| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 5.00 | MTH |
3.00
| 2.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.60
| 0.40 | 0.20 | $35,000.00 | $7,000.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
0.60
| 0.40 | 0.20 | $35,000.00 | $7,000.00 |
| 7 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
0.60
| 0.40 | 0.20 | $35,000.00 | $7,000.00 |
| 8 | REMOVAL AND DISPOSAL OF LBP/LCP WASTE | 1.00 | LS |
0.75
| 0.50 | 0.25 | $18,200.00 | $4,550.00 |
| 10 | IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN | 1.00 | LS |
0.60
| 0.40 | 0.20 | $20,000.00 | $4,000.00 |
| 11 | CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $35,000) | 35,000.00 | AL |
30,188.00
| 24,258.56 | 5,929.44 | $1.00 | $5,929.44 |
| 12 | OFFICE FACILITIES | 6.00 | MTH |
3.00
| 2.00 | 1.00 | $5,000.00 | $5,000.00 |
| 13 | MOBILIZATION | 1.00 | LS |
1.00
| 0.95 | 0.05 | $300,000.00 | $15,000.00 |
| 16 | TRASH RACK | 1.00 | LS |
0.125
| 0.00 | 0.125 | $250,000.00 | $31,250.00 |
| 18 | ACCESS HATCH | 1.00 | LS |
0.50
| 0.00 | 0.50 | $10,000.00 | $5,000.00 |
| 36 | CLEARING AND GRUBBING | 1.00 | LS |
0.03
| 0.025 | 0.005 | $200,000.00 | $1,000.00 |
| 40 | TRAFFIC CONTROL | 1.00 | LS |
0.60
| 0.40 | 0.20 | $35,000.00 | $7,000.00 |
| 42 | 3-INCH PVC SCHEDULE 80 CONDUIT FOR NAPLES PUMP STATION | 465.00 | LF |
354.00
| 165.00 | 189.00 | $200.00 | $37,800.00 |
| 43 | 4-INCH PVC SCHEDULE 80 CONDUIT FOR CORDOVA WALK PUMP STATION | 85.00 | LF |
63.75
| 14.00 | 49.75 | $200.00 | $9,950.00 |
| 44 | MANUAL TRANSFER SWITCH | 2.00 | EA |
0.27
| 0.10 | 0.17 | $50,000.00 | $8,500.00 |
| 46 | METERED MAIN SERVICE PANEL AND CONDUIT/WIRE | 1.00 | LS |
0.50
| 0.24 | 0.26 | $50,000.00 | $13,000.00 |
| 47 | DISTRIBUTION PANEL AND WIRE/CONDUIT | 2.00 | EA |
1.05
| 0.238 | 0.812 | $100,000.00 | $81,200.00 |
| 48 | MINI POWER CENTER/ZONE AND WIRE/CONDUIT | 2.00 | EA |
1.15
| 0.25 | 0.90 | $75,000.00 | $67,500.00 |
| 49 | MAIN PUMP CONTROL PANEL AND WIRE/CONDUIT | 5.00 | EA |
2.82
| 0.00 | 2.82 | $50,000.00 | $141,000.00 |
| 51 | CENTRAL CONTROLLER AND WIRE/CONDUIT | 2.00 | EA |
1.31
| 0.00 | 1.31 | $35,000.00 | $45,850.00 |
| 52 | ANNUNCIATOR PANEL AND WIRE/CONDUIT | 2.00 | EA |
1.18
| 0.00 | 1.18 | $25,000.00 | $29,500.00 |
| 53 | BUBBLER PANEL AND WIRE/CONDUIT | 2.00 | EA |
1.00
| 0.5184 | 0.4816 | $25,000.00 | $12,040.00 |
| 54 | FLOAT SWITCH ENCLOSURE AND WIRE/CONDUIT | 2.00 | EA |
1.25
| 0.00 | 1.25 | $25,000.00 | $31,250.00 |
| 55 | PRESSURE TANSDUCER ENCLOSURE AND WIRE/CONDUIT | 2.00 | EA |
1.12
| 0.00 | 1.12 | $25,000.00 | $28,000.00 |
| 56 | TELEMETRY CABINET WITH ANTENNA AND WIRE/CONDUIT | 2.00 | EA |
0.12
| 0.00 | 0.12 | $25,000.00 | $3,000.00 |
| 57 | GAS DETECTION PANEL WITH COMBUSTIBLE GAS SENSORS AND WIRE/CONDUIT | 2.00 | EA |
0.58
| 0.00 | 0.58 | $50,000.00 | $29,000.00 |
| 58 | INTRUSION ALARM PANEL WITH DOOR CONTACT SWITCH AND WIRE/CONDUIT | 2.00 | EA |
0.58
| 0.00 | 0.58 | $50,000.00 | $29,000.00 |
| 59 | LIGHTING AND WIRE/CONDUIT FOR CORDOVA WALK PUMP STATION | 1.00 | LS |
0.70
| 0.559 | 0.141 | $50,000.00 | $7,050.00 |
| 61 | GROUND ROD COPPER-CLAD (3/4" DIAMETER BY 10') | 4.00 | EA |
2.00
| 0.00 | 2.00 | $2,500.00 | $5,000.00 |
| 65 | TEMPORARY PUMP CONTROL PANEL AND WIRE/CONDUIT FOR NAPLES PUMP STATION | 1.00 | LS |
1.00
| 0.00 | 1.00 | $10,000.00 | $10,000.00 |
| 67 | TEMPORARY SUMP PUMP CONTROL PANEL AND WIRE/CONDUIT FOR NAPLES PUMP STATION | 1.00 | LS |
1.00
| 0.00 | 1.00 | $10,000.00 | $10,000.00 |
| 68 | PORTABLE GENERATOR RENTAL FOR CORDOVA WALK PUMP STATION | 6.00 | MO |
3.00
| 2.00 | 1.00 | $5,000.00 | $5,000.00 |
| 76 | SHORING OF OPEN EXCAVATIONS FOR CORDOVA WALK PUMP STATION | 1.00 | LS |
1.00
| 0.40 | 0.60 | $120,000.00 | $72,000.00 |
| 77 | SHORING OF OPEN EXCAVATIONS FOR NAPLES PUMP STATION | 1.00 | LS |
1.00
| 0.65 | 0.35 | $150,000.00 | $52,500.00 |
| 78 | MICROTUNNELING (DIRECTIONAL BORING) FOR NAPLES PUMP STATION | 450.00 | LF |
339.00
| 165.00 | 174.00 | $150.00 | $26,100.00 |
| S-1 | PUMP ANCHORAGE | | LS |
0.50
| 0.00 | 0.50 | $26,000.00 | $13,000.00 |
| S-5 | FURNISH AND INSTALL GROUNDING MATERIALS | | LS |
1.00
| 0.00 | 1.00 | $6,900.00 | $6,900.00 |
| S-6 | DISCHARGE PIPES REHAB ON NAPLES AND CORDOVA WALK PS | | LS |
0.40
| 0.00 | 0.40 | $17,564.91 | $7,025.96 |
|