Los Angeles County Public Works
Project Management Division III
Progress Payment 12
Project Name: Metro Gold Line Eastside Access Phase II Calvary Cemetery Pedestrian Path
Contractor: Los Angeles Engineering, Inc.
633 North Barranca Avenue
Covina, CA 91723
Project ID: RDC0016013
Federal Number(s): None
Original Contract: $8,533,000.00
Awarded: 4/4/2025
Period Ending: 7/6/2026
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)12.00MTH 12.00 11.001.00$500.00$500.00
4IMPLEMENTATION OF THE LTWHP1.00LS 0.95 0.920.03$25,000.00$750.00
6IMPLEMENTATION OF THE SWPPP1.00LS 0.95 0.920.03$45,000.00$1,350.00
12OFFICE FACILITIES12.00MTH 12.00 11.001.00$3,000.00$3,000.00
18UNCLASSIFIED EXCAVATION3,925.00CY 2,975.67 2,697.67278.00$135.00$37,530.00
20TRENCH BACKFILL SLURRY (CLASS 100-E-100)397.00CY 300.00 132.00168.00$150.00$25,200.00
67DETAIL 25 (THERMOPLASTIC)594.00LF 584.00 0.00584.00$1.50$876.00
73DETAIL 9 (THERMOPLASTIC)8,086.00LF 2,369.00 1,939.00430.00$1.50$645.00
76DETAIL 27B (THERMOPLASTIC)1,099.00LF 989.00 295.00694.00$1.50$1,041.00
77PAVEMENT MARKINGS (ONE-COAT PAINT)214.00SF 117.00 72.0045.00$3.40$153.00
78PAVEMENT MARKINGS (THERMOPLASTIC)1,902.00SF 904.50 707.50197.00$6.50$1,280.50
7912" STRIPING (THERMOPLASTIC)913.00LF 602.00 106.00496.00$4.50$2,232.00
8024" STRIPING (THERMOPLASTIC)1,762.00LF 1,571.50 306.501,265.00$9.00$11,385.00
814" STRIPING (THERMOPLASTIC)1,755.00LF 320.00 300.0020.00$0.60$12.00
826" STRIPING (THERMOPLASTIC)28.00LF 28.00 13.0015.00$0.90$13.50
87REMOVE DETAIL 22 (THERMOPLASTIC)3,827.00LF 3,511.00 3,362.00149.00$1.00$149.00
89REMOVE DETAIL 25 (THERMOPLASTIC)593.00LF 558.00 0.00558.00$1.00$558.00
90REMOVE DETAIL 29 (THERMOPLASTIC)358.00LF 338.00 0.00338.00$1.80$608.40
91REMOVE DETAIL 32 (THERMOPLASTIC)5,262.00LF 5,262.00 0.005,262.00$1.80$9,471.60
92REMOVE DETAIL 38 (THERMOPLASTIC)657.00LF 657.00 200.00457.00$1.00$457.00
95REMOVE DETAIL 27B (PAINT)12,283.00LF 11,194.00 3,676.007,518.00$0.60$4,510.80
97REMOVE PAVEMENT MARKINGS (THERMOPLASTIC)838.00SF 798.50 548.50250.00$3.00$750.00
98REMOVE 12" STRIPING (THERMOPLASTIC)1,755.00LF 924.00 198.00726.00$3.00$2,178.00
101SIGN PANEL7.00EA 7.00 0.007.00$150.00$1,050.00
102INSTALL ONE-POST (ROADSIDE SIGN)19.00EA 19.00 9.0010.00$300.00$3,000.00
103INSTALL SIGN (STRAP AND SADDLE BRACKET)7.00EA 7.00 2.005.00$125.00$625.00
104RELOCATE SIGN66.00EA 66.00 20.0046.00$200.00$9,200.00
105REMOVE SIGN16.00EA 16.00 1.0015.00$100.00$1,500.00
106REMOVE SIGN POST5.00EA 5.00 3.002.00$300.00$600.00
1133" CONDUIT572.00LF 550.00 450.00100.00$265.00$26,500.00
117PLATE HOLE TO SMOOTH FINISH1.00EA 1.00 0.001.00$820.00$820.00
131REALIGN VIDEO DETECTION ZONE1.00EA 1.00 0.001.00$6,100.00$6,100.00
169PED PUSH BUTTON1.00EA 1.00 0.001.00$670.00$670.00
170PED PUSH BUTTON PLATE2.00EA 2.00 0.002.00$50.00$100.00
S-15CLASS "A" TOPSOIL LS 1.00 0.001.00$49,900.00$49,900.00

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $8,530,115.25 $8,325,399.45 $204,715.80
Retained* $426,505.76 $416,269.97 $10,235.79
Deducted $0.00 $0.00 $0.00
Due $8,103,609.49 $7,909,129.48 $194,480.01



*This project has an escrow account.

Contact Office Engineer
Contractor Copy  
P Please consider the environment before printing this report.