Los Angeles County Public Works
Project Management Division III
Progress Payment 5
Project Name: Florence Neighborhood Mobility (AHSC)
Contractor: Toro Enterprises, Inc.
P.O. Box 6285
Oxnard, CA 93031
Project ID: RDC0016428
Federal Number(s): None
Original Contract: $4,441,362.76
Awarded: 11/7/2025
Period Ending: 7/6/2026
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)12.00MTH 5.00 4.001.00$500.00$500.00
4IMPLEMENTATION OF THE LTWHP1.00LS 0.625 0.500.125$35,000.00$4,375.00
6IMPLEMENTATION OF THE SWPPP1.00LS 0.625 0.500.125$90,000.00$11,250.00
7OFFICE FACILITIES12.00MTH 5.00 4.001.00$6,900.00$6,900.00
17UNCLASSIFIED EXCAVATION3,383.00CY 3,015.50 2,600.00415.50$130.00$54,015.00
18UNCLASSIFIED FILL9.00CY 4.50 0.004.50$650.00$2,925.00
19CRUSHED MISCELLANEOUS BASE1,971.00CY 1,531.00 1,230.89300.11$105.00$31,511.55
21TRENCH BACKFILL SLURRY (CLASS 270-E-500)29.00CY 23.50 20.003.50$385.00$1,347.50
22AC PAVEMENT1,471.00TON 1,419.29 1,115.00304.29$180.00$54,772.20
25AC PAVEMENT (PATCHBACK)889.00SF 850.00 728.50121.50$10.00$1,215.00
26TEMPORARY AC PAVEMENT (PATCHBACK)367.00TON 5.00 0.005.00$345.00$1,725.00
28RECONSTRUCT MANHOLE12.00EA 8.00 6.002.00$7,500.00$15,000.00
30PCC PAVEMENT111.00CY 95.00 81.5113.49$460.00$6,205.40
32PARTIAL LOCAL DEPRESSION PER STD PLAN 313, CASE B1.00EA 4.00 3.001.00$800.00$800.00
33LOCAL DEPRESSION PER STD PLAN 313, CASE B1.00EA 1.00 0.001.00$1,100.00$1,100.00
36PCC CURB & GUTTER, TYPE A2-VAR2,174.00LF 1,640.00 1,342.87297.13$75.00$22,284.75
37PCC WALK, 4" THICK24,108.00SF 21,325.00 16,798.874,526.13$11.55$52,276.80
38PCC CURB RAMPS71.00CY 70.00 57.0312.97$2,400.00$31,128.00
39DETECTABLE WARNING SURFACE824.00SF 676.40 561.40115.00$32.00$3,680.00
46NO. 6 PULL BOX INCL PCC COVER11.00EA 8.00 5.003.00$2,510.00$7,530.00
47INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT3,150.00LF 1,575.00 650.00925.00$22.50$20,812.50
59REMOVE TYPE 1 FOUNDATION5.00EA 5.00 3.002.00$1,442.00$2,884.00
60REMOVE TYPE 15 FOUNDATION2.00EA 2.00 0.002.00$1,600.00$3,200.00
61REMOVE TYPE 19 FOUNDATION3.00EA 3.00 1.002.00$2,405.00$4,810.00
79TYPE 1 STANDARD FOUNDATION2.00EA 2.00 1.001.00$4,343.45$4,343.45
80TYPE 15 STANDARD FOUNDATION5.00EA 5.00 2.003.00$4,834.95$14,504.85
82TYPE 17 STANDARD FOUNDATION3.00EA 3.00 0.003.00$10,204.16$30,612.48
95PAVEMENT MARKINGS (THERMOPLASTIC)961.00SF 825.00 400.00425.00$9.30$3,952.50
9712" STRIPING (THERMOPLASTIC)1,251.00LF 705.00 225.00480.00$6.10$2,928.00
100REMOVE PAVEMENT MARKING4,337.00SF 2,345.00 45.002,300.00$3.20$7,360.00
101INSTALL FIRE HYDRANT LOCATION RPM22.00EA 9.00 0.009.00$20.00$180.00
114DETAIL 21 (THERMOPLASTIC)1,329.00LF 1,132.00 553.00579.00$1.90$1,100.10
12124" STRIPING (THERMOPLASTIC)8,520.00LF 5,200.00 2,182.503,017.50$8.90$26,855.75

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $3,133,587.31 $2,699,502.48 $434,084.83
Retained $156,679.37 $134,975.12 $21,704.25
Deducted $0.00 $0.00 $0.00
Due $2,976,907.94 $2,564,527.36 $412,380.58