| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 5.00 | MTH |
5.00
| 4.00 | 1.00 | $500.00 | $500.00 |
| 4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.90
| 0.80 | 0.10 | $35,000.00 | $3,500.00 |
| 5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
0.90
| 0.80 | 0.10 | $35,000.00 | $3,500.00 |
| 7 | IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN | 1.00 | LS |
0.90
| 0.80 | 0.10 | $35,000.00 | $3,500.00 |
| 10 | IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN | 1.00 | LS |
0.90
| 0.80 | 0.10 | $20,000.00 | $2,000.00 |
| 12 | OFFICE FACILITIES | 6.00 | MTH |
5.00
| 4.00 | 1.00 | $5,000.00 | $5,000.00 |
| 16 | TRASH RACK | 1.00 | LS |
0.90
| 0.25 | 0.65 | $250,000.00 | $162,500.00 |
| 17 | DISCHARGE PIPES PAINTING AND COATING | 1.00 | LS |
0.425
| 0.25 | 0.175 | $60,000.00 | $10,500.00 |
| 19 | MISCELLANEOUS MECHANICAL WORKS | 1.00 | LS |
0.50
| 0.25 | 0.25 | $200,000.00 | $50,000.00 |
| 20 | 16-INCHES VERTICAL MIXED FLOW PUMP WITH ELECTRIC MOTOR AT CORDOVA WALK PUMP STATION | 2.00 | EA |
1.50
| 1.176 | 0.324 | $200,000.00 | $64,800.00 |
| 21 | 16-INCHES VERTICAL MIXED FLOW PUMP WITH ELECTRIC MOTOR AT NAPLES PUMP STATION | 3.00 | EA |
2.55
| 2.40 | 0.15 | $200,000.00 | $30,000.00 |
| 24 | MISCELLANEOUS ELECTRICAL WORKS FOR CORDOVA WALK PUMP STATION | 1.00 | LS |
0.896
| 0.74 | 0.156 | $80,000.00 | $12,480.00 |
| 25 | MISCELLANEOUS ELECTRICAL WORKS FOR NAPLES PUMP STATION | 1.00 | LS |
0.896
| 0.74 | 0.156 | $80,000.00 | $12,480.00 |
| 36 | CLEARING AND GRUBBING | 1.00 | LS |
0.75
| 0.50 | 0.25 | $200,000.00 | $50,000.00 |
| 40 | TRAFFIC CONTROL | 1.00 | LS |
0.90
| 0.80 | 0.10 | $35,000.00 | $3,500.00 |
| 44 | MANUAL TRANSFER SWITCH | 2.00 | EA |
1.75
| 1.50 | 0.25 | $50,000.00 | $12,500.00 |
| 47 | DISTRIBUTION PANEL AND WIRE/CONDUIT | 2.00 | EA |
1.75
| 1.50 | 0.25 | $100,000.00 | $25,000.00 |
| 48 | MINI POWER CENTER/ZONE AND WIRE/CONDUIT | 2.00 | EA |
1.75
| 1.50 | 0.25 | $75,000.00 | $18,750.00 |
| 49 | MAIN PUMP CONTROL PANEL AND WIRE/CONDUIT | 5.00 | EA |
4.00
| 3.50 | 0.50 | $50,000.00 | $25,000.00 |
| 51 | CENTRAL CONTROLLER AND WIRE/CONDUIT | 2.00 | EA |
1.80
| 1.60 | 0.20 | $35,000.00 | $7,000.00 |
| 52 | ANNUNCIATOR PANEL AND WIRE/CONDUIT | 2.00 | EA |
1.75
| 1.50 | 0.25 | $25,000.00 | $6,250.00 |
| 53 | BUBBLER PANEL AND WIRE/CONDUIT | 2.00 | EA |
1.80
| 1.00 | 0.80 | $25,000.00 | $20,000.00 |
| 54 | FLOAT SWITCH ENCLOSURE AND WIRE/CONDUIT | 2.00 | EA |
1.80
| 1.50 | 0.30 | $25,000.00 | $7,500.00 |
| 55 | PRESSURE TANSDUCER ENCLOSURE AND WIRE/CONDUIT | 2.00 | EA |
1.75
| 1.24 | 0.51 | $25,000.00 | $12,750.00 |
| 56 | TELEMETRY CABINET WITH ANTENNA AND WIRE/CONDUIT | 2.00 | EA |
1.50
| 1.34 | 0.16 | $25,000.00 | $4,000.00 |
| 57 | GAS DETECTION PANEL WITH COMBUSTIBLE GAS SENSORS AND WIRE/CONDUIT | 2.00 | EA |
1.82
| 1.16 | 0.66 | $50,000.00 | $33,000.00 |
| 58 | INTRUSION ALARM PANEL WITH DOOR CONTACT SWITCH AND WIRE/CONDUIT | 2.00 | EA |
1.60
| 1.14 | 0.46 | $50,000.00 | $23,000.00 |
| 59 | LIGHTING AND WIRE/CONDUIT FOR CORDOVA WALK PUMP STATION | 1.00 | LS |
0.90
| 0.75 | 0.15 | $50,000.00 | $7,500.00 |
| 60 | LIGHTING AND WIRE/CONDUIT FOR NAPLES PUMP STATION | 1.00 | LS |
0.80
| 0.75 | 0.05 | $50,000.00 | $2,500.00 |
| 62 | GROUND WELL | 2.00 | EA |
1.00
| 0.00 | 1.00 | $5,000.00 | $5,000.00 |
| 68 | PORTABLE GENERATOR RENTAL FOR CORDOVA WALK PUMP STATION | 6.00 | MO |
5.00
| 4.00 | 1.00 | $5,000.00 | $5,000.00 |
| 69 | PORTABLE GENERATOR RENTAL FOR NAPLES PUMP STATION | 6.00 | MO |
0.50
| 0.00 | 0.50 | $5,000.00 | $2,500.00 |
| 72 | IMPLEMENTATION OF DEWATERING PLAN FOR CORDOVA WALK PUMP STATION (ALLOWANCE OF $25,000) | 25,000.00 | AL |
9,239.17
| 0.00 | 9,239.17 | $1.00 | $9,239.17 |
| 79 | 4-INCH PVC SCHEDULE 80 CONDUIT FOR NAPLES PUMP STATION | 160.00 | LF |
160.00
| 151.00 | 9.00 | $200.00 | $1,800.00 |
| S-1 | PUMP ANCHORAGE | | LS |
0.80
| 0.50 | 0.30 | $26,000.00 | $7,800.00 |
| S-6 | DISCHARGE PIPES REHAB ON NAPLES AND CORDOVA WALK PS | | LS |
0.80
| 0.50 | 0.30 | $17,564.91 | $5,269.47 |
| S-9 | REPAIR DISCHARGE PIPES | | LS |
0.75
| 0.00 | 0.75 | $13,500.00 | $10,125.00 |
| S-10 | RAPID SET CONCRETE | | LS |
0.80
| 0.00 | 0.80 | $60,000.00 | $48,000.00 |
| S-11 | REMOVE AND REPLACE SIDEWALK | | LS |
1.00
| 0.00 | 1.00 | $2,700.00 | $2,700.00 |
|