | 420.00 | $86.00 | $36,120.00 |
| 131 | LED LUMINAIRE (250 W HPS EQUIVALENT) | 33.00 | EA |
21.00
| 20.00 | 1.00 | $1,560.00 | $1,560.00 |
| 169 | PEDESTRIAN PUSH BUTTON | 46.00 | EA |
13.00
| 7.00 | 6.00 | $650.00 | $3,900.00 |
| 170 | PEDESTRIAN PUSH BUTTON PLATE | 46.00 | EA |
13.00
| 7.00 | 6.00 | $64.00 | $384.00 |
| 171 | PEDESTRIAN PUSH BUTTON POST | 11.00 | EA |
5.00
| 2.00 | 3.00 | $650.00 | $1,950.00 |
| 172 | PEDESTRIAN PUSH BUTTON POST FOUNDATION | 11.00 | EA |
4.00
| 1.00 | 3.00 | $830.00 | $2,490.00 |
| 204 | FURNISH AND PLANT 15 GALLON TREE | 187.00 | EA |
180.00
| 121.00 | 59.00 | $400.00 | $23,600.00 |
| 208 | DECOMPOSED GRANITE, 4" THICK | 5,834.00 | SF |
3,204.00
| 1,998.00 | 1,206.00 | $8.00 | $9,648.00 |
| 228 | PCC PAVEMENT (HIGH EARLY STRENGTH) | 456.00 | CY |
216.93
| 202.89 | 14.04 | $535.00 | $7,511.40 |
| 239 | #6 WIRE | 2,795.00 | LF |
2,109.00
| 1,374.00 | 735.00 | $4.00 | $2,940.00 |
| 240 | #10 WIRE | 23,740.00 | LF |
4,376.00
| 3,712.00 | 664.00 | $1.95 | $1,294.80 |
| S-21 | BATTERY BACKUP SYSTEM (BBS) | | EA |
1.00
| 0.00 | 1.00 | $11,440.00 | $11,440.00 |
| S-23 | EXTRA WORK AND TRAFFIC CONTROL SUPPORT | | T&M |
17,000.00
| 0.00 | 17,000.00 | $1.00 | $17,000.00 |
|